Stop bolt bearing retainer assemblies for Navy ships
The Navy wants stop bolt bearing retainer assemblies built to NAVSEA drawing 751-7072515, with material certification and traceability marking, delivered within 365 days.
Official title: RING,BEARING,OUTER
- Deadline
- Dec 21, 4:30 PM ET
- 25 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- $674K
- Likely Schaeffler Aerospace USA Corp
- Place
- Not stated
- Buyer: NAVSUP Weapon Systems Support Mech
What they're buying
The quantity and place of performance are not stated in the provided text.
Top catches
“Drawings associated with this solicitation will be made available on the SAM.gov website but will be restricted access, which needs to be approved.” Notice text
Drawings are on SAM.gov but restricted until approved. Request access now, then email the contact on the solicitation to say you asked. The response deadline is December 21, 2026.
“All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order.” Notice text
Before award, you must send your current quality system procedures to the Procurement Contracting Officer. Have them ready now, because this applies to Level I/SUBSAFE material.
Read by AI (Claude Haiku) on Nov 21, 2026 from the notice. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Stop bolt bearing retainer assemblies made to NAVSEA drawing 751-7072515 and ER7072515A1, Assembly A1
- Retainer part 7072515-2 with quantitative chemical and mechanical test certification (ASTM-B150, alloy C63200)
- Non-destructive test certification for weld repairs and production welds, with welding and brazing procedures approved before work starts
- Thread inspection to the FED-STD-H28 series, at least System 21 unless the drawing sets another system
- Certificate of compliance, traceability markings, and signed test certification for each item
- Certification data submitted 20 days before scheduled delivery, with final delivery within 365 days
Who supplied it lately
$674K
on a recent contract for the same kind of product: Schaeffler Aerospace USA Corp. It ended Oct 5, 2026.
Matched in USAspending.gov by agency, NAICS and product code; notices rarely name the supplier.
What to watch for
- Drawings need access approval. Drawings are on SAM.gov but restricted until approved. Request access now, then email the contact on the solicitation to say you asked. The response deadline is December 21, 2026.
- Quality procedures due before award. Before award, you must send your current quality system procedures to the Procurement Contracting Officer. Have them ready now, because this applies to Level I/SUBSAFE material.
- Missing certification papers mean rejection. Material that arrives without the required certification papers, or with missing or wrong data on them, will be rejected. Build complete certification into your price and your shipping step.“If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected.” Notice text
- Title and part description differ. The record title says ring, bearing, outer. The notice text describes a stop bolt bearing retainer assembly. Confirm which part you would supply before you price it.“The Stop Bolt Bearing Retainer Assembly must be made in accordance with NAVSEA drawing 751-7072515” Notice text
- Set-aside status not stated. The set-aside field says Not stated. The notice also lists a small business subcontracting plan clause. The text does not say whether this buy is reserved for small firms, so confirm before you bid.“SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))” Notice text
- Review time eats into delivery. The Navy review of certification data can take 45 working days. Count that time against the 365 day delivery and quote delivery days that cover it.“PNSY review/acceptance of Certification CDRLs 45 working days after receipt of Certification DD 1423 CDRLs.” Notice text
Key terms
| Contract period | Final delivery within 365 daysNotice says to quote actual delivery days. No start or end dates are given.Notice text |
|---|---|
| Contract type | Fixed-price purchase orderThe notice lists a fixed-price inspection clause and refers to a contract or purchase order.Notice text |
How to respond
- Request access to the restricted drawings on SAM.gov, then email the contact listed in the notice at amanda.l.bailey50.civ@us.navy.mil to say you have asked.
- Send copies of your current quality system procedures to the Procurement Contracting Officer before award. The notice does not say where to send them.
- Submit your offer by Monday, 2026-12-21 at 16:30, offset -05:00. The notice does not state where or how to send it, so check the solicitation on SAM.gov.
- Include a certificate of compliance and signed test certification for each item. The notice does not state any other required forms or file format.
Not stated in what we read
- The notice text is cut off in section 3.22. The rest of the notice may cover evaluation, submission and award terms.
- Quantity of assemblies to build.
- Where and how to submit your offer, and any required forms or format.
- Delivery address. The notice says FOB destination but gives no address.
- Set-aside status and size standard for this buy.
- Estimated value and evaluation method.
Notice text
CONTACT INFORMATION|4|N743.4|WVE|1 771-229-0743|amanda.l.bailey50.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specification sections C and E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo-Receiving Report & Invoice - Material|N/A|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material|N50286|TBD|133.2|N/A|N/A|N39040 - Certifications|N/A|N/A|S ee DD1423|PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))|2||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1.
DD1423 Data Items with title of "INSPECTION AND TEST PLAN" SUB TITLE "INSPECTION SYSTEM PROCEDURES" are hereby waived. 2. Drawings associated with this solicitation will be made available on the SAM.gov website but will be restricted access, which needs to be approved.Once access has been requested, interested vendors should email the POC listed on the solicitation to inform them of the request. 3. NAVSUP WSS Mech will be considering past performance in the evaluation of offers in accordance with DFARS 252.204-7024.
4. The following proposed delivery schedule applies: Submission of Certification Data CDRLs will be on or before 20 days prior to scheduled delivery. PNSY review/acceptance of Certification CDRLs 45 working days after receipt of Certification DD 1423 CDRLs. Final delivery of material (365 days) Please quote actual delivery days Early and incremental delivery is acceptable at no additional cost to the Government. 5. This procurement is issued pursuant to Emergency Acquisition Flexibilities. \ 1.
SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material.
2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.
2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract.
Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
DRAWING DATA=7072515 |53711| A| |D|0001 | A|49998|0646811 DRAWING DATA=7072515 |53711| A| |D|0002 | A|49998|0032489 DRAWING DATA=7072515 |53711| A| |D|0003 | A|49998|0008489 DRAWING DATA=7072515 |53711| A| |D|0004 | A|49998|0010621 DRAWING DATA=7072515 |53711| A| |D|0005 | A|49998|0023072 DRAWING DATA=7072515 |53711| A| |D|0006 | A|49998|0042801 DRAWING DATA=7072515 |53711| A| |D|0007.1 | A|49998|0020842 DRAWING DATA=7072515 |53711| A| |D|0007.2 | A|49998|0024070 DRAWING DATA=7072515 |53711| A| |D|0008 | A|49998|0014325 DRAWING DATA=7072515 |53711| A| |D|0009 | A|49998|0028177 DRAWING DATA=7072515 |53711| A| |D|0010 | A|49998|0021165 DRAWING DATA=7072515A1 |53711| C|ER |D|0001 | C|49998|0772786 DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-B150 | | | |190401|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3.
REQUIREMENTS 3.1 ;The Stop Bolt Bearing Retainer Assembly must be made in accordance with NAVSEA drawing 751-7072515 and ER7072515A1, Assembly A1, except as amplified or modified herein.; 3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Retainer, Part 7072515-2; Material - ;ASTM-B150, Alloy C63200; 3.3 Testing Certification - Certifications are required for the following tests on the items listed below.
Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - Non-Destructive Tests Item - ;Weld Repair and/or Production Weld (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification 3.4 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series.
Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.4.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.4.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22.
System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.4.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.5 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications.
When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions).
The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/ 3.6 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications.
For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.7 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings.
3.8 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.8.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer.
Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance.
3.8.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.8.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract.
ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change.
3.9 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.10 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only.
Further application of the above documents is prohibited.prohibited. 3.10.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.11 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results.
Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer.
3.12 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.12.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order.
3.12.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.12.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order.
Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.12.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished.
If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.12.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption.
3.13 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.13.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements.
When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.13.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.14 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility.
Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant.
Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.14.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document.
3.14.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.14.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract.
3.14.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.14.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier.
3.15 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.15.1 Visual examination upon receipt to detect damage during transit. 3.15.2 Inspection for completeness and proper type. 3.15.3 Verification of material quality received. 3.15.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage.
3.15.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.15.6 Identification and protection from improper use or disposition. 3.15.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.15.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material.
Records of all inspection and maintenance performed on bailed property must be maintained. 3.15.9 Material returned to the contractor must be handled as GFM. 3.16 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements.
Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.16.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order.
3.17 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties.
Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.17.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is required.
All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing. 3.17.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material.
3.17.3 Traceability markings must be maintained through assembly, and whenever possible must be visible after assembly. For items where the marking is not visible after assembly, a durable tag must be securely attached to the assembly identifying the part number, piece number, traceability number, and the location of the permanent mark. 3.17.4 Marking must be legible and must be located so as to not affect the form, fit, and function of the material. ; ; 3.18 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply: 3.18.1 Quantitative chemical and mechanical analysis of material traceable to traceability markings is required.
Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material supplied. 3.18.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable.
Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements.
When only the mechanical properties are altered, the original certification forchemical composition must be overstamped and annotated with the unique traceability material and at a minimum contain the information below. TRACEABILITY MARKING ________________________________________________ (marking on finished item) IS FABRICATED FROM RAW MATERIAL IDENTIFIED TO HEAT/LOT NUMBER ______________ AND HEAT TREAT NUMBER _____________________ (when applicable) _________________________________________ DATE _____________________ (name and signature of auth. co. rep.) 3.18.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements.
Transcription of certification data is prohibited. 3.18.4 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.18.5 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.19 Material Handling - The written material control process must include the following: 3.19.1 All raw materials must have traceability markings (except as specified below).
3.19.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability. 3.19.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed.
The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.19.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption.
At a minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors.
3.19.5 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material. 3.19.6 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations.
If such operations would remove traceability markings, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.20 Receiving inspection - 3.20.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to another location.
3.20.2 Receiving Inspection must include as a minimum - Verification that the traceability marking on the material agrees with that on the certification test reports. Verification that certification test reports are legible and complete. Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements. 3.21 Discrepancy reporting - 3.21.1 Nonconforming products from sub-tier suppliers must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products.
The prime contractor must report the receipt of any nonconforming products to the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records must be maintained and available for review by the government Quality Assurance Representative (QAR). 3.22 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.22.1 Material Sampling - Material must be inspected for form, fit, and function.
Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specificati...
The SAM.gov extract cuts descriptions at 32,000 characters; the rest is on SAM.gov.
As published on SAM.gov.
Contacts
- Telephone: 7176053354, AMANDA.L.BAILEY50.CIV@US.NAVY.MIL
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who has supplied this lately
Contracts at Department of the Navy for the same kind of product (NAICS 332991, product code 3110) that end within a year either way of today. Notices rarely name the current supplier: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Sepa, Bearing, DB SpecialSchaeffler Aerospace USA Corp · N0010424PEJ68 | $673,519 | Oct 5, 2026ended | CT |
| Bearing, Ball, AnnulaSchaeffler Aerospace USA Corp · N0010424PNC88 | $138,534 | Sep 30, 2026ended | CT |
| Bearing, Ball, ThrustSchaeffler Aerospace USA Corp · N0010425PEC13 | $147,665 | Feb 1, 2027in 2 months | CT |
| Bearing, Ball, ThrustSchaeffler Aerospace USA Corp · N0010425PBD98 | $138,635 | Sep 16, 2026ended | CT |
| Bearing, Ball, AnnulaSchaeffler Aerospace USA Corp · N0010424PYC64 | $130,912 | Sep 14, 2026ended | CT |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 21, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 21, 4:30 PM ET25 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 332991, ball and roller bearing manufacturing, soonest deadline first.
- Defense Logistics Agency513 cylindrical roller bearings for DLA Distribution
- Defense Logistics AgencyNeedle roller bearing source search, Richmond, VA
- Defense Logistics AgencyDomestic sources for 12 foreign-made bearing items
- Defense Logistics AgencyDuplex ball bearings for DLA depot, Oklahoma
- Defense Logistics Agency37 ball bearing units for DLA Distribution
- Defense Logistics AgencyAirframe ball bearings for DLA Cherry Point
- Defense Logistics Agency88 cylindrical roller bearings for DLA Warner Robins
- Defense Logistics Agency19 needle roller bearings for DLA Distribution
Free · at most one email a morning
Get new notices from Department of the Navy by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Navy, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy