1. Opportunities
  2. Department of Defense
  3. Department of the Air Force
  4. FA446027Q0004

Roof snow and ice retention rails, Little Rock AFB, AR

The Air Force wants a complete, non-penetrating snow and ice retention rail system for the standing-seam metal roof of Building 618 at Little Rock Air Force Base, AR, covering 720 linear feet.

Official title: Roof Snow Block

Deadline
Nov 27, 4:00 PM CT
2 days left
Who can respond
Any business
Market research, not a bid
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Little Rock Air Force Base, AR
Buyer: FA4460 19 Cons Pka

What they're buying

This is a sources sought notice for market research, and responses are due Friday, November 27, 2026.

Top catches

Clamp load figures conflict
“not less than 1,500 pounds per clamp when installed on 24-gauge steel standing seams” B618_Roof_Snow_and_Ice_Retention_Salient_Characteristics PDF.pdf, page 1

The notice text lists 500 pounds per clamp or linear foot, while the attachment requires 1,500 pounds per clamp. Ask which figure governs and price to the higher requirement.

Small business size standard check
“Small Business Set Aside - Total” SAM.gov record

This is a total small business set-aside under NAICS 332322. The size standard is not in the provided text, so check your size before you respond.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 1 of 1 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Furnish 720 linear feet of continuous snow and ice retention rail on the Building 618 roof.
  • Non-penetrating stainless-steel clamps for 24-gauge standing-seam roofs, with at least two 3/8-inch cup-point set screws per clamp.
  • Extruded 6061-T6 aluminum rails with factory-applied finish, 6 to 8 feet per section (estimated 120 six-foot sections).
  • Aluminum ice stoppers 2.25 to 3.50 inches below the rail (estimated 960), attached to the rail only.
  • Concealed sliding expansion splices (estimated 120) allowing 0.75 to 1.0 inch of thermal movement.
  • Project-specific layout, bill of materials and load calculations, plus fasteners and 3/16-inch Allen bits (estimated 1,200 set screws, 600 clamps, 750 fasteners, 15 bits).

Who supplied it lately

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Clamp load figures conflict. The notice text lists 500 pounds per clamp or linear foot, while the attachment requires 1,500 pounds per clamp. Ask which figure governs and price to the higher requirement.
  • Small business size standard check. This is a total small business set-aside under NAICS 332322. The size standard is not in the provided text, so check your size before you respond.
  • Lab test proof for each clamp. Each clamp needs documented lab testing at 1,500 pounds and installation torque of at least 90 inch-pounds. Get these records from your supplier before you price the job.“Clamp testing shall reflect installation torque of not less than 90 inch-pounds.” B618_Roof_Snow_and_Ice_Retention_Salient_Characteristics PDF.pdf, page 1
  • Sources sought, not a bid. This notice gathers market information and does not state an award basis or a solicitation date. Respond only if you can meet the requirements, and do not expect a price quote to be requested here.“Notice type: Sources Sought” SAM.gov record
  • You must supply the engineering layout. You must provide a project-specific layout and load distribution. The attachment gives no site snow or wind load values, so budget engineering time or a partner before you price.“The offeror shall provide a project-specific layout showing rail placement, clamp spacing, and load distribution across the roof system.” B618_Roof_Snow_and_Ice_Retention_Salient_Characteristics PDF.pdf, page 1
  • Set screw tip type differs. The notice text allows round-point or non-cutting set screws, but the attachment requires cup-point set screws. Price cup-point screws unless the Air Force confirms otherwise.“Fastening hardware must utilize round-point or non-cutting setscrew designs” Notice text

Key terms

Who can bidSmall businesses only (total small business set-aside)The size standard for NAICS 332322 is not stated in the provided text.SAM.gov record
Contract typeSources sought notice (market research)This notice is for market research, not a solicitation.SAM.gov record

How to respond

  1. Check your size against the small business standard for NAICS 332322. The provided text does not give the standard.
  2. Submission method and recipient: Not stated. Check the SAM.gov notice page for the contact and method before the deadline.
  3. Send your response by Friday, November 27, 2026, 4:00 PM, -06:00 offset. Contents of the response: Not stated in the notice text.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Estimated contract value.
  • Contract period or installation schedule.
  • How and where to submit the sources sought response, and who to contact.
  • Whether a solicitation will follow, and the award basis.
  • Site-specific snow and wind loads for Little Rock Air Force Base.
  • Size standard for NAICS 332322.

Notice text

This acquisition is a new requirement for the procurement of an engineered, continuous pipe or fence-style rail snow retention system for facility roof installation. System Configuration: Must be a continuous horizontal pipe- or fence-style rail snow retention system capable of bridging across structural roof panels and providing continuous longitudinal perimeter retention. Retention Capacity & Coverage: System must furnish 720 linear feet of continuous perimeter retention coverage.

Substrate Compatibility: Mounting clamps and hardware must be fully compatible with the host metal roofing profile (e.g., standing seam or exposed fastener). Attachment systems for standing-seam profiles must utilize non-penetrating clamping mechanisms to preserve the weather-tight integrity and manufacturer warranty of the roof panels. Structural Performance Thresholds: System components (brackets, clamps, rails, and fasteners) must be engineered and rated to resist site-specific snowpack and ice accumulation shear loads without permanent mechanical deflection.

Clamp-to-seam holding strength must meet or exceed minimum structural thresholds (e.g., capable of sustaining design loads up to 500 lbs per clamp or linear foot minimum, adjusted to site-specific engineering design calculations). Fastening hardware must utilize round-point or non-cutting setscrew designs (e.g., 300-series stainless steel per ASTM F880) to prevent piercing, galling, or compromising protective coatings on metal roof seams.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 21, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Air Force by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Air Force, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy