- Opportunities
- Department of Veterans Affairs
- 36C26027R0021
Sanitary pipe repair and bottle fillers, Spokane VA, WA
You would repair the sanitary drain and vent riser serving drinking fountains in Building 1 of the Mann-Grandstaff VA Medical Center in Spokane, WA, install six new bottle-fill stations, and remediate asbestos and lead.
Official title: Repair Sanitary Waste Piping at the Mann-Grandstaff VA Medical Center
- Deadline
- Dec 2, 9:00 AM PT
- 6 days left
- Who can bid
- SDVOSB firms
- Service-disabled veteran-owned small businesses certified by SBA only · Who qualifies
- Last time
- $332K
- Likely Capex Construction LLC
- Place
- Spokane, WA
- Buyer: 260-Network Contract Office 20 (36C260)
What they're buying
The job is a 209-day firm-fixed-price contract open only to service-disabled veteran-owned small businesses, and proposals are due by email on Wednesday, December 2, 2026 at 9:00am PST.
Top catches
“The latest published Davis-Bacon Act Wage Determination for Ada County, Idaho” Solicitation 36C26027R0021.docx
The solicitation cites a Davis-Bacon wage determination for Ada County, Idaho, but this job is in Spokane, WA. Ask the contracting officer in writing which determination applies, and price labor only after you know. The Attachment 9 wage file was not included in our text.
“Proposals are due in writing via email to Kyle Biessener and Dennis Einarson” Solicitation 36C26027R0021.docx
Proposals go by email only, to both named contacts, by 9:00am PST on December 2. Send early and confirm the VA received it, because a late email will likely mean a rejected offer.
Read by AI (Claude Haiku) on Nov 26, 2026 from the notice and 9 of 22 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Replace the vertical drinking fountain drain and vent riser in Building 1, and the branch piping to each fixture.
- Remove asbestos-containing pipe wrap that blocks demolition, and remediate friable asbestos on accessible surfaces.
- Remediate or remove lead-containing paint and glazed block.
- Install six new ADA/ABAAS-compliant bottle-fill water cooler stations, with new piping and new electrical circuits.
- Repair wall finishes and firestopping to restore existing walls, while keeping the hospital open and patient areas protected.
- Run an operating test in front of the COR, train VA staff, provide O&M manuals, and give a one-year warranty on materials and installation.
Who did it before
$332K
on the contract that likely holds this work now: Capex Construction LLC. It ends Dec 4, 2026.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Wage determination is for Idaho. The solicitation cites a Davis-Bacon wage determination for Ada County, Idaho, but this job is in Spokane, WA. Ask the contracting officer in writing which determination applies, and price labor only after you know. The Attachment 9 wage file was not included in our text.
- Email-only delivery, due Wednesday 9 AM. Proposals go by email only, to both named contacts, by 9:00am PST on December 2. Send early and confirm the VA received it, because a late email will likely mean a rejected offer.
- 75 percent subcontracting cap. The amended Attachment 6 designates special trade contractors, so you likely cannot pay more than 75 percent of the contract amount, excluding materials, to firms that are not small in your program. Check your planned subcontracting before you price the job.“This corrected version properly designates special trade construction contractors as the category for solicitation number” Amendment 36C26027R0021 0002.docx
- Use the November 2026 final specs. The bid set is dated June 20, 2025, but Amendment 0003 posted a final conformed drawing set and combined specs dated November 2026. Price only from the final set, and treat the June 2025 file as background.“June 20, 2025” Attachment 3 668-24-108 Bid Set Specifications.pdf, page 1
- Past work must be as prime. Subcontractor projects do not count for past performance. Only projects where your firm was the prime contractor count, and the Q&A refers to a five-project maximum in Volume 1.“Any relevant past performance must be as a prime contractor.” Answers to Questions - 668-24-108.docx
- Work hours conflict: 7 AM or 7:30 AM. The SOW says normal hours are 7:00AM to 4:00PM, but the later Q&A says weekdays 0730 to 1630. The Q&A likely governs, but confirm the start time with the COR in writing before you schedule crews.“Normal work hours shall be weekdays, 0730 – 1630.” Answers to Questions - 668-24-108.docx
Key terms
| Who can bid | Service-disabled veteran-owned small businesses only (SDVOSB set-aside)Size standard is $19M for NAICS 238220.Solicitation 36C26027R0021.docx |
|---|---|
| Contract period | 209 calendar days after notice to proceedBase period. Performance clock starts at notice to proceed, whose date is not stated.Attachment 1 - 668-24-108 Construction SOW R2.docx |
| How they choose | Firm-fixed price; evaluation factors not stated in the text we reviewedSection 7 (evaluation factors) was not included. The Q&A refers to a technical proposal with a past performance factor.Solicitation 36C26027R0021.docx |
| How to submit | Email to Kyle Biessener and Dennis EinarsonKyle Biessener at kyle.biessener@va.gov; Dennis Einarson at dennis.einarson@va.gov.Solicitation 36C26027R0021.docx |
| Questions due | Thursday, November 12, 2026 at 9:00am PST (passed)Closed. The VA said it has no plans to extend the question period or the bid date.Solicitation 36C26027R0021.docx |
| Estimated value | Between $500,000.000 and $1,000,000.00 (magnitude range)A range only. No exact estimate is stated, and this is not a price you must bid.Solicitation 36C26027R0021.docx |
| Contract type | Firm-fixed price repair contractOne price line: Item 0001, quantity 1.00, unit JB. Enter your total there and on the offer form.Solicitation 36C26027R0021.docx |
| Site visit | Held Tuesday, November 10, 2026 at 9:00am PST (passed)Amendment 0001 replaced the site map; Amendment 0004 added a sign-in sheet. Other visits only by appointment with the VA.Solicitation 36C26027R0021.docx |
How to respond
- Confirm your firm meets the SDVOSB set-aside and the $19M size standard for NAICS 238220 before you prepare an offer.
- Fill in the offer form (SF 1442) and the single price line, Item 0001. In Item 19, acknowledge Amendments 0001 (11-04-2026), 0002 (11-02-2026), 0003 (11-24-2026) and 0004 (11-25-2026) by number and date.
- Prepare Volume 1 (prime past projects, up to five) and Volume 2 (past performance questionnaires or CPARS), as the Q&A describes. Proposal format rules (Section 6) were not in our text, so read them on SAM.gov.
- Email the complete offer to kyle.biessener@va.gov and dennis.einarson@va.gov by 9:00am PST on Wednesday, December 2, 2026. Subject line and file format: Not stated.
- After award, deliver the required insurance documents within 10 calendar days of the notice of award.
Attached files
From SAM.gov. Download links open the original files.
- Attachment 2.1 668-24-108 Drawings.pdf Not read: over our length limit.
- Amendment 36C26027R0021 0003.docxPosts the Q&A and the final conformed drawings and specs; read it and acknowledge it in your offer. Read.
- Attachment 2.2 668-24-108 Drawings.pdf Not read: over our length limit.
- Amendment 36C26027R0021 0001.docxReplaces the site visit area map; read it for the correct meeting location, and acknowledge it in your offer. Read.
- Attachment 9 668-24-108 Wage Determination.pdf Not read: over our length limit.
- Attachment 6 - 668-24-108 Limitations on Subcontracting Certificate of Compliance.pdf Not read: over our length limit.
- Attachment 13 - Site Visit Sign-in Sheet.pdf Scanned image, not read.
- Attachment 12 - 668-24-108 - Combined Specs. - Final Conformed Set.pdfThe November 2026 final combined specifications, partly included; price to this set and read it closely. Read in part (pages 1–16 and 496–503 of 503).
- Attachment 4 668-24-108 PCRA.pdf Not read: over our length limit.
- Attachment 10 - 668-24-108 Site Visit Area Map (Revised).pdf Scanned image, not read.
- Attachment 11 - 668-24-108 Drawings - Final Conformed Set.pdf Not read: over our length limit.
- Solicitation 36C26027R0021.docxThe solicitation cover and offer form (SF 1442) with key dates and rules; only the start was provided. You must fill in and sign the offer pages. Read in part.
- Attachment 5 668-24-108 DESIGN NARRATIVE.pdf Not read: over our length limit.
- Attachment 8 - 668-24-108 - Past Performance Questionnaire.docx Not read: over our length limit.
- Attachment 7 - 668-24-108 - Contractor Rules of Behavior.pdf Not read: over our length limit.
- Amendment 36C26027R0021 0002.docxReplaces Attachment 6, the limitations on subcontracting certificate; read it and complete any certificate it requires. Read.
- Amendment 36C26027R0021 0004.docxAdds Attachment 13, a scanned site visit sign-in sheet that we could not read; acknowledge it in your offer. Read.
- Attachment 2.3 668-24-108 Drawings.pdf Not read: over our length limit.
- Answers to Questions - 668-24-108.docxThe VA answers to contractor questions; these binding answers change scope and rules, so read them before you price. Read.
- Attachment 1 - 668-24-108 Construction SOW R2.docxThe statement of work listing scope, work hours, delivery rules and the 209-day period; read it to price the job. Read.
- Attachment 3 668-24-108 Bid Set Specifications.pdfThe older June 2025 specifications, partly included; read only as background because the final set controls. Read in part (pages 1–16 and 490–495 of 495).
- Attachment 6 - 668-24-108 - Limitations on Subcontracting-Construction.pdf Not read: over our length limit.
Not stated in what we read
- Evaluation factors and their weights: Section 7 was not in the text we reviewed.
- Whether performance and payment bonds are required, and how long your offer must stay valid.
- Whether Add Alternate No. 1 (two door frames and a wall section) must be priced, since the price schedule shows one line.
- Which wage rates apply in Spokane: the wage determination file (Attachment 9) was not included.
- Whether the November 10 site visit was required to bid, and how you can see the site now that it has passed.
- Several attachments were not in our text, including the proposal rules (Section 6), the PCRA (Attachment 4) and the design narrative (Attachment 5). You must read them on SAM.gov.
Notice text
The Mann-Grandstaff VA Medical Center, Spokane, WA requires labor, materials, and equipment for the repair of sanitary waste piping in Building 1 (Main Hospital) for Project 668-24-108. Please review attached Solication # 36C26027R0021 for full details and proposal submission requirements. Amendment 0001 - Posting of revised Site Vist Map Amendment 0002 - Posting of revised Attachment 6 - Limitations on Subcontracting. Amendment 0003 - Posting of Questions and Answers along with Final Confromed Drawings and Combined Specs Amendment 0004 - Posting of Site Visit Sign-in Sheet
As published on SAM.gov.
Contacts
- Kyle Biessener, kyle.biessener@va.gov, (360) 852-9884
- Dennis Einarson, dennis.einarson@va.gov, (360) 852-9884
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at Department of Veterans Affairs for the same kind of work (NAICS 238220, service code Z1DA) in Washington that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| 668-26-103S Pharmacy Cache HVAC Repair, Spokane, WA 99205Capex Construction LLC · 36C26026C0064 | $331,846 | Dec 4, 2026within a month | WA |
| 668-25-105 Replace Grease Traps in Spokane for MgvamcDri, Inc. · 36C26026C0060 | $300,465 | Jan 23, 2027in 1 month | WA |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 26, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 2, 9:00 AM PT6 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 238220, plumbing, heating, and air-conditioning contractors, soonest deadline first.
- Department of Veterans AffairsBrine tank maintenance and salt delivery, Loma Linda, CA
- Department of Veterans AffairsAnnual Chiller Maintenance & Remote 24/7 Monitoring
- Indian Health ServiceMedical gas and vacuum system inspection, Tonalea, AZ
- Bureau of Indian AffairsJ Notice of Intent to Award a Sole Source Contract.
- US Coast GuardStorm repairs at Coast Guard building, Dauphin Island, AL
- Federal Prison System / Bureau of PrisonsReplace powerhouse hot water tanks at FCI Marion, Illinois
- Department of Veterans AffairsHVAC maintenance and filters at Omaha, Grand Island VA
- Department of the Air ForceMechanical systems repair IDIQ for Air Force, FY27-32
Free · at most one email a morning
Get new notices from Department of Veterans Affairs by email
Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy