1. Opportunities
  2. Department of Energy
  3. 0000966967

Research reactor fuel fabrication RFI, Richland, WA

Battelle, a contractor to NNSA, asks industry about making high-assay low-enriched uranium (HALEU) uranium-molybdenum (U-10Mo) fuel plates and elements for research reactors, listed at Richland, WA.

Official title: RFI U-10Mo Fuel Fabrication

Deadline
Dec 21, 4:00 PM PT
25 days left
Who can bid
Any business
Registered in SAM.gov · How to register
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Richland, WA
Buyer: PNNL Contracts - DOE Contractor

What they're buying

This is a request for information, not a bid, and it states no contract term.

Top catches

This is not a bid
“The Respondent(s) shall provide a written letter of interest (LOI) which includes the information requested in the tasks and requirements described in the paragraphs below.” RFI for U-10Mo Monolithic Fuel Fabrication Final.pdf, page 12

No contract is offered here, so do not price a bid. Your letter of interest may include a rough cost estimate and timeline for a facility, as the RFI asks.

Licensed nuclear facility required
“Category II Special Nuclear Material (SNM) facility or Department of Energy Hazard” RFI for U-10Mo Monolithic Fuel Fabrication Final.pdf, page 14

You must have, or have a credible plan to get, a facility licensed for this material. Without one, you cannot fully answer the RFI. Confirm this before you write your letter.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 3 of 3 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Alloy: vacuum induction melting casting of U-10Mo, ingot machining to roughly 0.2 inches thick, and acid cleaning before hot roll bonding.
  • Foil: hot co-roll bonding of the ingot with a zirconium interlayer, then cold rolling to final foil thickness, with anneal as needed.
  • Plates: HIP can assembly, electron beam welding, hot isostatic pressing at about 560°C and 103 MPa for 90 minutes, decanning, polishing, and inspection. One delaminated bend sample rejects every plate in that HIP pack.
  • Elements: plate forming as needed, swaging plates into aluminum side plates, end-fitting welding, final machining, boehmite treatment, and final inspection.
  • Volume: about 10,000 plates and 200 elements a year, using 3,000 to 3,500 kg of HALEU metal a year.
  • Letter of interest: under 20 pages covering the seven tasks in RFI Section 4, including a rough cost estimate and timeline for facility development.

Who supplied it lately

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • This is not a bid. No contract is offered here, so do not price a bid. Your letter of interest may include a rough cost estimate and timeline for a facility, as the RFI asks.
  • Licensed nuclear facility required. You must have, or have a credible plan to get, a facility licensed for this material. Without one, you cannot fully answer the RFI. Confirm this before you write your letter.
  • Process not yet proven at scale. Output so far is only hundreds of plates a year, and the largest full-size plates have not been demonstrated. The notice also says technical requirements may change. Decide whether you can carry that risk before you commit to a facility plan.“Throughput is currently at the 100s of plates per year due to the fuel’s unlicensed status.” Technical Questions - Repsonse - RFI-966967 - 10-1-2026.pdf, page 4
  • Contractors may read your letter. The notice says contractors for ORCUS and DOE/NNSA federally funded research centers will review every letter. Mark trade secrets and pricing as proprietary, and share only what you are willing to have reviewed.“should assume that all LOIs will be reviewed by ORCUS and cognizant DOE/NNSA” RFI for U-10Mo Monolithic Fuel Fabrication Final.pdf, page 12
  • Questions window has closed. Round 2 questions were due November 12, and answers were due November 19, 2026. Those answers are not in the documents provided, so ask Chris Martin for them before you write your letter.“Second round of question to be provided to Battelle by Thursday November 12,” RFI for U-10Mo Monolithic Fuel Fabrication Final.pdf, page 15
  • Master foil cold rolling conflict. The RFI says the master foil is cold rolled. The later October Q&A says only the child foil is cold rolled. Confirm which process you are pricing, because it changes the rolling equipment and labor.“The resulting master foil is then cold-rolled at room temperature” RFI for U-10Mo Monolithic Fuel Fabrication Final.pdf, page 6

Key terms

Who can bidNo set-aside usedThe notice does not limit who can respond. Teams of companies are acceptable, and US businesses are preferred.SAM.gov record
Questions duePassed: round 2 questions were due Thursday November 12, 2026Round 2 answers were due November 19, 2026. Those answers are not in the documents provided.RFI for U-10Mo Monolithic Fuel Fabrication Final.pdf, page 15
Estimated valueAbout $100–$175M per year (market estimate)Preliminary market value of supplying U-10Mo fuel. It is not a contract value.RFI for U-10Mo Monolithic Fuel Fabrication Final.pdf, page 12

How to respond

  1. Read RFI Section 4.1, which lists the seven items your letter must cover, and the October 1 Q&A before you write.
  2. Write a letter of interest under 20 pages. Cover your organization, staff experience, facility options with a rough cost estimate and timeline, your approach, quality (NQA-1 or equivalent), and safety, security and waste programs.
  3. Mark proprietary sections, since contractors for ORCUS and DOE/NNSA federally funded research centers may review the letter.
  4. Send it by Monday, December 21, 2026, 4:00 PM (UTC-08:00). The notice does not say how to send it, so ask Chris Martin at Christopher.martin@pnnl.gov or 509-372-6026 before the deadline.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Round 2 questions and answers, due November 19, 2026, are not in the documents provided.
  • How to send the letter of interest (email, portal or mail) is not stated.
  • Whether any future solicitation, its contract type, value and period will be issued. Only a market estimate is given.
  • Whether NNSA-supplied equipment and government-furnished HALEU metal come at no cost to the fabricator, and who pays for the non-recurring engineering.
  • Where the fabrication facility would be. The notice names Richland, WA only as the place of performance.
  • Which reactors are in scope. The specification lists ATR, ATRC, MITR, MURR and NBSR, while the RFI market estimate names ATR, HFIR, NBSR, MURR and MITR.

Notice text

Battelle is requesting information in regard to the fabrication of U-10Mo as noted in the attached Request for Information (RFI) document. The information to be provided is noted in Section 4, Request for Information Tasks, RFI document. Please note that Battelle will be compiling any and all questions submitted in response to the RFI and providing feedback as noted in Section 5, RFI Schedule, of the RFI document. Please feel free to contact me directly if there are any questions in regard to the request. Thanks Chris Martin Contracting Specialist Pacific Northwest National Laboratory Phone: 509-372-6026 E-mail: Christopher.martin@pnnl.gov

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 17, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of Energy by email

Each morning we'll send the new solicitations and sources-sought notices from Department of Energy, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy