1. Opportunities
  2. National Aeronautics and Space Administration
  3. 80NSSC27949241Q-1

Pilatus PC-12 annual maintenance for NASA, Edwards, CA

NASA's Armstrong Flight Research Center wants an FAA and Pilatus certified repair station to do annual maintenance on one Pilatus PC-12 research aircraft (N606NA) and return it airworthy.

Official title: PC-12 Annual Maintenance

Deadline
Nov 30, 4:00 PM CT
4 days left
Who can bid
Not stated
The notice names no set-aside
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Edwards, CA
Buyer: NASA Shared Services Center

What they're buying

NASA delivers the aircraft between December 9 and 11, 2026, and the work must be finished within 6 weeks of delivery.

Top catches

Pilatus certification conflict
“All responding vendors must be an FAA and Pilatus certified repair station for PC-12 aircraft and must provide certification documents.” Notice text

The RFQ's copy of the SOW says only FAA certified in places, but the notice text and the standalone SOW require FAA and Pilatus certification. Assume Pilatus certification is required, and attach your certification documents to your quote or your quote is non-responsive.

Statement of compliance required
“Failure to provide a statement of compliance will result in your quote being deemed non-responsive and not considered for award.” Notice text

Your quote, or an email, must state that you can comply with Q-1A, Q-1C and Q-3. Without that statement your quote is non-responsive, so include it in the quote itself.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 25, 2026 from the notice and 5 of 5 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Annual inspection packages (300FH, 600FH, 300FH/12 month, 600FH/12 month, 1200FH/12 month) on Pilatus PC-12 serial 1081 (N606NA), plus the 2400 FH/24 month package inspection
  • Fuselage strakes AD 2021-24-01 bracket and structure inspection
  • Annual engine inspection (engine serial PCE-RY0107), chip detector checks, and about 28 lettered Pilatus, L-3 and Pratt & Whitney tasks such as flap actuator backlash checks and the emergency power supply check
  • Identify all Required Inspection Items and give NASA an estimated schedule with your quote; updates at least every 2 weeks
  • Deliver a certificate of conformance, FAA 8130-3 release certificates, maintenance records, fastener material certifications, a discrepancy report, and data for the NASA NAMIS database
  • Return the aircraft airworthy, with the modified research instrumentation unharmed; NASA quality inspectors may need access at mandatory inspection points, with 2 days notice and 7 work days if you are outside the AFRC commuting area

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Pilatus certification conflict. The RFQ's copy of the SOW says only FAA certified in places, but the notice text and the standalone SOW require FAA and Pilatus certification. Assume Pilatus certification is required, and attach your certification documents to your quote or your quote is non-responsive.
  • Statement of compliance required. Your quote, or an email, must state that you can comply with Q-1A, Q-1C and Q-3. Without that statement your quote is non-responsive, so include it in the quote itself.
  • Award depends on the 6-week window. Award is based on your ability to meet the time limit, which runs from a December 9 to 11 delivery. Confirm your shop can take the aircraft in December and finish within 6 weeks before you bid.“NASA AFRC will deliver the aircraft between December 9th and December 11th, 2026.” SOW.pdf, page 6
  • Extra findings need written approval. NASA must approve each over and above finding in writing before you fix it, and any added cost needs prior written approval from the Contracting Officer. Work done without approval will likely not be paid, so plan for this in your price.“additional cost, prior written approval must be provided by the NASA Contracting Officer.” SOW.pdf, page 6
  • Place of work is your shop. SAM lists Edwards, CA, but the SOW puts the work at your facility, which must be within the contiguous United States. Do not plan to work at Edwards, and confirm your site meets the location rule.“The place of performance will be at the contractor facility location.” SOW.pdf, page 6
  • Ten-year record retention. Material and repair certifications must be kept at least 10 years and produced on request, even after the job ends. Price the storage and record keeping into your quote.“shall be retained for at least 10 years by the supplier, and made available upon request.” Q-1A.pdf, page 1

Key terms

Who can bidFull and open competition; FAA and Pilatus certified repair stationsYou must also be registered in SAM.gov and provide certification documents. Set-aside: Not stated.RFQ.pdf, page 11
Contract period6 weeks from aircraft delivery; delivery December 9 to 11, 2026The 6 weeks run from delivery of the aircraft, not from award.SOW.pdf, page 6
How they chooseLowest price technically acceptable (LPTA)Price decides the award, but only among quotes that show they meet every requirement.RFQ.pdf, page 19
How to submitEmail to Tracy Bremer at tracy.g.bremer@nasa.govInclude CAGE code or UEI, ARO delivery time, FOB Destination, and two points of contact.RFQ.pdf, page 11
Contract typeFirm-fixed-price commercial item orderThe full text of FAR 52.212-4 is not in the files provided, so read it on the FAR site before you price.RFQ.pdf, page 14

How to respond

  1. Confirm that your repair station is FAA and Pilatus certified for PC-12, and attach the certification documents to your quote.
  2. Include a statement that you can comply with Q-1A, Q-1C and Q-3, and state that you meet the AS9100 and ISO 9001 higher-level quality standard.
  3. Put these in your quote: an estimated maintenance schedule, CAGE code or UEI, ARO delivery time, FOB Destination, a 30-day validity statement, and two points of contact with name, phone and email.
  4. Email the quote to Tracy Bremer at tracy.g.bremer@nasa.gov by Monday, November 30, 2026, 4:00 p.m. CT. File format and size limits: Not stated.

Attached files

From SAM.gov. Download links open the original files.

  • Q-1C.pdfNASA quality terms for prime suppliers, including the certification of conformance section. Read and comply; no blank form is included in the text provided. Read.
  • Q-3.pdfNASA source inspection rules, including notice times before NASA inspects your work. Read it and plan for the inspections. Read.
  • SOW.pdfThe statement of work listing the maintenance tasks, deliverables, schedule and quality rules. Read it and price every task; no form to fill in. Read.
  • RFQ.pdfThe request for quotation with instructions, clauses and evaluation rules. Read all of it; the price schedule in this copy is blank, so you must set your own price format. Read.
  • Q-1A.pdfNASA quality rules for aircraft parts, materials and records. Read it and comply; no form to sign in this file. Read.

Not stated in what we read

  • Estimated value: the RFQ shows the total firm-fixed price as TBD.
  • Brand name: the RFQ says it is a brand name or equal requirement but names no brand.
  • Price schedule: the SOW and bid schedule in the RFQ is blank.
  • Set-aside and small business size standard: the SAM record says Not stated.
  • Questions deadline and how to ask questions: Not stated.
  • Return shipping of the aircraft and who pays for it: Not stated.

Notice text

See attached RFQ, SOW, Q-1A, Q-1C, and Q-3 **All responding vendors must state, either in their quote or via email, that they are capable of complying with the attached quality documents. Failure to provide a statement of compliance will result in your quote being deemed non-responsive and not considered for award. **All responding vendors must be an FAA and Pilatus certified repair station for PC-12 aircraft and must provide certification documents. Failure to provide certification documents will result in your quote being deemed non-responsive and not considered for award. * Higher-Level Quality Requirements: AS9100 & ISO 9001 * Q-1A, Q-1C, and Q-3 Compliance is Required * Certificate of Conformance is Required

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 25, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from National Aeronautics and Space Administration by email

Each morning we'll send the new solicitations and sources-sought notices from National Aeronautics and Space Administration, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy