Network cabling and repair, Schofield Barracks, HI
A sources sought notice asking small businesses to show interest in a blanket purchase agreement for inside plant cable design, installation, testing and repair on Army networks, mainly in Hawaii.
Official title: MULTIPLE AWARD LAN/DLAN SIPR-NIPR BPA
- Deadline
- Dec 18, 11:59 PM HT
- 23 days left
- Who can respond
- Any business
- Market research, not a bid
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Schofield Barracks, HI
- Buyer: 0413 Aq HQ RCO-Hi
What they're buying
The ordering period is 5 years, and the notice asks for vendor interest only, not a bid.
Top catches
“Must hold and maintain an active SECRET security clearance.” FY27_NIPR-SIPR_Installation_BPA_PWS_Tracked_Changes Revised (22Oct26) - Clean.pdf, page 7
Key staff and anyone working in telecommunications rooms with SIPRNET gear need an active SECRET clearance. If you cannot field cleared people, do not bid.
“The Government will not furnish tools, installation materials, consumables, patch cords, jacks, patch panels, raceways, or mounting hardware.” FY27_NIPR-SIPR_Installation_BPA_PWS_Tracked_Changes Revised (22Oct26) - Clean.pdf, page 1
You must supply every tool, test instrument, cable, patch panel and mounting part. Each item must appear in a bill of materials that the COR approves before you buy it, so price that approval time into your schedule.
Read by AI (Claude Haiku) on Nov 20, 2026 from the notice and 1 of 1 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Inside plant structured cabling design, horizontal cable runs, and fiber and copper installation for NIPRNET and SIPRNET.
- Category 6A copper horizontal cable certified to Level IIIe/2G, and fiber with fusion splices tested by OTDR.
- Telecommunications room work: 19-inch racks, bonding to TGB/PBB under 0.1 ohms, dedicated L5-20R or L6-30R circuits, and FRT backboards.
- Machine-printed labels on every drop, faceplate and patch panel per the Pacific Labeling Guide. Handwritten labels fail inspection.
- Native test files (.flw, .sor), CAD/MicroStation as-built drawings, and engineering installation plans with a bill of materials.
- Troubleshooting and repair with an 8-working-hour response, emergency arrival in 2 to 4 hours after hours, and a 12-month workmanship warranty.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Secret clearance needed for key staff. Key staff and anyone working in telecommunications rooms with SIPRNET gear need an active SECRET clearance. If you cannot field cleared people, do not bid.
- Government furnishes no materials or tools. You must supply every tool, test instrument, cable, patch panel and mounting part. Each item must appear in a bill of materials that the COR approves before you buy it, so price that approval time into your schedule.
- Warranty costs at no extra charge. The warranty must cover labor, parts, shipping, testing and travel at no added cost. You must also pass manufacturer warranties of 20 to 25 years to the Government, so include these costs in your price.“The contractor shall guarantee the pass-through and formal transfer of all Original Equipment Manufacturer (OEM) component warranties” FY27_NIPR-SIPR_Installation_BPA_PWS_Tracked_Changes Revised (22Oct26) - Clean.pdf, page 2
- Lowest price wins, not best value. Award goes to the lowest price that is technically acceptable, so there is little room to add cost for travel or warranty terms. Price those items in before you respond.“will compete each requirement with award to lowest priced technically acceptable proposal” Notice text
- Work area is wider than the listed site. The SAM.gov record lists only Schofield Barracks, but the work statement also covers Alaska and other Indo-Pacific sites. Ask how travel to these sites will be handled, and price it into your fixed-price quote.“the State of Alaska, and other designated locations within the U.S. Indo-Pacific Command (USINDOPACOM) Area of Responsibility (AOR).” FY27_NIPR-SIPR_Installation_BPA_PWS_Tracked_Changes Revised (22Oct26) - Clean.pdf, page 1
- Remediation timing conflicts. The hazard clause says to notify the COR immediately, and also says to halt work and notify within 24 hours. Notify the COR at once, and do not start any remediation until written approval arrives.“The contractor shall immediately halt affected work and issue written notification to the COR within twenty-four (24) hours.” FY27_NIPR-SIPR_Installation_BPA_PWS_Tracked_Changes Revised (22Oct26) - Clean.pdf, page 1
Key terms
| Who can bid | Small businesses only (total small business set-aside)The set-aside applies to the whole requirement.SAM.gov record |
|---|---|
| Contract period | 5-year ordering period: 12-month base plus four 12-month optionsEach task order sets its own performance period.FY27_NIPR-SIPR_Installation_BPA_PWS_Tracked_Changes Revised (22Oct26) - Clean.pdf, page 2 |
| How they choose | Lowest priced technically acceptable (LPTA)Each requirement is awarded to the lowest price that meets the technical standard.Notice text |
| Contract type | Blanket purchase agreement with firm-fixed-price task ordersEach task order has its own price, and transportation and mobilization must be included in it.FY27_NIPR-SIPR_Installation_BPA_PWS_Tracked_Changes Revised (22Oct26) - Clean.pdf, page 2 |
How to respond
- Check SAM.gov for the response method. The notice does not say how to send a vendor interest response: Not stated.
- Before you respond by Friday, December 18, 2026, 23:59 (time zone -10:00 as written), confirm you have staff with active SECRET clearances and a BICSI RCDD for the project engineer role.
- If a solicitation follows, price every material item in a bill of materials for each task order proposal, due 15 business days after the RFP under deliverable A009.
- Do not start field work until the Government approves your quality control plan, due 30 calendar days after award.
Attached files
From SAM.gov. Download links open the original files.
- FY27_NIPR-SIPR_Installation_BPA_PWS_Tracked_Changes Revised (22Oct26) - Clean.pdfThe performance work statement with the scope, staffing, security and testing rules; you must read it in full, and it contains both original draft and revised wording, so check which applies. Read.
Not stated in what we read
- Estimated value of the BPA and of individual task orders.
- How and where to send a response to this notice.
- Whether and when a solicitation will follow.
- Quantities or dollar amounts for CLIN 0001 and CLIN 0002.
- Minimum and maximum ordering amounts under the BPA.
- Whether a site visit or pre-bid meeting will be held.
Notice text
The contractor shall provide all personnel, management, supervision, tools, testing apparatus, materials, Contractor-Furnished Material (CFM), transportation, and engineering services necessary to perform Inside Plant (ISP) structured cabling design, horizontal cable distribution, and fiber/copper installation, diagnostic troubleshooting, and repair across NIPRNET and SIPRNET physical layer infrastructure. The overarching operational objective is to modernize and sustain Department of Defense Information Network (DoDIN) physical transport architecture across US Army installations supported by the 30th Signal Battalion, Network Enterprise Center (NEC).
CLIN 0001 - Equipment for the installation of NIPR/SIPR requirement. CLIN 0002 - Services for the installation of NIPR/SIPR requirement. This posting is to determine the level of vendor interest for this opportunity which following approval/award will have a 5-year ordering period; will compete each requirement with award to lowest priced technically acceptable proposal.
As published on SAM.gov.
Contacts
- Chris Doyle, christopher.s.doyle.civ@army.mil, 8087878836
- Martin A. Celino, martin.a.celino.civ@army.mil, 808-745-8771
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 20, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 18, 11:59 PM HT23 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 541519, other computer related services, soonest deadline first.
- Department of Veterans AffairsTwo BD IV Prep units and software, San Diego VA
- Defense Health Agency (DHA)Notice of Intent to Sole Source - Web-Based Medication Compliance Software Platform
- National Aeronautics and Space AdministrationFluke Electronic Equipment
- Department of the Air ForceKeysight M9484C vector signal generator for F-16 work
- Department of Veterans AffairsAlertus emergency alert software support at Martinsburg, WV
- Office of the Assistant Secretary for Financial Resources (ASFR)GovDelivery Services
- Department of Veterans AffairsEnterprise database vulnerability scanning software for VA
- Department of Veterans AffairsVBECS blood bank software support, Hines, IL audits
Free · at most one email a morning
Get new notices from Department of the Army by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy