Ship charter to tow Navy acoustic array, Norfolk, VA
Military Sealift Command wants one ship to tow a Navy passive acoustic array at 4-6 knots, 24 hours a day, for up to 45 days per event under the latest amendment, anywhere in the world.
Official title: N3220525R6003 - SURTASS-E RFP
- Deadline
- Dec 30, 1:00 PM ET
- 34 days left
- Last time
- $76.7M
- Likely Federated Maritime LLC
- Place
- Norfolk, VA
- Buyer: MSCHQ Norfolk
What they're buying
The contract is a fixed-price time charter with a one-year base period, three 1-year options and one 11-month option.
Top catches
“The vessel shall be US Flagged.” A0003 Attachment 7_PWS (Performance Work Statement).docx
The statement of work says the vessel must be US flagged, but the notice accepts a foreign-flagged ship reflagged US before delivery. Ask the contracting officer which rule applies before you price a foreign-flag ship.
“24 hours daily for 60 days continuously during normal towing operations” A0003 Attachment 17_Technical Evaluation Worksheet.xlsx
Amendment 0011 sets the event at up to 45 days, but the technical worksheet still asks you to warrant 60 days of continuous towing. Ask which figure governs, because a 60-day warranty costs more to meet.
Read by AI (Claude Haiku) on Nov 26, 2026 from the notice and 18 of 31 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Tow a passive acoustic array at 4-6 knots, 24 hours a day, holding heading within 5 degrees, for up to 45 days per event under Amendment 0011.
- Provide a clear weldable deck of at least 5,008 sq ft for Navy vans, a 36 ft by 31.7 ft stern section, and no obstruction over 15 ft behind the vans.
- Provide berths for 30 government personnel: six single staterooms and 24 people in two- to four-person staterooms.
- Supply 150 kW of 440-480 VAC power, 500 gallons a day of fresh water, 40 gallons a minute of seawater at 50 psi, and a 5-ton crane.
- Install Navy vans within four calendar days of receipt and remove them within two days, with six change-outs during the year on 72-hour notice.
- Carry 60 days at sea without replenishment and transit 4,000 NM non-stop at 10 knots minimum, while meeting radiated noise limits.
Who did it before
$76.7M
on the contract that likely holds this work now: Federated Maritime LLC. It ended Oct 5, 2026.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Flag rule conflicts. The statement of work says the vessel must be US flagged, but the notice accepts a foreign-flagged ship reflagged US before delivery. Ask the contracting officer which rule applies before you price a foreign-flag ship.
- Mission length: 45 or 60 days. Amendment 0011 sets the event at up to 45 days, but the technical worksheet still asks you to warrant 60 days of continuous towing. Ask which figure governs, because a 60-day warranty costs more to meet.
- Officers need SECRET clearances. The Master, all deck officers and at least one corporate officer must hold a U.S. SECRET clearance before assignment, and the whole crew must be U.S. citizens. If your crew cannot meet this, you should not bid.“At least one corporate officer and all deck officers like the Master, Chief Mate, Second & Third Mate are required to hold a U.S. SECRET security clearance prior to assignment on the vessel.” A0003 Attachment 7_PWS (Performance Work Statement).docx
- Attachments you cannot review. Attachment 1 (the SPECIALTIME proforma) likely holds the instructions and evaluation rules, and the wage determination and crew complement are also not reviewed here. You must read these yourself before you price the bid.“See Attachment (1), PART II(r) regarding the Order of Precedence.” SF1449 - N3220525R60030011 per A0011.pdf, page 5
- You pay for Navy van installation. Your fixed price must cover cranes, welding, gas-free engineering and class surveyors to install and remove Navy vans. The PWS gives two weld counts (about 200 T-joint welds and about 650 fillet welds), so ask which one to price.“Contractor is responsible for any cost associated with installation of Government Equipment to include, but not limited, to welders, gas free engineering, class surveyors, etc.” A0003 Attachment 7_PWS (Performance Work Statement).docx
- Noise failures cost you money. If the ship later fails the radiated noise limits, you pay to restore compliance, and the government may retest on delivery. Get accredited noise test evidence for the specific hull before you commit to a bid price.“If at any time it is determined the vessel does not meet the PWS requirements, the cost to regain compliance is the responsibility of the Contractor.” A0003 Attachment 7_PWS (Performance Work Statement).docx
Key terms
| Who can bid | Open to all firms; no set-aside on this noticeCrew citizenship and SECRET clearance rules still apply. A HUBZone price preference clause is also listed.SAM.gov record |
|---|---|
| Contract period | 1 year base, then three 1-year options and one 11-month optionFixed-price time charter with reimbursable elements.Notice text |
| Contract type | Fixed-price time charter with reimbursable elementsBase period charter hire is firm fixed price, with reimbursables as a separate line.Notice text |
| Site visit | Government site survey 10 to 30 days after award; no pre-bid visit statedThe survey checks deck layout, power locations and obstructions for Navy equipment.A0003 Attachment 7_PWS (Performance Work Statement).docx |
How to respond
- Confirm the offer is due Wednesday, 30 December 2026, 1:00 PM EST, per Amendment 0011, and that you acknowledge receipt of the amendment as block 11 of the SF30 requires.
- Ask questions in writing to Ashley Smith at ashley.m.smith357.civ@us.navy.mil using the Attachment 8 clarification form; the question deadline is not stated.
- Submission address, method and file format: Not stated. Confirm them with the contracting officer before the deadline.
- Include the technical warranties and drawings listed in Attachment 17, including the deck, stateroom and stern-area drawings.
- Complete the Attachment 4 pricing sheets for the base period and each option, and the offer cover form blocks the SF1449 says the offeror must complete.
Attached files
From SAM.gov. Download links open the original files.
- A0003 Attachment 13_ MSC SOM.pdf Not read: over our length limit.
- A0003 Attachment 21_Guidelines for Off-Hire.pdfGuidelines for charter deductions when the ship fails readiness standards; read it, since it sets pay cuts up to 100 percent. Read.
- A0003 Attachment 6_ Crew Complement.docx Not read: over our length limit.
- A0008 Attachment 4_Basic Pricing Data.xlsxPricing sheets for the base and option periods plus DLA fuel prices; you must fill in the cost lines. Read.
- A0003 Attachment 7_PWS (Performance Work Statement).docxPerformance work statement with the technical and deck requirements you must meet and price; read in full. Read.
- Solicitation Amendment N3220525R60030006 SF 30.pdfUpdated the wage determination and moved the due date to 08 Oct 2026; superseded. Read.
- A0003 Attachment 10 _ CBRN.pdf Not read: over our length limit.
- Solicitation Amendment N3220525R60030007 SF 30.pdfMoved the due date to 22 Oct 2026; superseded. Read.
- A0003 Attachment 17_Technical Evaluation Worksheet.xlsxTechnical worksheet with warranties and drawings the offeror must provide with its offer. Read.
- A0006 Attachment 2_Wage Determination.pdf Not read: over our length limit.
- Solicitation Amendment N3220525R60030008 SF 30.pdfUpdated Attachment 4 fuel prices and moved the due date to 05 Nov 2026; superseded. Read.
- A0003 Attachment 5_DD-254 Rev.pdf Not read: over our length limit.
- Solicitation Amendment N3220525R60030001 SF 30.pdfFirst amendment setting the issue and due dates; superseded by later amendments. Read.
- A0004 Attachment 1_SPECIALTIME 2026 (02-26).docx Not read: over our length limit.
- A0003 Attachment 9_ ATFP.pdf Not read: over our length limit.
- A0003 Attachment 12_ SFLLL.pdf Not read: over our length limit.
- A0003 Attachment 3_ GFP.xlsx Not read: over our length limit.
- Solicitation Amendment N3220525R60030005 SF 30.pdfMoved the due date to 24 Sep 2026; superseded. Read.
- SF1449 - N3220525R60030011 per A0011.pdfOffer cover form with the current due date and requirement text; the offeror must complete blocks 12, 17, 23, 24 and 30. Read.
- Solicitation Amendment N3220525R60030002 SF 30.pdfAdded Attachment 16 with questions and answers and updated several attachments; read it. Read.
- Solicitation Amendment N3220525R60030010 SF 30.pdfMoved the due date to 01 Dec 2026 and changed the event to 60 days; superseded. Read.
- A0003 Attachment 14_CDRL.pdf Not read: over our length limit.
- A0003 Attachment 16 _ MECSP.docx Not read: over our length limit.
- Solicitation Amendment N3220525R60030011 SF 30.pdfCurrent amendment: due date 30 Dec 2026, 1:00 PM, and event changed back to 45 days; acknowledge receipt per block 11. Read.
- A0003 Attachment 8_Request for Clarifications.docxBlank clarification question form; fill it in if you need to ask questions. Read.
- Solicitation Amendment N3220525R60030009 SF 30.pdfMoved the due date to 19 Nov 2026 and changed the time zone to EST; superseded. Read.
- Enclosure 1 for A0003_A0003 Changes.docx Not read: over our length limit.
- A0003 Attachment 20_ Reserved.xlsxShipyard work form marked Reserved; it appears unused, so read only. Read.
- Solicitation Amendment N3220525R60030003 SF 30.pdfReopened the solicitation and added Attachment 1; only pages 1-15 and 52-58 were provided, so read the rest on SAM.gov. Read in part (pages 1–15 and 52–58 of 58).
- Enclosure 1 for Amendment 0002 _ QA_s.docx Not read: over our length limit.
- Solicitation Amendment N3220525R60030004 SF 30.pdfMoved the due date to 10 Sep 2026 and added the WAWF invoicing clause; read it for invoicing. Read.
Not stated in what we read
- Total contract value or estimated price: Not stated, and the pricing sheets are blank.
- Evaluation method and award basis: these are likely in Attachment 1 (SPECIALTIME proforma), which we could not review.
- How and where to submit the offer, and in what format: Not stated in the text we could read.
- Question deadline: Not stated.
- Which event length governs, 45 or 60 days, since the worksheet and amendment disagree.
- Crew and service wage rates: the Attachment 2 wage determination was not reviewed.
Notice text
***25 November 2026*** Amendment 0011 is hereby issued extending the due date from 01 December 2026 1:00pm Local Time (EST) to 30 December 2026 1:00pm Local Time (EST). Update SF-1449 Requirement Description box third sentence to read "45-day event" instead of 60. Please reference PWS Attachment 7's Table under 1.7, section 2.a.1 and 2.a.2 for clarification. ***17 November 2026*** Amendment 0010 is hereby issued extending the due date from 19 November 2026 1:00pm Local Time (EST) to 01 December 2026 1:00pm Local Time (EST).
Update SF-1449 Requirement Description box third sentence to read "60-day event" instead of 45. ***03 November 2026*** Amendment 0009 is hereby issued extending the due date from 05 November 2026 1:00pm Local Time (EST) to 19 November 2026 1:00pm Local Time (EST). ***21 October 2026*** Amendment 0008 is hereby issued updating Attachment 4 (Basic Pricing Data Sheet) to update posted DLA fuel prices as of 01 October 2026 and extending the due date from 22 October 2026 1:00pm Local Time (EDT) to 05 November 2026 1:00pm Local Time (EST). ***05 October 2026*** AMENDMENT 0007 IS HEREBY ISSUED UPDATING THE DUE DATE FROM 08 OCT 2026, 1:00pm LOCAL TIME (EDT) TO 22 OCT 2026, 1:00pm LOCAL TIME (EDT).
SEE UPDATED SF1449 PER AMENDMENT 0007 ALONG WITH THE SF-30 FOR THIS AMENDMENT ADDED ON 05 OCT 2026. ***22 September 2026*** Amendment 0006 is hereby issued updating Attachment 2 (Wage Determination) and extending the due date from 24 September 2026 1:00pm Local Time (EDT) to 08 October 2026 1:00pm Local Time (EDT). ***08 September 2026*** AMENDMENT 0005 IS HEREBY ISSUED UPDATING THE DUE DATE FROM 10 SEPT 2026, 1:00pm LOCAL TIME (EDT) TO 24 SEPT 2026, 1:00pm LOCAL TIME (EDT).
SEE UPDATED SF1449 PER AMENDMENT 0005 ALONG WITH THE SF-30 FOR THIS AMENDMENT ADDED ON 08 SEPT 2026. ***26 August 2026*** AMENDMENT 0004 IS HEREBY ISSUED UPDATING THE DUE DATE TO 10 SEPT 2026. ADDITIONALLY, SEE UPDATED PROFORMA ATTACHMENT AND SF1449_0004 POSTED ON 26 AUGUST 2026. ***05 August 2026*** Amendment A0003 is hereby issued updating and re-opening the solicitation. See attachments for details. ***02 OCT 2025. RFP Amendment A0002 is hereby issued.
(Attachment 16 has been added to address questions submitted by potential offerors). Updated versions of Attachment 3, Attachment 6, Attachment 7, Attachment 8, Attachment 9, Attachment 12, Attachment 13, and Attachment 14 have been uploaded. See attached [SF-30] and [SF1449] for full details. Nothing from the SF1449 Changed from A0001 to A0002 and the only change from the orginial posting is the issue date and due date (Box 6 and 8) as outlined in A0001.
All other things remain unchanged. ***29 SEP 2025. RFP Amendment A0001 is hereby issued to update the RFP Issue Date and Response Date. See attached [SF-30] for full details. See SF1449 and Related Attachments for details The solicitation will be a fixed-priced time charter with reimbursable elements, with a performance period of one (1) year base period and will be followed by three (3) 1-year option periods and one 11-month option period. The solicitation will require a time charter of one US flagged or foreign flagged vessel (to be reflagged US prior to delivery of vessel) required to tow an acoustic array in support of U.S. Navy Operations.
The vessel will tow a passive acoustic monitoring system, between 4-6 knots, 24hrs/day for up to a 60-day event. The ship will need to be able to tow on a directed heading within 5 degrees for extended periods at slow speed. Because of the type of acoustic system employed, the ability of the vessel to maintain heading stability is critical. The vessel must be capable of worldwide operations, including support in all ocean basins of the world from the Arctic to the Antarctic during all periods of time.
The vessel is expected to operate in open water in the vicinity of the Marginal Ice Zone (MIZ) and must be capable of surviving encounter with young open ice, as specified by ABS, Ice Class D0.
As published on SAM.gov.
Contacts
- Ashley M. Smith-Sallinger, ashley.m.smith357.civ@us.navy.mil, 15642267556
- F. Carley Orvin, franklin.c.orvin.civ@us.navy.mil, 904-968-0146
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at Department of the Navy for the same kind of work (NAICS 483111, service code V124) in Virginia that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| N103B / N321B / O. Bisiriyu / Time Tanker Charter - Medium Range Tanker #1 Base Period - Charter Hire, Reimbursable, and Delivery Bonus.Federated Maritime LLC · N3220523C4224 | $76,718,374 | Oct 5, 2026ended | VA |
| N103B / PM2 / J. Dassow / Time Charter for Cable Laying Ship.Transoceanic Cable Ship Company LLC · N3220524C4228 | $155,139,043 | Jan 22, 2027in 1 month | VA |
| N103/PM4 / R. Norris / Towing&Salvage Vessel (Charter) - MV Gary ChouestAlpha Marine Services LLC · N3220524C4114 | $32,489,599 | Sep 30, 2026ended | VA |
| Time Charter for Cable Laying ShipTransoceanic Cable Ship Company LLC · N3220526C0009 | $21,088,989 | Sep 30, 2026ended | VA |
| ICE Class Tanker Time Charter Award Elogan / N103B / N321Crowley Government Services, Inc. · N3220522C4172 | $115,732,718 | Feb 18, 2027in 2 months | VA |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 26, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 30, 1:00 PM ET34 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 483111, deep sea freight transportation, soonest deadline first.
- Department of the Navy25-day ship charter for military cargo, Gdansk to Texas
- Department of the NavyAbout 120-day tanker charter for military fuel, Greece
- Department of the NavyNavy charter of a cargo vessel, Norfolk or San Diego
- Department of the Navy900-TEU ammunition container ship charter
- Department of the Navy120-day fuel tanker charter, Greece
- US Transportation Command (Ustranscom)Clean fuel tanker charters for worldwide military sealift
- US Transportation Command (Ustranscom)Contingency ship charter capacity, Scott AFB, IL
Free · at most one email a morning
Get new notices from Department of the Navy by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Navy, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy