- Opportunities
- Library of Congress
- 030ADV27R0008
USB breath switch for talking-book players, Washington DC
The Library of Congress wants a new USB breath switch that lets patrons control NLS Digital Talking Book Machines by puffs and sucks, plus a new technical data package.
Official title: NLS DTBM Breath Switch
- Deadline
- Nov 27, 5:00 PM ET
- 2 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Washington, DC
- Buyer: Contracts Services
What they're buying
It is a single-award, five-year IDIQ with a $3,000,000.00 ceiling and an internal estimate of about 450 units per year.
Top catches
“Proposals must be submitted only via email.” 030ADV27R0008 0001.pdf, page 3
SAM.gov uploads will not be accepted. Send your full offer by email to the contracting officer, with the contract specialist copied, before the deadline.
“All proposals are now due no later than 11/27/2026 at 5PM Eastern Time.” 030ADV27R0008 0001.pdf, page 1
The original due date of 11-25-2026 has been replaced. Plan to send your offer by 5:00 PM Eastern Time on Friday 11/27/2026, and do not work from the old date on the original form.
Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 27 of 116 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Design a new USB breath switch: micro controller and circuitry, USB-A connector, housing, and a 6-foot clear silicone mouth tube with inline filter and garment clip.
- Write a new technical data package with 3D CAD (STEP files accepted), 2D drawings, schematics, PCB Gerber files, and firmware.
- Build production tooling, test equipment and test procedures. The enclosure must be injection molded and snap-fit, close to 1.0 x 1.0 x 1.5 inches.
- Deliver 20 first-production samples within six months of the start date, then 20 annual samples and about 450 units per year, each with a factory acceptance test.
- Ship units F.O.B. destination, half to Fairfield, OH and half to Salt Lake City, UT, in individually labeled cartons with no more than 20 per overpack.
- Provide a 24-month warranty with repair or replacement within 30 days at your shipping cost, and care for six Government-furnished DTBMs.
Who supplied it lately
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Email is the only route. SAM.gov uploads will not be accepted. Send your full offer by email to the contracting officer, with the contract specialist copied, before the deadline.
- Due date moved to 11/27. The original due date of 11-25-2026 has been replaced. Plan to send your offer by 5:00 PM Eastern Time on Friday 11/27/2026, and do not work from the old date on the original form.
- ISO 9001 certificate needed. Your quality system must hold ISO 9001 certification from an accredited third-party registrar before performance starts. A subcontractor's certificate or a DLA audit does not replace it, so check your certification status and audit schedule before you bid.“the successful offeror must obtain the required certification prior to the commencement of contract performance” Attachment J5 Questions and Answers.pdf, page 1
- Library owns all design work. The Library will own the designs, source code, PCB files and tooling made under this contract. You cannot keep your own background design or tooling for other sales, so decide this before you price.“No, the Library requires ownership of mechanical and electronics designs, source code, PCB Gerbers, tooling etc.” Attachment J5 Questions and Answers.pdf, page 4
- Three months for design work. The design phase runs from 02/25/2027 to 05/24/2027. In that window you must deliver the new technical data package within 90 days, a verification test plan within 30 days, and firmware. Check that your team can meet this before you bid.“PERIOD OF PERFORMANCE: 02/25/2027 - 05/24/2027” 030ADV27R0008.pdf, page 4
- Buy American rules apply. The Buy American clause for supplies is checked, so the breath switch must be a domestic end product. Trace the origin of every part and list any foreign items on the Section K certificate.“52.225-1, Buy American—Supplies (OCT 2022) (41 U.S.C. chapter 83).” 030ADV27R0008.pdf, page 29
Key terms
| Who can bid | Not stated (no set-aside shown)The form appears to mark the buy as unrestricted. The size standard is not stated.030ADV27R0008.pdf, page 1 |
|---|---|
| Contract period | Base year plus four option years, 02/25/2027 to 02/24/2032Each option year must be exercised every year for the contract to stay active.030ADV27R0008.pdf, page 5 |
| How they choose | Best value trade-off, single firm-fixed-price IDIQ awardPrice is one factor. The Library may pick a higher-priced offer that gives a better technical solution.030ADV27R0008.pdf, page 59 |
| How to submit | Email only: bcurl@loc.gov, copy jacmiller@loc.govOffers sent through SAM.gov or any other means will not be accepted.030ADV27R0008 0001.pdf, page 3 |
| Questions due | Thursday, 11/12/2026, 5:00 PM Eastern Time (passed)Questions are closed. Answers are in Attachment J-5.030ADV27R0008 0001.pdf, page 3 |
| Estimated value | Ceiling of $3,000,000.00 over five yearsMinimum order is $10,000.00. The annual quantities are internal estimates, not a guarantee of work.030ADV27R0008.pdf, page 6 |
| Contract type | Single-award IDIQ, firm-fixed priceOrders are placed on a firm-fixed-price basis, and Attachment J-5 says prices will not change after award.030ADV27R0008.pdf, page 5 |
How to respond
- Email your complete offer to Contracting Officer Brian D. Curl at bcurl@loc.gov, copying Contract Specialist Jacqueline Miller at jacmiller@loc.gov. Do not send it through SAM.gov.
- Use solicitation number 030ADV27R0008 in the email subject line. Keep each email under 20MB, send several emails if needed, and label each one clearly. Do not zip or lock files.
- Build four separate volumes in this order: Technical Approach (20 pages maximum), Corporate Experience (8 pages maximum), Past Performance, and Price in Excel. Each volume needs the solicitation number, your name, contact person, mailing address, phone and UEI.
- Ask three references to email their blind past-performance questionnaires directly to the contracting officer and contract specialist. You must not be copied, and forms received after the deadline will not be accepted.
- Enter a firm-fixed price for every line in Attachment J-1 for all five years. Attachment J-5 says $0.00 for the NRE lines is acceptable. Submit by 5:00 PM Eastern Time on Friday 11/27/2026.
Attached files
From SAM.gov. Download links open the original files.
- Attachment J2 - Past Performance Questionnaire Revised.docx Not read: over our length limit.
- Attachment J5 Questions and Answers.pdfGovernment answers to offeror questions that change requirements, including ISO, ownership and dimensions. Read it before you price. Read.
- Attachment J1 - Price Schedule.xlsxPrice sheet with unit prices for the NRE phase and each year. You must fill in the highlighted cells. Read.
- 030ADV27R0008.pdfMain solicitation (pages 1 to 37 and 43 to 60 were provided). You must complete the offer blocks on the SF 1449 cover and the Section K representations and certifications. Read in part (pages 1–37 and 43–60 of 60).
- Attachment J3 - Breath Switch Requirements.docxTechnical requirements for the enclosure, mouth tube, filter, electronics and software. You must design and price to it; nothing to sign. Read.
- 030ADV27R0008 0001.pdfAmendment 0001, which extends the due date, answers questions and restates Section L. Read it and follow its changes; you must use its submission rules. Read.
110 more files from a ZIP archive, 22 read
- Breathswitch-TDP/BreathSwitch-Electronic/Bill of Materials/Bill of Materials-BreathSwitch(Low Power).xls Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Board Information - BreathSwitch.html Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Board Information - BreathSwitch.txtBoard statistics report from the prior design. Read only. Read.
- Breathswitch-TDP/BreathSwitch-Electronic/BreathSwitch.PDF Not read: over our length limit.
- Breathswitch-TDP/BreathSwitch-Electronic/BreathSwitch.step Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/BreathSwitch.STL Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Design Rule Check - BreathSwitch.drc Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Design Rule Check - BreathSwitch.html Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Generates pick and place files/Pick Place for BreathSwitch(Low Power).txt Not read: over our length limit.
- Breathswitch-TDP/BreathSwitch-Electronic/Gerber Files/BreathSwitch-macro.APR_LIB Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Gerber Files/BreathSwitch.apr Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Gerber Files/BreathSwitch.EXTREP Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Gerber Files/BreathSwitch.GBL Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Gerber Files/BreathSwitch.GBO Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Gerber Files/BreathSwitch.GBP Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Gerber Files/BreathSwitch.GBS Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Gerber Files/BreathSwitch.GD1 Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Gerber Files/BreathSwitch.GG1 Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Gerber Files/BreathSwitch.GKO Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Gerber Files/BreathSwitch.GM1 Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Gerber Files/BreathSwitch.GM13 Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Gerber Files/BreathSwitch.GM14 Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Gerber Files/BreathSwitch.GP1 Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Gerber Files/BreathSwitch.GP2 Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Gerber Files/BreathSwitch.GPB Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Gerber Files/BreathSwitch.GPT Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Gerber Files/BreathSwitch.GTL Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Gerber Files/BreathSwitch.GTO Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Gerber Files/BreathSwitch.GTP Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Gerber Files/BreathSwitch.GTS Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Gerber Files/BreathSwitch.REP Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/Gerber Files/BreathSwitch.RUL Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/NC Drill Files/BreathSwitch-RoundHoles.TXT Read.
- Breathswitch-TDP/BreathSwitch-Electronic/NC Drill Files/BreathSwitch-SlotHoles.TXT Read.
- Breathswitch-TDP/BreathSwitch-Electronic/NC Drill Files/BreathSwitch.DRR Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/NC Drill Files/BreathSwitch.LDP Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/BreathSwitch.REP Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/BreathSwitch.zip Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/breathswitch_netlist.rep Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/fonts/standard Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/matrix/matrix Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/misc/attrlist Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/attrlist Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/eda/data Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/bottom/attrlist Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/bottom/features Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/bottomoverlay/attrlist Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/bottomoverlay/features Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/bottompaste/attrlist Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/bottompaste/features Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/bottomsolder/attrlist Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/bottomsolder/features Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/comp_ _bot/components Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/comp_ _bot/features Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/comp_ _top/components Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/comp_ _top/features Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/drill/attrlist Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/drill/features Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/drill/tools Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/keepout/attrlist Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/keepout/features Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/mechanical1/attrlist Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/mechanical1/features Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/mechanical13/attrlist Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/mechanical13/features Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/mechanical14/attrlist Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/mechanical14/features Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/mechanical15/attrlist Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/mechanical15/features Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/plane1/attrlist Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/plane1/features Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/plane2/attrlist Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/plane2/features Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/top/attrlist Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/top/features Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/topoverlay/attrlist Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/topoverlay/features Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/toppaste/attrlist Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/toppaste/features Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/topsolder/attrlist Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/layers/topsolder/features Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/netlists/cadnet/netlist Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/profile Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/steps/pcb/stephdr Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/symbols/rect62.9921x157.4803_60/features Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/ODB Files/odb/symbols/rect70.9921x165.4803_60/features Could not be read.
- Breathswitch-TDP/BreathSwitch-Electronic/README.txtShort notes on the prior circuit board. Read only. Read.
- Breathswitch-TDP/BreathSwitch-Electronic/Status Report.Txt Read.
- Breathswitch-TDP/BreathSwitch-Mechanical/PDF Files/6-foot Tube assembly/A-0914-201-522 6 FOOT TUBE ASM REV03.PDF Read.
- Breathswitch-TDP/BreathSwitch-Mechanical/PDF Files/6-foot Tube assembly/MTLL013 MALE LUER.pdf Read.
- Breathswitch-TDP/BreathSwitch-Mechanical/PDF Files/6-foot Tube assembly/P-0914-201-504 LUER, MALE REV03.PDF Read.
- Breathswitch-TDP/BreathSwitch-Mechanical/PDF Files/6-foot Tube assembly/P-0914-201-522 TUBE, 6 FOOT REV03.PDF Older version, not read.
- Breathswitch-TDP/BreathSwitch-Mechanical/PDF Files/A-0914-201-900 TOP ASM REV03.PDFTop-level assembly drawing of the prior breath switch parts. Read only. Read.
- Breathswitch-TDP/BreathSwitch-Mechanical/PDF Files/Clip Assembly/A-0914-201-200 CLIP ASM REV03.PDF Read.
- Breathswitch-TDP/BreathSwitch-Mechanical/PDF Files/Clip Assembly/P-0914-201-216 CLIP REV12.PDF Read.
- Breathswitch-TDP/BreathSwitch-Mechanical/PDF Files/Clip Assembly/P-0914-201-601 BULLDOG CLIP REV03.PDF Read.
- Breathswitch-TDP/BreathSwitch-Mechanical/PDF Files/Clip Assembly/P-0914-201-625 MUSHROOM DISK REV03.PDF Read.
- Breathswitch-TDP/BreathSwitch-Mechanical/PDF Files/MouthPiece/0914-201-AC-0310 MOUTHPIECE REV01.PDF Read.
- Breathswitch-TDP/BreathSwitch-Mechanical/PDF Files/Switch Assembly/92525A118 2-32 0375 SCREW.PDF Read.
- Breathswitch-TDP/BreathSwitch-Mechanical/PDF Files/Switch Assembly/A-0914-202-100 SWITCH ASM REV03.PDF Read.
- Breathswitch-TDP/BreathSwitch-Mechanical/PDF Files/Switch Assembly/P-0914-201-PLP2-350 LIGHT PIPE REV03.PDF Read.
- Breathswitch-TDP/BreathSwitch-Mechanical/PDF Files/Switch Assembly/P-0914-202-010 CASE REV12.PDFDrawing of the prior housing case with material and tolerance notes. Read to plan the molded parts. Read.
- Breathswitch-TDP/BreathSwitch-Mechanical/PDF Files/Switch Assembly/P-0914-202-020 COVER REV12.PDF Read.
- Breathswitch-TDP/BreathSwitch-Mechanical/PDF Files/Switch Assembly/Tube Assembly/A-0914-201-520 4 INCH TUBE ASM REV03.PDF Read.
- Breathswitch-TDP/BreathSwitch-Mechanical/PDF Files/Switch Assembly/Tube Assembly/FTLL007 FEMALE LUER.pdf Read.
- Breathswitch-TDP/BreathSwitch-Mechanical/PDF Files/Switch Assembly/Tube Assembly/P-0914-201-502 LUER, FEMALE REV03.PDF Read.
- Breathswitch-TDP/BreathSwitch-Mechanical/PDF Files/Switch Assembly/Tube Assembly/P-0914-201-520 TUBE, 4 INCH REV03.PDF Older version, not read.
- Breathswitch-TDP/BreathSwitch-Mechanical/STEP Files/0914-201-216 CLIP REV12.STEP Could not be read.
- Breathswitch-TDP/BreathSwitch-Mechanical/STEP Files/0914-202-010 CASE REV12.STEP Could not be read.
- Breathswitch-TDP/BreathSwitch-Mechanical/STEP Files/0914-202-020 COVER REV12.STEP Could not be read.
Download the archive from SAM.gov.
Not stated in what we read
- Whether a set-aside applies and what size standard, if any, applies. The SAM record says not stated.
- Pages 38 to 42 of the solicitation (the start of Section K) were not provided to us. You must read them on SAM.gov.
- Attachment J-4, the prior technical data package, is named in the solicitation but is not in our attachment list. We could not review it.
- The revised past-performance questionnaire (Attachment J-2) was left out for length and we could not review it. The references will use it, so read it on SAM.gov.
- The Government's price estimate used to compare offers is not stated.
- The unlabeled quantity of 25 in the NRE section of Attachment J-1 is not explained.
Notice text
This is a combined synopsis/solicitation in accordance with FAR Part 13. This is a simplified acquisition to establish a contract for a breath switch. This breath switch will be used to control the Digital Talking Book Machine (DTBM) DS-1 (Digital Standard version 1), DA-1 (Digital Advanced player version 1), and DA-2 (Digital Advanced player version 2) allowing for control of the device using pulses of air. The contractor shall develop both a breath switch and a Technical Data Package upon which this device is based.
The breath switch shall consist of a micro controller and associated circuitry, a USB-A connector, housing, and a mouth tube. A full description of breath switch requirements is contained in Attachment J-3. The breath switch’s tubing shall be food safe (i.e., silicone). The contractor shall develop any required tooling, production/test equipment, and procedures required to manufacture the breath switch. This work shall comprise two phases: (1) a non-recurring engineering (NRE) phase and (2) a full-production phase.
This is intended to be a single-award 5-year IDIQ above the simplified acquisition threshold. Please see the attached solicitation and associated attachments for more details. Amendment 030ADV27R0008 -0001 answers Offeror questions and extends the due date. Please see attached amendment 030ADV27R0008 -0001, revised Attachment J-2, and new Attachment J-5 for more details.
As published on SAM.gov.
Contacts
- Brian D. Curl, bcurl@loc.gov
- Jacqueline Miller, jacmiller@loc.gov
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 19, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Nov 27, 5:00 PM ET2 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 334419, other electronic component manufacturing, soonest deadline first.
- Defense Logistics AgencyVirginia-class submarine cable assemblies, Richmond, VA
- Defense Logistics AgencyC-130 electrical cord assemblies, Richmond, VA
- Defense Logistics Agency3 wiring harnesses for an air defense unit
- Defense Logistics AgencySpecial cable assemblies for DLA Distribution
- Defense Logistics Agency58 special cable assemblies for Industries of the Blind
- Department of the NavyRepair of 3 data transfer units for Kuwait FMS
- Defense Logistics AgencyRadio frequency branch cable assembly, Richmond, VA
- Drug Enforcement AdministrationTracking Devices and Cellular Service
Free · at most one email a morning
Get new notices from Library of Congress by email
Each morning we'll send the new solicitations and sources-sought notices from Library of Congress, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy