Ship charter to tow Navy acoustic array, Norfolk, VA
The Navy's Military Sealift Command wants a ship chartered to tow a passive acoustic array at 4 to 6 knots, 24 hours a day, for events of up to 60 days (the work statement still says 45).
Official title: N3220525R6003 - SURTASS-E RFP
- Deadline
- Dec 1, 1:00 PM ET
- 10 days left
- Last time
- $76.7M
- Likely Federated Maritime LLC
- Place
- Norfolk, VA
- Buyer: MSCHQ Norfolk
What they're buying
The charter is a fixed-price time charter with a one-year base period and options that run to about 4 years and 11 months.
Top catches
“The vessel shall be US Flagged.” A0003 Attachment 7_PWS (Performance Work Statement).docx
The notice allows a foreign-flagged ship that is reflagged US before delivery. The work statement says the vessel shall be US flagged. Ask which rule applies before you price a foreign-flagged ship, since reflagging may add cost and time.
“The vessel will tow a passive acoustic monitoring system, between 4-6 knots, 24hours/day for up to a 45-day event.” A0003 Attachment 7_PWS (Performance Work Statement).docx
The work statement says up to 45 days per tow. Amendment 0010 and the SF-1449 say 60 days, and the work statement was not changed to match. Price for 60 days and ask which figure governs, since a longer tow adds fuel, crew and off-hire exposure.
Read by AI (Claude Haiku) on Nov 18, 2026 from the notice and 17 of 30 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Tow a passive acoustic array at 4 to 6 knots, 24 hours a day, for events of up to 60 days (the work statement says 45).
- Provide at least 5,008 square feet of clear weldable deck for government ISO mission vans and a winch, with roughly 200 T-joint welds and roughly 650 fillet welds for the 7-van layout.
- Berth 30 government personnel inside the ship: 6 single staterooms and 24 people in 2 to 4 person rooms.
- Supply 150 kW of 3-phase power around the clock, 40 gallons per minute of seawater at 50 psi, up to 500 gallons per day of fresh wash water, and a 5-ton crane.
- Keep radiated noise within the ABS underwater noise limits, with test evidence from an accredited noise and vibration organization.
- Return the mission system to station within 4 days of receiving new gear, demobilize within 2 days, and give a 12-month maintenance schedule within 30 days of award.
Who did it before
$76.7M
on the contract that likely holds this work now: Federated Maritime LLC. It ended Oct 5, 2026.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Flag requirement conflicts. The notice allows a foreign-flagged ship that is reflagged US before delivery. The work statement says the vessel shall be US flagged. Ask which rule applies before you price a foreign-flagged ship, since reflagging may add cost and time.
- Tow event length is 45 or 60 days. The work statement says up to 45 days per tow. Amendment 0010 and the SF-1449 say 60 days, and the work statement was not changed to match. Price for 60 days and ask which figure governs, since a longer tow adds fuel, crew and off-hire exposure.
- Secret clearances and US citizen crew. Every crew member must be a US citizen. Deck officers must hold US SECRET clearances before they join the ship. Confirm that your people can meet this before you bid. Part V, which sets the citizenship and clearance rules, was not reviewed.“At least one corporate officer and all deck officers like the Master, Chief Mate, Second & Third Mate are required to hold a U.S. SECRET security clearance prior to assignment on the vessel.” A0003 Attachment 7_PWS (Performance Work Statement).docx
- Full off-hire for unstable platform. The off-hire guide applies a 100% deduction when the platform fails to stay stable in a defined sea state. The guide says it is not binding, but the contracting officer may adjust it. Price for stable towing in Sea State 5 and check the off-hire terms in the proforma.“Failure to maintain stable platform” A0003 Attachment 21_Guidelines for Off-Hire.pdf, page 2
- Fixed price covers all installation costs. The fixed price must cover cranes, labor, welding, class surveys, gas-free engineering and any shipyard shifts needed to meet the four-day return to mission. The deck welding diagram cannot be the basis for a request for more money, so price all of it up front.“All costs associated with these tasks shall be included in the contractor’s fixed price.” A0003 Attachment 7_PWS (Performance Work Statement).docx
- Submission rules sit in an unreviewed file. Part X of the proforma (Attachment 1) holds the offer instructions, and Part XI holds the evaluation terms. We could not review Attachment 1, so you must read it before you plan your offer. The notice text does not say how to submit.“SEE PROFORMA PART X” N3220525R60030010 SF-1449.pdf, page 13
Key terms
| Who can bid | Open to all sizes; no set-asideCrew must be US citizens, and deck officers need US SECRET clearances. |
|---|---|
| Contract period | 1-year base, three 1-year options, one 11-month optionAbout 4 years and 11 months in total if every option is exercised.Notice text |
| Contract type | Fixed-price time charter with reimbursable elementsThe SF-1449 lists a separate reimbursables line for each period.Notice text |
| Site visit | Government pre-delivery survey 10 to 30 days after awardThis comes after award. No pre-bid site visit is stated in the text provided.A0003 Attachment 7_PWS (Performance Work Statement).docx |
How to respond
- Read Attachment 1, the SPECIALTIME proforma, which we could not review. Its Part X holds the offer instructions. The notice text does not state where or how to send your offer.
- Acknowledge Amendment 0010 in your offer by one of the three methods in SF-30 Block 11. Offers must acknowledge each amendment before the deadline.
- Answer the technical items in Attachment 17, the Technical Evaluation Worksheet. These include an overseas port list for the past 5 years with a certification, noise test evidence, deck and stateroom drawings, and warranties.
- Complete Attachment 4, Basic Pricing Data, for the base period and each option. Enter fuel barrels per day from SPECIALTIME boxes 68 to 71, which we could not review. The DLA fuel prices are dated 1 Oct 2026.
- Send any questions on the Attachment 8 form to Ashley Smith at ashley.m.smith357.civ@us.navy.mil. The question deadline is not stated.
Attached files
- A0003 Attachment 13_ MSC SOM.pdf Not read: over our length limit.
- A0003 Attachment 21_Guidelines for Off-Hire.pdfGuidelines for off-hire deductions when the ship cannot perform. Read only. Read.
- A0003 Attachment 6_ Crew Complement.docx Not read: over our length limit.
- A0008 Attachment 4_Basic Pricing Data.xlsxPrice sheets for the base period and four option periods, plus fuel data. Fill it in. Read.
- A0003 Attachment 7_PWS (Performance Work Statement).docxThe work statement that sets what the ship must do, including deck, power, crew and noise rules. Read it in full and price against it. Read.
- Solicitation Amendment N3220525R60030006 SF 30.pdfAmendment 0006 updated the wage determination and moved the due date to 8 Oct 2026. Read only. Read.
- A0003 Attachment 10 _ CBRN.pdf Not read: over our length limit.
- Solicitation Amendment N3220525R60030007 SF 30.pdfAmendment 0007 moved the due date to 22 Oct 2026. Read only. Read.
- A0003 Attachment 17_Technical Evaluation Worksheet.xlsxTechnical items you must answer and warrant in your proposal. Fill it in. Read.
- A0006 Attachment 2_Wage Determination.pdf Not read: over our length limit.
- Solicitation Amendment N3220525R60030008 SF 30.pdfAmendment 0008 updated fuel prices and moved the due date to 5 Nov 2026. Read only. Read.
- A0003 Attachment 5_DD-254 Rev.pdf Not read: over our length limit.
- Solicitation Amendment N3220525R60030001 SF 30.pdfAmendment 0001 changed the issue and due dates. Read only. Read.
- A0004 Attachment 1_SPECIALTIME 2026 (02-26).docx Not read: over our length limit.
- A0003 Attachment 9_ ATFP.pdf Not read: over our length limit.
- A0003 Attachment 12_ SFLLL.pdf Not read: over our length limit.
- A0003 Attachment 3_ GFP.xlsx Not read: over our length limit.
- Solicitation Amendment N3220525R60030005 SF 30.pdfAmendment 0005 moved the due date to 24 Sep 2026. Read only. Read.
- Solicitation Amendment N3220525R60030002 SF 30.pdfAmendment 0002 added attachments and a Q and A file that we did not receive. Read only. Read.
- Solicitation Amendment N3220525R60030010 SF 30.pdfAmendment 0010 moved the due date to 1 Dec 2026 and changed the duration wording to 60 days. Read only. Read.
- A0003 Attachment 14_CDRL.pdf Not read: over our length limit.
- A0003 Attachment 16 _ MECSP.docx Not read: over our length limit.
- A0003 Attachment 8_Request for Clarifications.docxForm for questions to the Navy. Fill it in only if you ask a question. Read.
- Solicitation Amendment N3220525R60030009 SF 30.pdfAmendment 0009 moved the due date to 19 Nov 2026 and changed the time zone to EST. Read only. Read.
- Enclosure 1 for A0003_A0003 Changes.docx Not read: over our length limit.
- A0003 Attachment 20_ Reserved.xlsxShipyard work form marked Reserved. Read only, and ask whether it applies to you. Read.
- N3220525R60030010 SF-1449.pdfThe solicitation cover form. You complete blocks 12, 17, 23, 24 and 30, and sign block 30. Read.
- Solicitation Amendment N3220525R60030003 SF 30.pdfAmendment 0003 reopened the solicitation and reset the attachment list. Only pages 1 to 17 and 51 to 58 were provided. Read only. Read in part (pages 1–17 and 51–58 of 58).
- Enclosure 1 for Amendment 0002 _ QA_s.docx Not read: over our length limit.
- Solicitation Amendment N3220525R60030004 SF 30.pdfAmendment 0004 moved the due date to 10 Sep 2026 and added a WAWF payment clause. Read only. Read.
Not stated in what we read
- Estimated value or charter rate range. The notice text does not give one.
- Where and how to submit your offer, and the format required. Part X of Attachment 1 was not reviewed.
- How offers are evaluated and whether price or technical merit decides award. Part XI of Attachment 1 was not reviewed.
- The deadline for questions and whether answers will be shared with all bidders.
- The wage rates in Attachment 2, wage determination 2019-0288 Rev 27, which we could not review.
- Whether fuel is reimbursed to you, and the SPECIALTIME fuel boxes 68 to 71 behind the fuel estimate.
Notice text
***17 November 2026*** Amendment 0010 is hereby issued extending the due date from 19 November 2026 1:00pm Local Time (EST) to 01 December 2026 1:00pm Local Time (EST). Update SF-1449 Requirement Description box third sentence to read "60-day event" instead of 45. ***03 November 2026*** Amendment 0009 is hereby issued extending the due date from 05 November 2026 1:00pm Local Time (EST) to 19 November 2026 1:00pm Local Time (EST). ***21 October 2026*** Amendment 0008 is hereby issued updating Attachment 4 (Basic Pricing Data Sheet) to update posted DLA fuel prices as of 01 October 2026 and extending the due date from 22 October 2026 1:00pm Local Time (EDT) to 05 November 2026 1:00pm Local Time (EST). ***05 October 2026*** AMENDMENT 0007 IS HEREBY ISSUED UPDATING THE DUE DATE FROM 08 OCT 2026, 1:00pm LOCAL TIME (EDT) TO 22 OCT 2026, 1:00pm LOCAL TIME (EDT). SEE UPDATED SF1449 PER AMENDMENT 0007 ALONG WITH THE SF-30 FOR THIS AMENDMENT ADDED ON 05 OCT 2026. ***22 September 2026*** Amendment 0006 is hereby issued updating Attachment 2 (Wage Determination) and extending the due date from 24 September 2026 1:00pm Local Time (EDT) to 08 October 2026 1:00pm Local Time (EDT). ***08 September 2026*** AMENDMENT 0005 IS HEREBY ISSUED UPDATING THE DUE DATE FROM 10 SEPT 2026, 1:00pm LOCAL TIME (EDT) TO 24 SEPT 2026, 1:00pm LOCAL TIME (EDT). SEE UPDATED SF1449 PER AMENDMENT 0005 ALONG WITH THE SF-30 FOR THIS AMENDMENT ADDED ON 08 SEPT 2026. ***26 August 2026*** AMENDMENT 0004 IS HEREBY ISSUED UPDATING THE DUE DATE TO 10 SEPT 2026. ADDITIONALLY, SEE UPDATED PROFORMA ATTACHMENT AND SF1449_0004 POSTED ON 26 AUGUST 2026. ***05 August 2026*** Amendment A0003 is hereby issued updating and re-opening the solicitation. See attachments for details. ***02 OCT 2025. RFP Amendment A0002 is hereby issued. (Attachment 16 has been added to address questions submitted by potential offerors). Updated versions of Attachment 3, Attachment 6, Attachment 7, Attachment 8, Attachment 9, Attachment 12, Attachment 13, and Attachment 14 have been uploaded. See attached [SF-30] and [SF1449] for full details. Nothing from the SF1449 Changed from A0001 to A0002 and the only change from the orginial posting is the issue date and due date (Box 6 and 8) as outlined in A0001. All other things remain unchanged. ***29 SEP 2025. RFP Amendment A0001 is hereby issued to update the RFP Issue Date and Response Date. See attached [SF-30] for full details. See SF1449 and Related Attachments for details The solicitation will be a fixed-priced time charter with reimbursable elements, with a performance period of one (1) year base period and will be followed by three (3) 1-year option periods and one 11-month option period. The solicitation will require a time charter of one US flagged or foreign flagged vessel (to be reflagged US prior to delivery of vessel) required to tow an acoustic array in support of U.S. Navy Operations. The vessel will tow a passive acoustic monitoring system, between 4-6 knots, 24hrs/day for up to a 60-day event. The ship will need to be able to tow on a directed heading within 5 degrees for extended periods at slow speed. Because of the type of acoustic system employed, the ability of the vessel to maintain heading stability is critical. The vessel must be capable of worldwide operations, including support in all ocean basins of the world from the Arctic to the Antarctic during all periods of time. The vessel is expected to operate in open water in the vicinity of the Marginal Ice Zone (MIZ) and must be capable of surviving encounter with young open ice, as specified by ABS, Ice Class D0.
As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.
Contacts
- Ashley M. Smith-Sallinger, ashley.m.smith357.civ@us.navy.mil, 15642267556
- F. Carley Orvin, franklin.c.orvin.civ@us.navy.mil, 904-968-0146
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at Department of the Navy for the same kind of work (NAICS 483111, service code V124) in Virginia that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| N103B / N321B / O. Bisiriyu / Time Tanker Charter - Medium Range Tanker #1 Base Period - Charter Hire, Reimbursable, and Delivery Bonus.Federated Maritime LLC · N3220523C4224 | $76,718,374 | Oct 5, 2026ended | VA |
| N103/PM4 / R. Norris / Towing&Salvage Vessel (Charter) - MV Gary ChouestAlpha Marine Services LLC · N3220524C4114 | $32,489,599 | Sep 30, 2026ended | VA |
| Time Charter for Cable Laying ShipTransoceanic Cable Ship Company LLC · N3220526C0009 | $21,088,989 | Sep 30, 2026ended | VA |
| N103B / PM2 / J. Dassow / Time Charter for Cable Laying Ship.Transoceanic Cable Ship Company LLC · N3220524C4228 | $155,139,043 | Jan 22, 2027in 2 months | VA |
| ICE Class Tanker Time Charter Award Elogan / N103B / N321Crowley Government Services, Inc. · N3220522C4172 | $115,732,718 | Feb 18, 2027in 2 months | VA |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 18, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 1, 1:00 PM ET10 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 483111, deep sea freight transportation, soonest deadline first.
- Department of the Navy60-day Jones Act fuel tanker charter, US West Coast
- Department of the NavyOne tanker charter to ship jet fuel to Darwin, Australia
- Defense Logistics AgencyRequest for Information (RFI) – Market Research for Ocean Transportation of Hazardous Waste (Guam to CONUS)
- Department of the Navy25-day ship charter for military cargo, Gdansk to Texas
- Department of the NavyExtended Term Time Charter / Consolidated Cargo Operations (Consol) Capable Combination Container/Breakbulk Vessel
- Department of the Navy120-day fuel tanker charter, Greece
- US Transportation Command (Ustranscom)Voluntary Tanker Agreement (VTA)
- US Transportation Command (Ustranscom)Voluntary Intermodal Sealift Agreement (VISA) - 2024 Renewal
Free · at most one email a morning
Get new notices from Department of the Navy by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Navy, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy