Environmental testing services at Pine Bluff Arsenal, AR
You would provide water, sediment, toxicity and groundwater testing, stormwater sampling, permit and compliance support, and removal of four water wells at Pine Bluff Arsenal, Arkansas.
Official title: Pine Bluff Arsenal Testing, Lab and Engineering Services
- Deadline
- Nov 30, 12:00 PM CT
- 10 days left
- Who can bid
- Small businesses
- Size standard for NAICS 541620: $19 million in average annual receipts · Who qualifies
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- White Hall, AR
- Buyer: W6QK ACC-Ri
What they're buying
The contract is firm-fixed price, with a base year from 14 Dec 2026 to 13 Dec 2027 and four 1-year option years.
Top catches
“This requirement is not set aside for small business.” Solicitation - W519TC27QA031.pdf, page 3
The SAM record says this is a total small business set-aside, but the solicitation says it is not. Confirm with the contracting officer before you price. If it is a set-aside, the subcontracting limit in the contract clauses applies.
“Quotes shall be submitted electronically via email by 2:00 pm, Central Time on 12 November” Solicitation - W519TC27QA031.pdf, page 5
The body of the solicitation still shows 12 Nov 2026 at 2:00 PM. Amendments moved the deadline to 12:00 PM CST on 30 Nov 2026, so a quote sent to the old time would be late. Check SAM.gov for any further change before you send.
Read by AI (Claude Haiku) on Nov 20, 2026 from the notice and 14 of 14 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Acute and chronic toxicity tests on effluent at four NPDES outfalls (008, 010, 012, 01C), quarterly under permit AR0001678, with optional toxicity identification and reduction work.
- Ecological surveys of surface water, sediment and fish tissue at four areas, with an annual report and a 5-year report.
- Statistical groundwater assessments covering 111 wells, RCRA units and 12 corrective action sites, with reports due to DEQ by May 1 and in September to December.
- Stormwater sampling at Outfalls 4, 8 and 10, lab analysis, a draft Storm Water Annual Report by January 16, and SWPPP and permit renewal support.
- Regulatory support: SPCC plan reviews, RCRA permit modifications, Clean Air Act Title V and emissions inventory work, and a Clean Water Act permit renewal application.
- Abandon four water wells (#15 to #18) under Arkansas well rules, plus GIS database upkeep, site travel, and restoration work including a mercury water-quality rule change.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Set-aside status conflicts. The SAM record says this is a total small business set-aside, but the solicitation says it is not. Confirm with the contracting officer before you price. If it is a set-aside, the subcontracting limit in the contract clauses applies.
- Deadline moved twice. The body of the solicitation still shows 12 Nov 2026 at 2:00 PM. Amendments moved the deadline to 12:00 PM CST on 30 Nov 2026, so a quote sent to the old time would be late. Check SAM.gov for any further change before you send.
- Capability statement and full matrix. The quote can be rejected as unresponsive if any year or quantity range is unpriced, if the matrix is changed, or if the capability statement is missing. Fill in only the yellow fields and your name and CAGE code. The notice does not say what the capability statement must contain.“well as fail to provide a capability statement, the Government may reject that quote as unresponsive.” Solicitation - W519TC27QA031.pdf, page 3
- Arkansas accreditation and licences. Any lab doing the water, sediment, soil or toxicity work must hold a current Arkansas environmental laboratory accreditation. Engineers and geologists who prepare or review SPCC, RCRA, CWA and groundwater reports must hold Arkansas licences. Confirm you or your subcontractors have these before you bid.“shall have a current Environmental Laboratory Accreditation from Arkansas Energy and Environment.” Attachment 0001 - A02 - 1.6.2 SOW Revised_15Oct2026.pdf, page 1
- Wage rates not attached. The wage determination is not in this package. Get Wage Determination 2015-5121, Revision 31 from SAM.gov, or the latest version, and price labor against it. Ask how the price-adjustment clause for option years applies before you price years two to five.“Wage Determinations are not attached.” Solicitation - W519TC27QA031.pdf, page 3
- Phillips Creek work may not happen. Phillips Creek and Arkansas River work starts only if the Army and the arsenal find it legally permissible and authorized. Do not price it as firm work. Ask whether it can be a separate priced line or an option.“performed only upon a determination by the U.S. Army and Pine Bluff Arsenal that they are legally permissible, justified, and authorized.” Attachment 0001 - A02 - 1.6.2 SOW Revised_15Oct2026.pdf, page 10
Key terms
| Who can bid | Small businesses only, per SAM record (conflicts with solicitation)Solicitation Section A says the requirement is not set aside.SAM.gov record |
|---|---|
| Contract period | Base year 14 Dec 2026 to 13 Dec 2027; four 1-year options; 6-month extension to 13 Jun 2032CLIN descriptions say the period starts 15 Dec 2026; confirm the start date.Solicitation - W519TC27QA031.pdf, page 3 |
| How they choose | Most advantageous to the Government, price and other factors consideredThe other factors are not listed in the notice.Solicitation - W519TC27QA031.pdf, page 4 |
| How to submit | Email your quote, completed price matrix and capability statementSend to Kristin M Kronfeld and Michelle M Pleasant.Solicitation - W519TC27QA031.pdf, page 5 |
| Questions due | 2:00 PM Central, 4 Nov 2026 (passed)Answers were promised by a later amendment; none is in the package.Solicitation - W519TC27QA031.pdf, page 4 |
| Contract type | Firm-fixed price, commercial servicesEach of the nine lines is priced as one lot.Solicitation - W519TC27QA031.pdf, page 2 |
| Site visit | Safety briefing before any work; 5 days notice for site visitsBriefing is held Monday to Thursday at 7:30 AM, Building 17-130.Attachment 0001 - A02 - 1.6.2 SOW Revised_15Oct2026.pdf, page 1 |
How to respond
- Check SAM.gov for any newer amendment, including the promised question-and-answer amendment, and confirm the set-aside status with Kristin M Kronfeld or Michelle M Pleasant before you price.
- Complete the Attachment 0003 price matrix: fill every yellow field, enter your full name and CAGE code, price every line and every year including the 6-month extension, and change nothing else.
- Prepare a capability statement. The notice requires one but does not say what it must cover.
- Acknowledge Amendments 0001 and 0002 in your quote, and have an authorized officer sign it as the solicitation directs.
- Email the signed quote, matrix and capability statement to kristin.m.kronfeld.civ@army.mil and michelle.m.pleasant.civ@army.mil by 12:00 PM CST on Monday, 30 Nov 2026.
Attached files
- Solicitation - W519TC27QA031.pdfThis is the request for quote with terms, clauses and a summary of the contract lines; you must read it and sign the quote as directed. Read.
- Solicitation Amendment W519TC27QA0310002 SF 30.pdfAmendment 0002 sets the current deadline of 30 Nov 2026 at 12 PM CST and updates option line text; you must acknowledge it with your quote. Read.
- Attachment 0005 - A03. CDRL CLIN002 Base 2026_SC.pdfThis data requirements list covers toxicity test reports; only page 1 of 2 was provided, so you could not review page 2 and must read the full file on SAM.gov. Read in part (pages 1 of 2).
- Attachment 0001 - A02 - 1.6.2 SOW Revised_15Oct2026.pdfThis is the statement of work with the nine tasks, schedules and licence rules; read it closely to price and you do not sign it. Read.
- Attachment 0009 - A03. CDRLs CLIN006 Base 2026_SC.pdfThis data requirements list covers regulatory compliance drafts due 90 days before deadlines; read it and do not sign it. Read.
- Attachment 0006 - A03. CDRLs CLIN003 Base 2026_SC.pdfThis data requirements list covers groundwater assessment reports and their draft timing before May 1; read it for deadlines and do not sign it. Read.
- Attachment 0008 - A03. CDRLs CLIN005 Base 2026_SC.pdfThis data requirements list covers stormwater lab results, the annual report due January 16 and permit drafts; read it and do not sign it. Read.
- Attachment 0010 - A03. CDRLs CLIN007 Base 2026_SC.pdfThis data requirements list covers restoration support plans, drafts and reports; read it and do not sign it. Read.
- Attachment 0004 - A03. CDRLs CLIN001 Base 2026_SC.pdfThis data requirements list covers ecological trend reports and their draft and final due dates; read it for deadlines and do not sign it. Read.
- Attachment 0011 - A03. CDRLs CLIN008 Base 2026_SC.pdfThis data requirements list covers the well abandonment report and certification due within 30 days of each abandonment; read it and do not sign it. Read.
- Attachment 0002 - A02. Purchase Description Characteristics for Env Eng Services.pdfThis is a shorter purchase description that summarizes the scope and contract terms; read it for context and do not sign it. Read.
- Attachment 0007 - A03. CDRLs CLIN004 Base 2026_SC.pdfThis data requirements list covers updates to maps and the GIS database; read it for deliverables and do not sign it. Read.
- Attachment 0003 - B08- W519TC-27-Q-A031 - PRICE MATRIX.xlsxThis is the price matrix you must complete in the yellow fields and return with your quote without changing its structure. Read.
- Solicitation Amendment W519TC27QA0310001 SF 30.pdfAmendment 0001 moved the quote deadline to 20 Nov 2026 at 12 PM CST; Amendment 0002 supersedes that date, so you only need to read it for history. Read.
Not stated in what we read
- Answers to the questions due 4 Nov 2026 were promised by a later amendment and are not in this package.
- Estimated value or budget for the contract is not stated.
- What the capability statement must contain is not stated.
- Section M cites only 52.217-3 Evaluation Exclusive of Options, but the matrix requires prices for every year; whether options are scored is not stated.
- The task says one well per year, but four wells (#15 to #18) are listed; how many wells are priced in the base year is not stated.
- Travel rules, such as rates, per diem and approvals for the travel line, are not stated.
Notice text
The services provided include surface water, sediment, and fish tissue sampling in streams and large river systems, as well as ambient sediment toxicity testing to determine the effectiveness of corrective measures. Acute and chronic whole effluent toxicity testing is conducted for four NPDES permitted outfalls, with the capability to perform Toxicity Identification Evaluation and Toxicity Reduction Evaluation if needed. Additionally, statistical analysis is compiled and conducted for three RCRA Detection monitoring groundwater assessment reports (covering three regulated units) and twelve RCRA Corrective Action Closure sites annually. Maintenance and updating of the PBA-specific Geographic Information System database is also included. The services encompass preparing industrial stormwater permit renewals, Stormwater Pollution Prevention Plans, and stormwater sampling for three outfalls, as well as preparation of Construction SWPPPs and permits. Compliance assistance is provided for SPCC Plan development and review, RCRA Permit development and review, and CAA permit review, renewal, and reporting. The services also support a change of the State of Arkansas Water Quality Standards, Rule 2, for mercury at an NPDES outfall, and assist with contaminant transport investigations in Phillips Creek and the Arkansas River. *Amendment 0001 posted 12 November 2026 *Amendment 0002 posted 19 November 2026
As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.
Contacts
- Kristin Kronfeld, kristin.m.kronfeld.civ@army.mil, 5206930148
- Michelle Pleasant, michelle.m.pleasant.civ@army.mil
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 20, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Similar open notices
Open now under NAICS 541620, environmental consulting services, soonest deadline first.
- Environmental Protection AgencyF OCSPP Consolidated Mission Support
- Department of the ArmyDredged material evaluation services, Galveston, TX
- Department of the ArmyFence-To-Fence Environmental Services for Hickam Air Force Base, Hawaii, Air Force Civil
- Departmental OfficesA Notice of Intent - Research and Technology Advancement Support, A whiteP
- Departmental OfficesA Notice of Intent - Evaluation on Emulsion Breaker
- Departmental OfficesCultural resource survey at Malheur refuge, Oregon
- National Institutes of HealthAsbestos and lead management services at NIH, Bethesda, MD
- Departmental Offices300 AIM terrestrial monitoring plots on Nevada BLM land
Free · at most one email a morning
Get new notices from Department of the Army by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy