Abatement, windows and coatings at Argonne, Lemont, IL
Argonne National Laboratory in Lemont, Illinois, wants a contractor on a time-and-materials agreement for industrial services: asbestos and lead abatement, scaffolding, floor tile and window glazing removal, window replacement, insulation, and surface coatings.
Official title: On-Site Industrial Services
- Deadline
- Dec 7, 10:00 AM CT
- 12 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Lemont, IL
- Buyer: Argonne Natl Lab - DOE Contractor
What they're buying
Work is ordered as needed over one base year and two option years, and no minimum volume is guaranteed.
Top catches
“the highest technical acceptable proposal with the lowest evaluated proposed cost” Enclosure No 5 - Evaluation Criteria - 7-B187-Q-00016-00.pdf, page 1
The notice says business proposals are pass/fail and technical acceptability uses an adjectival scale. Enclosure 5 describes neither, and it makes cost a significant factor in the best value trade-off. Price competitively and ask ANL in writing which rule applies.
“Please reference the RFP number 7-B187-P-00016-00 in the subject line.” Enclosure No 1 - Request for Proposal - 7-B187-Q-00016-00.pdf, page 6
Offers go by email only to jmangis@anl.gov, due Monday, December 7 at 10:00 AM CST, with the RFP number in the subject line. Late offers are not considered unless ANL decides it is in its best interest, so send early and keep proof of sending.
Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 7 of 9 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Asbestos, lead and mold abatement with containment, removal and clearance testing
- Scaffolding design, erection and dismantling to OSHA and industry standards
- Floor tile removal, including asbestos tile, with a stated limit of 160 square feet of asbestos tile and mastic
- Window replacement and removal of window glazing, including asbestos glazing
- Insulation removal, repair and installation on piping, ductwork, vessels, tanks and equipment
- Surface preparation and coatings on piping, vessels, tanks, structural steel, floors and concrete
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Evaluation rules conflict. The notice says business proposals are pass/fail and technical acceptability uses an adjectival scale. Enclosure 5 describes neither, and it makes cost a significant factor in the best value trade-off. Price competitively and ask ANL in writing which rule applies.
- Email-only submission, strict subject line. Offers go by email only to jmangis@anl.gov, due Monday, December 7 at 10:00 AM CST, with the RFP number in the subject line. Late offers are not considered unless ANL decides it is in its best interest, so send early and keep proof of sending.
- Shop must be within 25 miles. The statement of work requires a primary shop within 25 miles of Argonne, and the criteria favor firms that self-perform without subcontractors. If you have no shop in that range, you likely cannot meet the requirement, so confirm before you bid.“The Contractor shall maintain a primary shop facility within 25 miles of Argonne” Enclosure No 3 - Statement of Work - 7-B187-Q-00016-00.pdf, page 2
- High-risk site rules before work starts. No on-site work may begin until ANL issues a written notice to proceed. The corporate safety plan is due 10 calendar days after award, and the job safety analysis must be reviewed before the pre-job meeting, so plan staff and cost this paperwork now.“receives a written notice to proceed issued by the Procurement Representative.” Enclosure No 4 - ANL-366H (on-site high risk)-23-OCT-2026 - 7-B187-P-00016-00.pdf, page 1
- Insurance minimums to confirm. Coverage must include $2,000,000 general liability per occurrence, $1,000,000 auto, and $1,000,000 workers compensation and employers liability, from a carrier rated A or better by A.M. Best. Subcontractors need the same, so check your policies before you bid.“The contractor and each of their subcontractors shall have and maintain” Enclosure No 4 - ANL-366H (on-site high risk)-23-OCT-2026 - 7-B187-P-00016-00.pdf, page 1
- Base year start date conflicts. The price schedule starts the base year on February 1, 2027, but the statement of work starts the period at award. Ask ANL which date governs, because the answer changes how you price the first year.“Base Year: February 1, 2027, through January 31, 2028” Enclosure No 8 - Price Schedule - 7-B187-Q-00016-00.pdf, page 1
Key terms
| Who can bid | Not stated (no set-aside listed)Your firm needs a primary shop within 25 miles of Argonne. Site access requires U.S. citizens for vendor representatives.SAM.gov record |
|---|---|
| Contract period | One base year plus two option yearsBase year dates in the price schedule start February 1, 2027, which conflicts with the start at award in the SOW. No minimum volume is guaranteed.Enclosure No 3 - Statement of Work - 7-B187-Q-00016-00.pdf, page 6 |
| How they choose | Best value, with the technical proposal weighted mostThe notice says business proposals are pass/fail. See catches.Notice text |
| How to submit | Email to Jazlyn Mangis at jmangis@anl.gov, in three separate partsPart I technical, Part II business/management, Part III cost on Enclosure No. 8.Enclosure No 1 - Request for Proposal - 7-B187-Q-00016-00.pdf, page 1 |
| Questions due | Friday, November 27, 2026, 3:00 PM CSTSend questions in writing by email to jmangis@anl.gov. Answers go to all offerors.Notice text |
| Contract type | Time-and-materials blanket purchasing agreementWork is authorized only by a written call record or service request release number.Enclosure No 3 - Statement of Work - 7-B187-Q-00016-00.pdf, page 1 |
How to respond
- Complete, sign and date the ANL-70B Representations and Certifications (Enclosure No. 6). ANL says no award will be issued without a properly executed copy.
- Complete the Price Schedule (Enclosure No. 8) with hourly rates, overtime and Sunday/holiday rates, and materials markups. Keep prices out of the technical proposal.
- Put the solicitation number, your legal name, address, email, phone, and the name, title and signature of your authorized signer on page 1 of each proposal document.
- Email all three parts to Jazlyn Mangis at jmangis@anl.gov by 10:00 AM CST on Monday, December 7, 2026, with 7-B187-P-00016-00 in the subject line. File size limits: Not stated.
- Send any questions in writing to jmangis@anl.gov by 3:00 PM CST on Friday, November 27, 2026, and reply by email to acknowledge receipt of the RFP.
Attached files
From SAM.gov. Download links open the original files.
- Enclosure No 6 - ANL-70B Reps and Certs Long-29-SEP-2026 - 7-B187-P-00016-00.pdfLong-form representations and certifications; you must complete, sign, date and return it with your proposal. Read.
- Enclosure No 2 - Appendix A-Labor Hour-12-OCT-2026 - 7-B187-P-00016-00.pdfArgonne terms for labor-hour and time-and-materials contracts, including payment, insurance-related and site rules; you must review and accept these terms. Read.
- Enclosure No 7 - SCA WD 2015-5017 Rev 34 - 7-B187-P-00016-00.pdf Not read: over our length limit.
- Enclosure No 4 - ANL-366H (on-site high risk)-23-OCT-2026 - 7-B187-P-00016-00.pdfHigh-risk on-site supplemental conditions covering insurance, safety and site entry; you must review and accept them. I could not review pages 11 to 16, so you must read those on SAM.gov. Read in part (pages 1–10 and 17–23 of 23).
- Enclosure No 1 - Request for Proposal - 7-B187-Q-00016-00.pdfThe RFP cover letter, submission instructions and notices to offerors; read it, since it sets how and when to submit, and it has no form to fill in. Read.
- Enclosure No 5 - Evaluation Criteria - 7-B187-Q-00016-00.pdfHow proposals are judged, with three technical criteria; read it and organize your technical proposal in the same order. Read.
- Enclosure No 8 - Price Schedule - 7-B187-Q-00016-00.pdfThe price form for hourly labor rates and materials markups for three years; you must complete, sign and return it. Read.
- Enclosure No 9 - SCA Wage Flyer 2009 - 7-B187-Q-00016-00.pdf Not read: over our length limit.
- Enclosure No 3 - Statement of Work - 7-B187-Q-00016-00.pdfThe statement of work listing the services, safety rules, deliverables and proposal requirements; read it fully and price to it. Read.
Not stated in what we read
- Estimated value or budget for the agreement is not stated.
- Whether ANL will exercise the two option years, and whether any minimum order applies. The text says no minimum volume is guaranteed.
- Warranty length. The statement of work requires a warranty on materials and workmanship but gives no term.
- Enclosures 7 and 9 (Service Contract Act wage documents) were not included. I could not review them, so you must read them on SAM.gov before pricing labor.
- Current contractor, past work volume, and any page or file size limits for proposals are not stated.
Notice text
Argonne National Laboratory (ANL) seeks a Contractor for On-Site Industrial Services. Services include abatement, scaffolding, floor tile removal, window replacement, glazing removal, insulation, and surface preparation and coatings. Award will be made on a BEST VALUE basis. Technical acceptability will be evaluated on AN ADJECTIVAL SCALE. BUSINESS PROPOSALS WILL BE EVALUATED ON PASS/FAIL. Among responsible offerors determined technically acceptable and compliant with solicitation requirements, ANL will award to the offeror with the best overall value, where the Technical Proposal is of greater importance to the Price Proposal and Business Management Proposal.
Proposals are due by 10:00 AM CST on December 7, 2026. *All inquiries or questions must be submitted in writing prior to 3:00 PM CST on November 27, 2026. Offerors shall submit: Completed proposal that meets the requirements stated in the Request for Proposal Document (Technical Proposal, Business/Management Proposal, and Price Proposal) Completed and signed ANL-70B Representations and Certifications. Any proposed exceptions or deviations. All proposal documentation requested under Best Value Evaluation Criteria (Enclosure 5) Offers that do not meet mandatory requirements or do not provide adequate supporting documentation may be found technically unacceptable.
As published on SAM.gov.
Contacts
- Jazlyn Mangis, jmangis@anl.gov
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 17, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 7, 10:00 AM CT12 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 238990, all other specialty trade contractors, soonest deadline first.
- Department of Veterans AffairsReplace condensate pump at Sepulveda CBOC, North Hills, CA
- Department of the Air ForceOpacity meter inspections at Hanscom AFB, MA
- Department of the Air ForceGATR grounding work, Tyndall AFB (market research)
- Department of the NavyZebra mussel removal and intake repair, Great Lakes, IL
- Department of Veterans AffairsNotice of Intent to Sole Source Perimeter Fence Line and Gates Replacement & Expansion Hines VA Medical Center in Illinois.
- Defense Logistics AgencyDoor repair at Defense Supply Center Richmond, VA
- Department of Veterans AffairsAutomatic door repair at Bedford VA campus, Bedford, MA
- Bureau of Engraving and PrintingEntry plaza renovation and sun sails, Fort Worth, TX
Free · at most one email a morning
Get new notices from Department of Energy by email
Each morning we'll send the new solicitations and sources-sought notices from Department of Energy, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy