Navy pump assembly repair contract
The Navy wants a contractor to repair pump assemblies under a request for quotes, with a required repair turnaround time of 229 days and government source inspection.
Official title: PUMP ASSEMBLY
- Deadline
- Dec 7, 3:30 PM ET
- 11 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- $566K
- Likely Fluid Power Solution LLC
- Place
- Not stated
- Buyer: NAVSUP Weapon Systems Support Mech
What they're buying
The notice does not state quantities, estimated value, or where to send your quote.
Top catches
“The Government is seeking a Repair Turnaround Time (RTAT) of: 229 Days” Notice text
The Navy wants each repaired asset accepted within 229 days of its return to the contractor. If you cannot meet that, you must state your capacity limits in the quote, so check your capacity before you bid.
“NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025)” Notice text
The notice lists a cybersecurity maturity certification requirement but does not say which level applies. Ask the contact named in the notice which level is required and whether you hold it before you quote.
Read by AI (Claude Haiku) on Nov 21, 2026 from the notice. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Repair pump assemblies to the design listed as CAGE reference 10941 N-998-6401-A-001.
- Return repaired assets within the required 229-day repair turnaround time, measured from asset return to acceptance.
- Allow Government Source Inspection (GSI) before final acceptance.
- Quote a testing and evaluation fee for any asset found beyond repair.
- Quote a new unit price and delivery lead time so the Navy can compare repair with buying new.
- Package to MIL-STD 2073 as stated in the schedule, which was not provided.
Who supplied it lately
$566K
on a recent contract for the same kind of product: Fluid Power Solution LLC. It ends Nov 27, 2026.
Matched in USAspending.gov by agency, NAICS and product code; notices rarely name the supplier.
What to watch for
- 229-day repair turnaround. The Navy wants each repaired asset accepted within 229 days of its return to the contractor. If you cannot meet that, you must state your capacity limits in the quote, so check your capacity before you bid.
- Cybersecurity level not stated. The notice lists a cybersecurity maturity certification requirement but does not say which level applies. Ask the contact named in the notice which level is required and whether you hold it before you quote.
- Schedule referenced but not included. The notice points to a schedule for packaging and other terms, and the price table refers to 'SEE SCHEDULE'. No schedule is attached, so you cannot see quantities or delivery dates. Ask the contact for it before you price.“PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE” Notice text
- Award needs your written acceptance. The award is bilateral, so the contract is not final until you accept in writing before it is executed. Plan for a quick written acceptance if you win, because the notice gives no time limit.“requiring the contractors written acceptance prior to execution” Notice text
- Freight handling is unclear. The notice says all freight is FOB Origin and also says the Navy handles freight. Ask who pays for and arranges shipping of the asset to you and back, since this changes your cost.“All freight is FOB Origin.” Notice text
- Option quantity at same unit price. The Navy may add quantity later at the unit price you quote. Price your unit cost as if the added quantity will be bought, since the notice does not give a value for it.“The Government intends to add an option quantity to the resultant contract.” Notice text
Key terms
| Contract type | Fixed-price clause listed; type box left blankThe notice lists a fixed-price inspection clause but does not check Firm-Fixed-Price, Estimated or Not-to-Exceed.Notice text |
|---|
How to respond
- Contact Alison Harper at ALISON.E.HARPER.CIV@US.NAVY.MIL or 771-229-0456 to get the schedule, the cybersecurity level required, and the place of performance before you quote.
- Prepare your quote with unit price, total price, and repair turnaround time in days. If you cannot meet 229 days, state your capacity constraints.
- Add a testing and evaluation fee for assets found beyond repair, and a new unit price and delivery lead time for the buy-new comparison.
- Send the quote by Monday, December 7, 2026, 4:30 PM, -04:00. The submission method and address are not stated.
- If you win, give written acceptance before the contract is executed. The time limit is not stated.
Not stated in what we read
- Quantity of pump assemblies and unit of measure, since the schedule is not provided.
- Delivery dates and where to send quotes or the asset.
- Whether the procurement is set aside and who may bid.
- Which cybersecurity certification level is required.
- Estimated value of the contract.
- Place where the repair work is performed, and how offers will be compared.
Notice text
CONTACT INFORMATION|4|N771.4|WG3|771-229-0456|ALISON.E.HARPER.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO INVOICE AND RECEIVING||TBD|N00104|TBD|TBD|SEE SCHEDULE|SEE SCHEDULE|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS MECHANICSBURG| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|ALISON HARPER AT ALISON.E.HARPER.CIV@US.NAVY.MIL| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| OPTION FOR INCREASED QUANTITY (MAR 1989)|1|365 DAYS| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|X|X|X|||X|X||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| This solicitation is issued pursuant to Emergency Acquisition Flexibilities (EAF).
Accelerated and incremental delivery is encouraged and accepted before the delivery date(s) listed in the schedule. All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractors written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnaround Time (RTAT) of: 229 Days Government Source Inspection (GSI) is required.
Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work. Your quote should include the following information: QUOTE AMOUNT AND RTAT Unit Price:__________ Total Price:__________ Repair Turnaround Time (RTAT):_______ days If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract.
For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractors facility as reflected in the Acction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.
The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE) ___ Return Material Authorization # (RMA), if applicable:__________ TESTING AND EVALUATION IF BEYOND REPAIR T&E fee/price (if asset is determined BR/BER):_________ AWARDEE INFO & PERFORMANCE LOCATION Awardee CAGE:__________ Inspection & Acceptance CAGE, if not same as "awardee CAGE":__________ Facility/Subcontractor CAGE (where the asset should be shipped), if not same as "awardee CAGE":__________ IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW New unit price:__________ New unit delivery lead-time:__________ The Government intends to add an option quantity to the resultant contract.
In reference to the option quantity, the Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The Contracting Officer may exercise the option by written notice to the Contractor within the number of days in FAR 52.217-6 herein. Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the PUMP ASSEMBLY .
2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The PUMP ASSEMBLY repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures.
CAGE___Ref. No. ;10941 N-998-6401-A-001; 3.2 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor.
If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number.
Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order.
The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.
4.2 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE
As published on SAM.gov.
Contacts
- Telephone: 7712290456, ALISON.E.HARPER.CIV@US.NAVY.MIL
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who has supplied this lately
Contracts at Department of the Navy for the same kind of product (NAICS 333914, product code 4320) that end within a year either way of today. Notices rarely name the current supplier: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Pump, Axial PistonsFluid Power Solution LLC · N0010426PJB28 | $565,853 | Nov 27, 2026within a month | OH |
| Sepa Pump, CentrifugalCarver Pump Company · N0010424PJB75 | $374,540 | Nov 25, 2026ended | IA |
| Pump Unit, CentrifugR P M Supply Corporation · N0010426PXA71 | $861,200 | Nov 20, 2026ended | OH |
| Pump Unit, CentrifugR P M Supply Corporation · N0010426PXA70 | $430,600 | Nov 20, 2026ended | OH |
| Pump Rebuilding KitCarver Pump Company · N0040626PS162 | $128,394 | Dec 2, 2026within a month | IA |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 21, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 7, 3:30 PM ET11 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 333914, measuring, dispensing, and other pumping equipment manufacturing, soonest deadline first.
- Defense Logistics AgencyCentrifugal pumps for Defense Logistics Agency
- Department of the NavyReciprocating pump repair and overhaul for the Navy
- Defense Logistics AgencyRotary pumps for DLA Aviation, Philadelphia, PA
- Department of the NavyRepair of rotary pump units for the Navy
- Defense Logistics Agency624 fluid filter elements for DLA San Joaquin distribution
- Defense Logistics Agency21 pressure pumping kits for DLA Distribution Red River
- Department of the NavyPlunger pump assembly repair for the Navy
- Department of the NavyRepair of rotary pump units for the Navy
Free · at most one email a morning
Get new notices from Department of the Navy by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Navy, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy