Rotary stepper motor calibration at Newport, RI
The Navy's Naval Undersea Warfare Center Division Newport wants a firm fixed price purchase order for rotary calibration of stepper motors on its Acoustic Pressure Tank Facility and Open Tank Facility rotators, performed on site in Newport, RI.
Official title: Rotary Stepper Motor Calibrations
- Deadline
- Dec 2, 2:00 PM ET
- 7 days left
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Newport, RI
- Buyer: NUWC Div Newport
What they're buying
The base year calls for one APTF and two OTF calibrations, and the same counts repeat in four option years.
Top catches
“Base Year Calibrations required within scheduled maintenance period” Motor Calibrations RFQ.pdf, page 2
Base-year calibrations must be done during the Underwater Sound Reference Division maintenance period, 11 to 20 January 2027. Confirm you can get on site and finish in that window before you price the job.
“Only offerors with a CMMC Level 2 (self) assessment or higher posted in SPRS will be eligible to receive a copy of the drawings.” Motor Calibrations RFQ.pdf, page 3
You cannot get the drawings unless a CMMC Level 2 (self) assessment is posted in SPRS. Without the drawings you cannot show the quote meets the technical specifications, so check your SPRS status and send your CMMC Unique ID to the point of contact now.
Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 4 of 5 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Base year: one APTF and two OTF rotary stepper motor calibrations. Each option year lists the same counts.
- Measure positional accuracy through 360 degrees, clockwise and counterclockwise.
- Measure angular accuracy by laser interferometry.
- Calibrate to ISO/IEC 17025:2017 and use calibrated equipment under the same standard.
- Deliver a calibration report (CDRL A001) and an ISO/IEC 17025:2017 certificate (CDRL A002) within 10 working days after the work is done.
- Follow NUWCDIVNPT security and OPSEC rules while on base.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Tight base-year calibration window. Base-year calibrations must be done during the Underwater Sound Reference Division maintenance period, 11 to 20 January 2027. Confirm you can get on site and finish in that window before you price the job.
- Drawings need an SPRS CMMC score. You cannot get the drawings unless a CMMC Level 2 (self) assessment is posted in SPRS. Without the drawings you cannot show the quote meets the technical specifications, so check your SPRS status and send your CMMC Unique ID to the point of contact now.
- Lowest price wins if technically acceptable. The government will award to the lowest priced quote that meets the technical requirements, so margins are likely to be thin. Price carefully and confirm your method meets the drawings before you bid.“evaluation method is Lowest Priced, Technically Acceptable (LPTA)” Motor Calibrations RFQ.pdf, page 2
- US citizenship required for site access. Anyone working on the Government site must be a US citizen, and may be searched at any time. Check that your crew qualifies before you bid, and plan for the security rules that apply to site work.“US Citizenship is required for access.” Motor Calibrations RFQ.pdf, page 2
- OTF drawing not reviewed. We could not review the OTF rotator diagram, which is an image file. You must open it yourself and check the OTF requirements before you price the two OTF calibrations each year.“Please see the attached Request for Quotes and associated document package for additional details.” Notice text
- Confirm you have the latest SOW. Amendment 02 changed the Statement of Work, but the copy we reviewed shows no revision date. Ask the point of contact for the current version and check it against the RFQ before you price the job.“The purpose of this amendment is to update the Statement of Work attachment.” Notice text
Key terms
| Who can bid | Open to all; no set-asideYou need proof of ISO/IEC 17025 accreditation, and a CMMC Level 2 (self) status in SPRS to receive the drawings.Motor Calibrations RFQ.pdf, page 1 |
|---|---|
| Contract period | Base year plus four option yearsBase-year work must fall within 11 JAN 2027 to 20 JAN 2027. Base-year dates beyond that window are not stated.Motor Calibrations RFQ.pdf, page 4 |
| How they choose | Lowest priced, technically acceptable (LPTA)Lowest price wins among quotes that meet the technical specifications in the drawings.Motor Calibrations RFQ.pdf, page 2 |
| How to submit | By email to franklin.k.patton2.civ@us.navy.milThe quote must include price, delivery terms, point of contact, CAGE code and UEID.Motor Calibrations RFQ.pdf, page 8 |
| Contract type | Firm fixed price purchase orderCommercial services under FAR Part 12, with options.Notice text |
How to respond
- Check that a CMMC Level 2 (self) assessment and a NIST SP 800-171 DoD Assessment score under three years old are posted in SPRS. Send your CMMC Unique ID to Franklin Patton. How to request the drawings is not stated.
- Confirm your SAM registration, and have your CAGE code and UEID ready for the quote.
- Email the quote to franklin.k.patton2.civ@us.navy.mil by 1400 eastern time on Wednesday, 02 December 2026. Include price, delivery terms, point of contact name, phone and email, CAGE code, UEID, proof of ISO/IEC 17025 accreditation, and proof that all items are shipped from the US.
- File format, page limits and signature rules: Not stated.
Attached files
From SAM.gov. Download links open the original files.
- Motor Calibrations CDRLs_Redacted.pdfThe two data item forms for the calibration report and the calibration certificate you must deliver; distribution is limited to DoD and DoD contractors, and you need only read it. Read.
- Motor Calibrations Statement of Workpdf_Redacted.pdfThe statement of work covering the calibration method, reporting deadlines and security rules; you must read it, with nothing to fill in. Read.
- OTF Rotator Diagram_15-0048_MV.jpg Could not be read.
- Rotator Diagram_15-0048_DP.pdfA diagram of the APTF rotator showing a 1.95 inch stainless steel shaft; you must read it, with nothing to fill in. Read.
- Motor Calibrations RFQ.pdfThe request for quotes with line items, clauses, deadline and submission rules; you must read it and respond with a priced quote. Read.
Not stated in what we read
- Estimated value or budget for the work: Not stated.
- How to request the drawings, and whether SPRS status must be shown before you can get them.
- Start and end dates of the base year beyond the 11 to 20 January 2027 maintenance window.
- Date for questions to the point of contact: Not stated.
- Contents of the OTF rotator diagram, which we could not review.
- Whether the Statement of Work we reviewed is the version changed by Amendment 02.
Notice text
Amendment 02: The purpose of this amendment is to update the Statement of Work attachment. Amendment 01: The purpose of this amendment is to correct the due date on the SAM.gov synopsis to align with the RFQ attachment. The Naval Undersea Warfare Center Division Newport (NUWCDIVNPT) intends to award a Firm Fixed Price Type purchase order for Rotary Stepper Motor Calibrationsof the Acoustic Pressure Tank Facility (APTF) and Open Tank Facility (OTF). Please see the attached Request for Quotes and associated document package for additional details.
As published on SAM.gov.
Contacts
- Franklin Patton, franklin.k.patton2.civ@us.navy.mil, 4018326525
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 24, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 2, 2:00 PM ET7 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 541330, engineering services, soonest deadline first.
- National Aeronautics and Space AdministrationUniversal Robotics UR10e arm, NASA Ames, Moffett Field, CA
- Department of the NavySteam turbine governor system replacement, Philadelphia, PA
- Department of the ArmyGovernor control programming at Libby Dam, MT (cancelled)
- Department of the NavyEnvironmental planning for ship homeporting, Norfolk, VA
- Department of the ArmyIntent to Sole Source - Type-C A&E Services for Construction of SFS Facility
- Department of the NavyNetwork lab operation and sustainment for Canadian FMS
- Department of Veterans AffairsLockout/tagout procedures at 3 New York VA hospitals
- National Aeronautics and Space AdministrationProgram Analysis and Control (PAAC V) Bridge
Free · at most one email a morning
Get new notices from Department of the Navy by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Navy, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy