Run and maintain South Bay wastewater plant, San Diego, CA
The U.S. Section of the International Boundary and Water Commission wants a contractor to operate and maintain the South Bay wastewater treatment plant and its canyon collectors and pump stations in San Diego, California.
Official title: Operations and Maintenance (O&M) Services for the SBIWTP
- Deadline
- Jan 6, 2027, 2:00 PM MT
- 41 days left
- Last time
- $88M
- Likely Veolia Water West Operating Services Inc
- Place
- San Ysidro, CA
- Buyer: Internat. Boundary and Water Comm.
What they're buying
It is a firm-fixed-price contract with a base year and four option years, and proposals are due January 6, 2027 by SharePoint upload, subject to any amendment.
Top catches
“All proposals must be uploaded by Monday, January 6th, 2027, at” 191BWC26R0009 0004.pdf, page 6
The notice calls the deadline Monday, January 6, 2027, but that date is a Wednesday. Amendment 0004 also says the date may be extended to a date not yet filled in. Confirm the exact date and time with the contracting officer in writing before you plan your upload.
“All access requests must be submitted no later than 1/4/2027 at 12:00 PM MDT.” 191BWC26R0009 0004.pdf, page 6
You cannot upload a proposal until SharePoint access is set up. Send your access request by email to the contracting officer before January 4, 2027 at 12:00 PM MDT. Only two access requests per vendor are honored, and late uploads are refused.
Read by AI (Claude Haiku) on Nov 26, 2026 from the notice and 18 of 47 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Run the plant for the 25 MGD base flow (CLIN 1) and the added 10 MGD (CLIN 2), including NPDES permit monitoring and reporting.
- Operate and maintain five canyon collectors, two pump stations, two junction boxes and the South Bay Land Outfall. The ocean outfall drop shaft, tunnel and riser are excluded.
- Clean canyon collectors and return them to service within 96 hours after a storm of 0.1 inch or more from November through March.
- Maintain the temporary 10 MGD equipment: two rotary drum thickener packages, a trailer-mounted screw press, and chemically enhanced primary treatment systems.
- Repair equipment under $200,000 per asset without deferring it to avoid the threshold.
- Provide a dedicated safety officer (SSHO) on 40-hour weeks with on-call cover, and a bilingual employee on each shift. Submit a transition plan within 15 days of award.
Who did it before
$88M
on the contract that likely holds this work now: Veolia Water West Operating Services Inc. It ended Mar 31, 2026.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Deadline day and date conflict. The notice calls the deadline Monday, January 6, 2027, but that date is a Wednesday. Amendment 0004 also says the date may be extended to a date not yet filled in. Confirm the exact date and time with the contracting officer in writing before you plan your upload.
- SharePoint access must come first. You cannot upload a proposal until SharePoint access is set up. Send your access request by email to the contracting officer before January 4, 2027 at 12:00 PM MDT. Only two access requests per vendor are honored, and late uploads are refused.
- Page limit is 40 or 60 pages. The amendment text limits the technical volume to 40 single-sided pages. A Q&A answer says the limit was raised to 60. Ask the contracting officer which limit applies, and plan to stay within 40 pages until you have a written answer.“The Technical Proposal shall not exceed 20 double-sided 8.5 inch x 11 inch pages in length (40 single-sided)” 191BWC26R0009-0003.pdf, page 6
- Five references and questionnaires required. Factor 3 and Factor 7 need at least five relevant U.S. contracts and five past performance questionnaires from comparable plants. Missing questionnaires are rated negatively. Send your client letter and questionnaire requests now and keep proof that they were sent.“Failure to provide past performance questionnaires shall be rated in a negative manner.” 191BWC26R0009 0004.pdf, page 28
- Option-year escalation conflicts. Amendment 0004 adds economic price adjustment terms, but a Q&A answer says option years will not be adjusted. The amendment controls over Q&A answers, so read Section H.15 before you set option-year prices.“Incorporate the Economic Price Adjustment requirements stated in Section H.15 and the corresponding clause in Section I.” 191BWC26R0009 0004.pdf, page 2
- Davis-Bacon may apply to repairs. A Q&A answer says Davis-Bacon applies to corrective maintenance, repairs and replacement when construction trades are involved. Price trade labor on repairs at the applicable wage rates. Amendment 0004 replaced the Attachment 21 wage determination, so confirm which determination applies.“Davis-Bacon applies to all corrective maintenance, repairs and replacement, when construction trades are involved.” Offeror Questions_thru20261119.pdf, page 26
Key terms
| Who can bid | Open to all businesses; no set-asideBusinesses that are not small must include a small business subcontracting plan with their proposal.SAM.gov record |
|---|---|
| Contract period | Base year plus 4 option years (5 years, projected)A 60-day phase-in follows award. The actual start date is not stated in the text we reviewed.Attch. 01 PWS SBIWTP O&M Services 20261125.pdf, page 7 |
| How they choose | Technical ranking first; price checked only for fair and reasonableThe highest-rated offeror's price is checked for fairness. Price does not decide between offerors.191BWC26R0009 0004.pdf, page 26 |
| How to submit | Upload through USIBWC's secure SharePoint portal onlyEmail, fax, mail and hand delivery are not accepted. You must request SharePoint access first, by January 4, 2027 at 12:00 PM MDT.191BWC26R0009 0004.pdf, page 6 |
| Questions due | November 19, 2026, 1:00 PM PST (2:00 PM MST); closedAmendment 0004 contains the government answers to questions received by this date.191BWC26R0009 0004.pdf, page 4 |
| Contract type | Firm-fixed-price, performance-based, with extra work priced as Over and Above (O&A) ordersZero-flow and excess-flow responses are treated as O&A work, which is not in the fixed price.Offeror Questions_thru20261119.pdf, page 5 |
| Site visit | Wednesday, October 14, 2026, 9:00 AM PST (10:00 AM MST); already passedNames of attendees were due October 7, 2026. Offerors who miss the visit are not offered another one.191BWC26R0009 0004.pdf, page 4 |
How to respond
- Email the contracting officer, Philip Johnson, at Philip.johnson@ibwc.gov before January 4, 2027 at 12:00 PM MDT. Use the subject line Request for SharePoint Access – Solicitation 191BWC26R0009 and include your company name, authorized representative, uploader email and phone number.
- In the same request, sign the nondisclosure agreement (NDA) and ask for access to the CUI documents, which Amendment 0004 says will be placed in your secure SharePoint folder.
- Price every CLIN, including CLIN 011 for the 60-day phase-in, using the revised Attachment 33 price workbook dated November 2026.
- Build Volume I (technical, no price) in the order of the Section M factors, within the page limit. Build Volume II (pricing and business) separately. Name each file [OfferorName]_Vol_[I/II]_[ProposalType].pdf.
- Upload both volumes to your SharePoint folder by the deadline. Late uploads are not accepted and expired links are not reactivated. Confirm the date in writing first, because the notice gives a weekday that does not match the date.
Attached files
From SAM.gov. Download links open the original files.
- Attch. 16 Plans Drawings Request Instructions.docxA memo saying plant and pump station plans and drawings are sent only on request by email to the contracting officer. Read only. Read.
- Attch. 01A SOM SUBMITTAL REGISTER SBIWTP O&M 2026.xlsxA list of plans and reports the contractor must submit, such as the phase-in plan and monthly reports. Read it to plan staffing and reporting. You do not fill it in. Read.
- 191BWC26R0009 0001.pdfAmendment 0001, which updated attachment references and added clauses. Later amendments control where they conflict. Read only. Read.
- Attch. 25 Client Authorization Letter.docxA template letter you fill in with your company and contract details, sign, and send to past clients so USIBWC can contact them. Read.
- 191BWC26R0009 OM SBIWTP Services.pdf Not read: over our length limit.
- Attch. 18 NIST.FIPS.199.pdf Not read: over our length limit.
- Attch. 11 Canyon Collector Daily Inspection template- MAR 2025.xlsx Not read: over our length limit.
- Attch. 23 LAB SAMPLING QTY.xlsx Not read: over our length limit.
- Attch. 04.a. GiantKelpVariance_09.11.26.pdf Not read: over our length limit.
- Attch. 28 Temporary_Dewatering_Narrative.pdfDescribes the temporary screw press used for sludge dewatering during construction and when it is removed. Read only. Read.
- Offeror Questions_thru20261119.pdfGovernment answers to offeror questions received through November 19, 2026, covering staffing, repairs, wage rates and payment. We reviewed only parts. Read only, since answers can change the solicitation. Read in part (pages 1–6 and 26–29 of 29).
- Attch. 21 Wage Determinations CA20240001 07.26.2024.pdf Not read: over our length limit.
- Attch. 04 Order No. R9-2021-0001 as amended R9-2026-0005.pdf Not read: over our length limit.
- Attch. 22 MX- Norma004_Semarnat_2002_english version.pdf Not read: over our length limit.
- Attch. 05 List-of-Permits.pdfA list of the plant's permits with starting fee amounts that the operator must keep current. Read only. Read.
- Attch. 24 OEP-SBIWTP(2026).pdf Not read: over our length limit.
- Attch. 06 IBWC SBIWTP Asset Registry 2024.xlsx Not read: over our length limit.
- Attch. 05 List-of-Permits.docx Older version, not read.
- Attah. 01 PWS SBIWTP O&M Services.pdf Older version, not read.
- Attch. 12 2025 NPDES ANNUAL BIOSOLIDS REPORT.pdf Not read: over our length limit.
- Attch. 09 SBIWTP Capital Project List as of September 2026.pdfA list of recent and ongoing capital repair projects with costs and status. Read only. Read.
- Attch. 02 FY26 SBIWTP O&M QASP.docx Older version, not read.
- Attch. 30.b. FSP ANNEX D MONTHLY SBIWTP (2026).pdfA monthly facility security inspection checklist. It is likely the contractor completes this form, so read it to understand the duty. Read.
- Attch. 34 SBIWTP O&M Site Visit oct14_26.pdf Scanned image, not read.
- Attch. 15 NIST.SP.800-171r3.pdf Not read: over our length limit.
- Attch. 07 FY26 IBWC Condition Assessment Report.pdf Not read: over our length limit.
- Attch. 26 Past Performance Questionnaire.pdfA questionnaire your past clients fill in and send to USIBWC. You do not complete it yourself. Read.
- Attch. 30.a. FSP ANNEX A SBIWTP (2026).pdfA bomb threat call checklist for plant staff. Read only. Read.
- Attch. 10 Monthly Chemical Dosage 2025 to 2026.pdf Scanned image, not read.
- Attch. 33 O&M Services Price Workbook (blank template)_updatedNov2026.xlsx Not read: over our length limit.
- Attch. 33 O&M Services Price Workbook (blank template).xls Could not be read.
- Attch. 02 FY26 SBIWTP O&M QASP.pdf Not read: over our length limit.
- Attch. 09 SBIWTP Capital Project List as of September 2025.pdfAn older version of the capital project list from September 2025. Use the 2026 list for current status. Read only. Read.
- Attch. 20 SOUTH BAY SPILL PREVENTION AND RESPONSE PLAN October 2024.pdf Not read: over our length limit.
- 191BWC26R0009 0004.pdfAmendment 0004, the latest amendment, which changes deadlines, pricing, wage rates and submission rules. You must acknowledge receipt. We reviewed only parts, so read the full amendment. Read in part (pages 1–7 and 26–30 of 30).
- Attch. 01 PWS SBIWTP O&M Services 20261125.pdfThe performance work statement dated November 25, 2026, which sets out the duties to price. We reviewed only parts. Read it in full. Read in part (pages 1–7 and 35–40 of 40).
- Attch. 21 Wage Determination CA2015-5635 Rev32 20260908.pdf Not read: over our length limit.
- Attch. 17 SBIWTP Map.pdf Scanned image, not read.
- Attch. 29 Screw Press Map and Drawings.pdf Not read: over our length limit.
- FY27 SBIWTP OM PWS REV 1 10.19.26.pdfAn earlier revision of the performance work statement dated October 19, 2026. The November 25 version is the current one. Read only. Read in part (pages 1–7 and 35–40 of 40).
- 191BWC26R0009 0002.pdfAmendment 0002, which adds government answers to offeror questions. Our copy of the answer text is garbled, so check the original. Read only. Read.
- Attch. 19 SOO_V2_06192018.pdfThe plant sequence of operations for start-up, shutdown and power-outage reset. We reviewed only parts. Read it to understand daily operating duties. Read in part (pages 1–8 and 62–70 of 70).
- Attch. 08 IBWC SBIWTP - Asset Maintenance Schedule.xlsx Not read: over our length limit.
- Attch. 27 SD.I.10031-M-2 Background Investigation Procedures for SBIWTP Contractor Personnel.pdf Not read: over our length limit.
- 191BWC26R0009-0003.pdfAmendment 0003, which revises Sections L and M and adds Q&A answers. You must acknowledge receipt as the amendment instructs. We reviewed only parts. Read in part (pages 1–6 and 28–32 of 32).
- Attch. 30.c. FSP ANNEX D ANNUAL SBIWTP(2026).pdf Not read: over our length limit.
- Attch. 32 0131 20260720 PCL Construction Security Plan.pdf Not read: over our length limit.
Not stated in what we read
- Estimated contract value and amounts in the price workbook. The workbook was not readable in the text we reviewed.
- Award date and actual start date. Q&A 99 asks about a June 1, 2027 CLIN start and a bridge to March 31, 2027, but the answer refers to a document we could not review.
- Name of the incumbent contractor and whether its contract will be extended.
- The current Section L page limit and Section H.15 price adjustment terms. Pages 8 to 25 of Amendment 0004 and pages 7 to 27 of Amendment 0003 were not provided.
- Contents of the CUI files, including the O&M Manual, System Security Plan, Facility Security Plan and Border Crossing SOP. You need SharePoint access and an NDA to read them.
- Which wage rates apply to repair trades. Q&A 98 points to Response 62, which is not in the text we reviewed.
Notice text
Amendment 0004 provides the Government’s responses to offeror questions; replaces Sections L and M; revises proposal submission, pricing, and evaluation requirements; adds CLIN 011 for the 60-day Phase-In period; updates the wage determination and price workbook; incorporates economic price adjustment and subcontracting-plan requirements; removes the nondisplacement and incumbent right-of-first-refusal requirements; and notifies offerors that CUI documents will be made available in each offeror’s designated secure SharePoint folder.
Ammendment 0003 Revized Q&A, Rev section L&M Ammendment 0002 Q&A Amendment 0001 Operations and Maintance Services for the Southbay Wastewater Treatment Plant The purpose of this amendment 0001update attachment in section J.01 of the solicitation. Update attachment references in the PWS. Add clause 52.215-10, 52.215-12, 52.215-15, 52.215-16, and 52.215-20 Alt III. Removed 52.215-14. Note to access CUI documents, request sharePoint access and sign NDA.
As published on SAM.gov.
Contacts
- Philip Johnson, philip.johnson@ibwc.gov, 9152559324
- Seone Michael Jones, seone.jones@ibwc.gov, 9158324120
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at International Boundary and Water Commission: U.S.-Mexico for the same kind of work (NAICS 221320, service code M1ND) in California that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Operation and Maintenance of the South Bay Wastewater Treatment Plant.Veolia Water West Operating Services Inc · 191BWC20C0003 | $87,960,473 | Mar 31, 2026ended | CA |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 26, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Jan 6, 2027, 2:00 PM MT41 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 221320, sewage treatment facilities, soonest deadline first.
Free · at most one email a morning
Get new notices from International Boundary and Water Commission: US-Mexico by email
Each morning we'll send the new solicitations and sources-sought notices from International Boundary and Water Commission: US-Mexico, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy