1. Opportunities
  2. International Boundary and Water Commission: US-Mexico
  3. 191BWC26R0009

Open · 48 days left

O&M of South Bay wastewater plant, San Ysidro, CA

The U.S. Section of the International Boundary and Water Commission (USIBWC) wants a contractor to operate and maintain the South Bay wastewater treatment plant, its canyon collectors and its pump stations in San Ysidro, CA.

Official title: Operations and Maintenance (O&M) Services for the SBIWTP

Due Jan 6, 2027, 2:00 PM MT · San Ysidro, CA

What they're buying

The contract is firm-fixed-price for a projected five years (base year plus four option years), with 24/7 staffing and all chemicals paid by the contractor.

Top catches

Questions close today
“PM PST (2:00 PM MST) on November 19th, 2026.” 191BWC26R0009-0003.pdf, page 2

Written questions are due today, November 19, 2026, at 1:00 PM PST. Email the CO now if you need an answer before you price.

Deadline day name conflicts
“All proposals must be uploaded by Monday, January 6th, 2027, at 2:00 PM MST.” 191BWC26R0009-0003.pdf, page 4

The notice calls January 6, 2027 a Monday, but it is a Wednesday. The deadline is 2:00 PM Mountain time, which is 1:00 PM on a San Diego clock, so ask the CO to confirm the date.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 15 of 40 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Staff the plant 24 hours a day, 7 days a week, including federal holidays, with at least one bilingual English and Spanish operator on site at all times.
  • Operate and maintain the five canyon collectors, the Hollister Street and Goat Canyon pump stations, Junction Boxes 1 and 2, and the pipes between them and the plant, with daily canyon collector inspections.
  • Treat an average of 35 MGD through primary treatment (chemically enhanced with ferric chloride and anionic polymer), send 25 MGD on to secondary treatment, and bypass up to 10 MGD.
  • Supply and pay for all process chemicals and all sampling and testing under the NPDES monitoring program, with no added compensation.
  • Coordinate loading of sludge and grit trucks driven by Mexican operators, who handle those trucks at no cost to you, and coordinate inflow with Mexican pumping station operators.
  • Maintain assets to manufacturer instructions in a nonproprietary asset system, keep the asset inventory current, and submit monthly O&M reports and the other items in the submittal register.

Who did it before

$88M

on the contract that likely holds this work now: Veolia Water West Operating Services Inc. It ended Mar 31, 2026.

Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.

What to watch for

  • Questions close today. Written questions are due today, November 19, 2026, at 1:00 PM PST. Email the CO now if you need an answer before you price.
  • Deadline day name conflicts. The notice calls January 6, 2027 a Monday, but it is a Wednesday. The deadline is 2:00 PM Mountain time, which is 1:00 PM on a San Diego clock, so ask the CO to confirm the date.
  • SharePoint access comes first. Proposals go only through the SharePoint portal, and access requests are due by email by January 4, 2027, at 12:00 PM MDT. Email, fax and mail are not accepted, and only two access requests per vendor are honored.“All access requests must be submitted no later than 1/4/2027 at 12:00 PM MDT.” 191BWC26R0009-0003.pdf, page 4
  • Past performance can sink the bid. You need five relevant U.S. contracts and five past performance questionnaires; outside-U.S. projects do not count toward the minimum. Keep proof that you sent each questionnaire request, because a missing questionnaire is rated negatively.“Failure to provide past performance questionnaires shall be rated in a negative manner.” 191BWC26R0009-0003.pdf, page 26
  • Chemical bids use an unread table. You must price chemicals at the highest monthly dosage in Attachment 10, and you pay all chemical and sampling costs with no added compensation. Attachment 10 has no readable text in this review, so read it on SAM.gov before you price.“Offerors shall bid this solicitation based on the highest monthly chemical dosage identified in Attachment 10” FY27 SBIWTP OM PWS REV 1 10.19.26.pdf, page 9
  • Price must use Government workbook. Your price must follow the Government's O&M Services Price Workbook, and a deviation may make your price nonresponsive. The workbook could not be read in this review, so download it from SAM.gov and check its structure before you build your price.“Any deviation from the required structure or instructions may render the price proposal nonresponsive.” 191BWC26R0009-0003.pdf, page 7

Key terms

Who can bidOpen to all businesses (no set-aside)Other-than-small firms must submit a subcontracting plan or be ineligible for award.SAM.gov record
Contract periodBase year plus 4 option years (projected 5 years)Phase-in lasts 60 days after award, with the incumbent still in charge.FY27 SBIWTP OM PWS REV 1 10.19.26.pdf, page 7
How they chooseHighest technically rated, fair and reasonable pricePrice is checked for fairness and is not ranked against other offers.191BWC26R0009-0003.pdf, page 9
Questions dueNovember 19, 2026, 1:00 PM PST (2:00 PM MST)This is today. Late questions get no answer unless the CO calls them significant.191BWC26R0009-0003.pdf, page 2
Estimated value$21,000,679.06 to $23,211,276.86 (base year FY27 planning band)Planning bands, not a cap. The top option-year band reaches $25,124,632.59 in FY31.191BWC26R0009-0003.pdf, page 10
Contract typeFirm-fixed-price (FFP)Each CLIN and performance period must be priced firm-fixed-price.FY27 SBIWTP OM PWS REV 1 10.19.26.pdf, page 7
How to submitSharePoint portal upload onlyEmail, fax, mail and hand delivery are not accepted.191BWC26R0009-0003.pdf, page 3
Site visitOctober 14, 2026, 9:00 AM PST (10:00 AM MST); already passedNames were due October 7, 2026, and anyone who misses the visit gets no second chance.191BWC26R0009-0003.pdf, page 2

How to respond

  1. Today, before 1:00 PM PST, email any questions to the CO at Philip.Johnson@ibwc.gov, referencing solicitation 191BWC26R0009.
  2. By January 4, 2027, 12:00 PM MDT, email Philip.Johnson@ibwc.gov with the subject Request for SharePoint Access - Solicitation 191BWC26R0009, giving company name, authorized representative, uploader email and phone. If you need the CUI files (O&M manual, security plan, facility security plan, border crossing SOP), ask for access and sign the NDA in the same request.
  3. Build Volume I as a price-free PDF of 20 double-sided pages or fewer, organized by Factors 1 to 7. Build Volume II as a separate PDF with the Government's O&M Services Price Workbook (native Excel and PDF), SF 33, acknowledgments of all amendments, Section K, L.03, and a Section 508 demonstration. Name files [OfferorName]_Vol_[I/II]_[ProposalType].pdf.
  4. Upload both volumes to your SharePoint folder by January 6, 2027, 2:00 PM MST. Late uploads are not accepted, and expired links are not reactivated.
  5. Send each past performance questionnaire request with the client authorization letter (Attachment 25 template), and keep proof that every request was sent.

Attached files

Not stated in what we read

  • Wage rates in Attachment 21 (wage determination CA20240001) could not be reviewed. Read them on SAM.gov before you price labor.
  • Who pays the permit and county fees in Attachment 05, including the NPDES annual fee starting at $93,010.00.
  • Payment terms, liquidated damages and any penalties are not stated in the text we could review.
  • Utilities and other government-furnished property (PWS sections 3.1 and 3.2) are not in the text we could review.
  • The incumbent contractor and its current staffing are not named in the text we could review.
  • Lab sampling quantities (Attachment 23) and the site visit file (Attachment 34) could not be reviewed. Read them on SAM.gov.

Notice text

Ammendment 0003 Revized Q&A, Rev section L&M Ammendment 0002 Q&A Amendment 0001 Operations and Maintance Services for the Southbay Wastewater Treatment Plant The purpose of this amendment 0001update attachment in section J.01 of the solicitation. Update attachment references in the PWS. Add clause 52.215-10, 52.215-12, 52.215-15, 52.215-16, and 52.215-20 Alt III. Removed 52.215-14. Note to access CUI documents, request sharePoint access and sign NDA.

As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

Who may hold this work now

Contracts at International Boundary and Water Commission: U.S.-Mexico for the same kind of work (NAICS 221320, service code M1ND) in California that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.

Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.

History

  • Nov 19, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from International Boundary and Water Commission: US-Mexico by email

Each morning we'll send the new solicitations and sources-sought notices from International Boundary and Water Commission: US-Mexico, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy