1. Opportunities
  2. Department of Defense
  3. Department of the Army
  4. W912QG27RA001

AH-64E aircraft maintenance support at Eastover, SC

The South Carolina Army National Guard wants a contractor to maintain AH-64E helicopters at Army Aviation Support Facility #1 at McEntire Joint National Guard Base, Eastover, SC.

Official title: SCARNG Regional Aviation Phase Support Center for AH-64E Aircraft Maintenance Support

Deadline
Dec 21, 10:00 AM ET
25 days left
Who can bid
8(a) firms
Firms in SBA's 8(a) program only · Who qualifies
Last time
$5.53M
Likely Tyonek Services Overhaul Facility-Stennis, LLC
Place
Eastover, SC
Buyer: W7NZ USPFO Activity SC ARNG

What they're buying

It is a firm fixed price contract with a 12-month base year starting 1 August 2027 and four 12-month option years, ending 31 July 2032, and only 8(a) firms can bid.

Top catches

8(a) firms only
“This acquisition is 8(a) competitive set aside.” Notice text

Only firms with an active SBA 8(a) certification can bid. If your company is not certified in the 8(a) program, do not spend time on this bid.

Conflicting file format rules
“All of the proposal files shall be compressed (zipped) into one file entitled proposal zip.” Solicitation - W912QG27RA001.pdf, page 71

The notice says each document must be its own file, while Section L says to zip all proposal files into one file called proposal zip. Ask the contracting officer which rule applies before the December 4 question deadline.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 4 of 6 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Field and sustainment-level maintenance on AH-64E aircraft at AASF #1, per AR 750-1, with aircraft returned to service on schedule.
  • Scheduled inspections: daily and monthly calendar inspections, and hourly PMS at 25, 50, 125, 250 and 500 hours, plus TBO projections.
  • Unscheduled maintenance: start troubleshooting within 30 minutes of notice and order parts within 2 hours during 0730 to 2000.
  • Compliance with special inspections and safety messages, with 100 percent FOD inspection and aircraft cleaning after work.
  • Staffing: a project manager with 5 years of aviation management, MDS-qualified mechanics or 2 years of experience, and inspectors with 2 years of experience.
  • Reports: quality control plan within 10 days of award, monthly PQDR and controlled exchange reports by the 15th, same-day accident notice, and service contract reporting by October 31.

Who did it before

$5.53M

on the contract that likely holds this work now: Tyonek Services Overhaul Facility-Stennis, LLC. It ends Jul 31, 2027.

Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.

What to watch for

  • 8(a) firms only. Only firms with an active SBA 8(a) certification can bid. If your company is not certified in the 8(a) program, do not spend time on this bid.
  • Conflicting file format rules. The notice says each document must be its own file, while Section L says to zip all proposal files into one file called proposal zip. Ask the contracting officer which rule applies before the December 4 question deadline.
  • Deadline time zone is unclear. The notice says Eastern Daylight Time in December, but December is Eastern Standard Time, and the SAM.gov record shows -05:00. Plan for every email to arrive by 9:00 AM Eastern Standard Time, which meets the deadline under either reading.“The proposals are due December 21, 2026 at 10:00AM Eastern Daylight Time by email” Notice text
  • SECRET clearance required. Your firm must hold or be eligible for a SECRET facility clearance, and staff must hold SECRET clearances. The notice asks for proof of clearance with the offer, and background checks can take two to six weeks, so confirm your status before you bid.“The contractor's employees performing work in support of this contract shall have been granted a SECRET security clearance from the Defense Industry Security Clearance Office.” PWS.pdf, page 17
  • Unclear who supplies aircraft parts. Section 3.3 says the Government furnishes aircraft parts, but Section 5.2 tells the contractor to order all necessary parts. Ask the contracting officer which parts you must price before you build your materials figures.“The government will furnish all special tools, test sets, aircraft parts, Petroleum, Oil, Liquids (POL) and maintenance equipment.” PWS.pdf, page 16
  • Pricing workbook shows errors. The pricing workbook shows #VALUE! errors in its subtotal, fringe and total cells, so it does not give a usable total. Rebuild the totals yourself from the wage rates in the Wage Determination file on SAM.gov before you submit Volume III.“SUBTOTAL LABOR | #VALUE! | #VALUE! | % | #VALUE!” Attachment 2 Pricing Model RAPSC AH-64E.xlsx

Key terms

Who can bid8(a) certified small businesses onlyNAICS 488190, size standard USD 40,000,000.00. Subcontracting is capped at 50 percent of service payments to firms that are not similarly situated.Notice text
Contract periodBase year 1 Aug 2027 to 31 Jul 2028, plus four 12-month options to 31 Jul 2032Option years are the Government's choice. Evaluation adds all option prices to the base price.Solicitation - W912QG27RA001.pdf, page 10
How they chooseBest value: technical first, past performance second, total price lastThe Government may award without discussions and may accept other than the lowest offer.Solicitation - W912QG27RA001.pdf, page 85
How to submitEmail both contracting contacts. Do not upload to SAM.gov.Kevin Esber and Kathy Coleman. Proposal file format is unclear; see catches.Notice text
Questions dueFriday, December 4, 2026, 10:00 AM Eastern Daylight TimeQuestions must be emailed. Phone questions are not accepted. Answers are posted as an amendment.Notice text
Contract typeFirm fixed pricePayment comes only after delivery is accepted and the invoice is processed in WAWF, which can take up to 30 days.Notice text

How to respond

  1. Confirm your SAM.gov registration is active and your DFARS representations are complete before you send anything. The notice says quotes from firms without an active registration cannot be considered.
  2. Fill in the SF 1449: company name, address and CAGE code in block 17a, blocks 30a to 30c, Section B unit and net prices for all items, and the total award price. Complete DFARS 252.204-7016 and 252.204-7017, and sign and return Amendment 0001 with your offer.
  3. Prepare Volume I technical (20 pages maximum), Volume II past performance (10 pages maximum), Volume III cost/price in Excel, and Volume IV solicitation, offer and certifications. Use Arial or Times New Roman at 12-point minimum, and settle the file format question with the contracting officer first.
  4. Email all files to kevin.j.esber.mil@army.mil and kathy.s.coleman2.civ@army.mil, not to SAM.gov. Every email for your offer must arrive by Monday, December 21, 2026, 10:00 AM Eastern Daylight Time, or the offer is late.
  5. Send questions by email by Friday, December 4, 2026, 10:00 AM Eastern Daylight Time. Send Part I of the past performance questionnaire to your references, and send the POC list to the contracting officer by the proposal due date.

Attached files

From SAM.gov. Download links open the original files.

  • Attachment 2 Pricing Model RAPSC AH-64E.xlsxThe Excel pricing template for labor, fringe, overhead, G&A and profit. You must fill it in and send it as Volume III, but the copy we read shows formula errors. Read.
  • Solicitation Amendment W912QG27RA0010001 SF 30.pdfAmendment 0001, which replaces the Word version of the PWS with a PDF. You must sign it and return it with your offer. Read.
  • Wage Determination.pdf Not read: over our length limit.
  • Solicitation - W912QG27RA001.pdfThe main solicitation, read in part (pages 1 to 52 and 67 to 90 only): it sets the forms, clauses, proposal volumes and evaluation rules. You must complete the SF 1449 and the representations, and read pages 53 to 66, which we could not review. Read in part (pages 1–52 and 67–90 of 90).
  • PWS.pdfThe performance work statement that defines the maintenance tasks, standards, staffing and security rules. You must read it to price the work, and you do not sign it. Read.
  • Attachment 1 Past Performance Questionnaire.docx Not read: over our length limit.

Not stated in what we read

  • Estimated contract value: Not stated. The pricing workbook has no usable total.
  • Wage rates: we could not review Wage Determination.pdf. You must read it before you price labor.
  • Past performance questionnaire: we could not review Attachment 1. You must read it before you contact references.
  • Aircraft scope: the notice says AH-64E, but PWS section 5.1 says AH-64D/E aircraft. Ask whether AH-64D work is included.
  • Phase-in pay: PWS 1.4.14 requires staff on board during a 60-day phase-in before the 1 August 2027 start, and the text does not say whether that time is paid.
  • Incumbent contractor, and whether a site visit or pre-bid meeting is planned: Not stated.

Notice text

Amendment 0001 is being issued to delete the PWS in word format and upload the PWS in PDF format due to inability of some to open the word document. 1. This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with FAR Part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation number W912QG27RA001 is issued as a request for proposal (RFP), for a firm fixed price contract regarding AH-64E maintenance support IAW Revolutionary FAR Overhaul (RFO) FAR part 12.

This acquisition is 8(a) competitive set aside. The NAICS Code for this requirement is 488190 with a size standard of $40 million. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. (i) The following is a list of the line-item numbers, quantities, and units of measure: CLIN 0001 QTY 12, months, AH64E Aircraft Maintenance Support Services (Base Year) at SCARNG Army Aviation Support Facility #1 (AASF1).

CLIN 1001 QTY 12, months, AH64E Aircraft Maintenance Support Services (Option Year 1) at SCARNG Army Aviation Support Facility #1 (AASF1). CLIN 2001 QTY 12, months, AH64E Aircraft Maintenance Support Services (Option Year 2) at SCARNG Army Aviation Support Facility #1 (AASF1). CLIN 3001 QTY 12, months, AH64E Aircraft Maintenance Support Services (Option Year 3) at SCARNG Army Aviation Support Facility #1 (AASF1). CLIN 4001 QTY 12, months, AH64E Aircraft Maintenance Support Services (Option Year 4) at SCARNG Army Aviation Support Facility #1 (AASF1). (ii) See SF 1449 for a list of solicitation provisions that apply to the acquisition. (iii) See SF1449 for a list of contract clauses that apply to the acquisition.

2. Response times. The proposals are due December 21, 2026 at 10:00AM Eastern Daylight Time by email to both kevin.j.esber.mil@army.mil and kathy.s.coleman2.civ@army.mil. 3. The period for acceptance of offers: Pricing shall remain valid until 1 August 2027. 4. This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2026-01, effective date 03/13/2026 and DFARS Change 05/07/2026.

Provisions and clauses incorporated by reference have the same force and effect as if they were given in full text. The full text of the Federal Acquisition Regulation (FAR) and Defense Federal Acquisition Regulations supplement (DFARS) can be accessed on the internet at http://acquisition.gov/. 5. In accordance with (IAW) Federal Acquisition Regulation (FAR) 4.1102 and RFO FAR Provision 52.204-7, all offerors shall be registered & active in SAM at the time of submission of an offer or quotation and shall continue to be registered & active until time of award, during performance, and through final payment of any contract.

Quotes received from Offerors whose registration at SAM.gov is not active cannot be considered. Offerors must also complete the DFARS certifications and representations in SAM.gov prior to submitting a quote. 6. Offerors shall prepare their quotes IAW RFO FAR Provision 52.212-1. The offeror shall quote all items. Partial proposals will not be accepted be accepted by the Government. 7. Evaluations of all proposals will be conducted by the Government in accordance with RFO FAR Provision 52.212-2.

8. Documents required to be submitted along with proposal: a. Offeror shall return all the documents as required in Addendum 1 to FAR Provision 52.212-1 b. Offerors shall complete and return RFO DFARS 252.204-7016 and RFO DFARS 252.204-7017 and the following Provisions or Clauses if they have not completed their annual representation and certifications electronically in SAM.gov IAW RFO FAR Provision 52.204-7 (Deviation 2026-O0038). c. SF 1449. When returning the solicitation (standard form 1449), please complete the following: 1) Company Information (Name & Address) and CAGE Code in Block 17a.

2) Blocks 30a., 30b., and 30c. 3) Pricing completed in Section B (unit price and NET amounts for ALL Items) and TOTAL Award Price. 4) Complete RFO DFARS 252.204-7016 and RFO DFARS 252.204-7017. d. Verification of Contractor's Secret Security Clearance. 9. The Government will not provide any payment in advance of the performance of this contract. Payment will not be made until all supplies have been delivered to the unit, the vendor has inputted a proper invoice into WAWF, the WAWF Acceptor verifies all supplies have been delivered and accepts the invoice.

This process can take up to 30 days, provided the contractor does not make any mistakes in WAWF. 10. The Government will not accept any offerors terms and conditions proposed by offerors. The only acceptable terms and conditions are those listed in this solicitation and the resultant award. 11. Submission of proposals. All proposals shall be emailed as a Word document or PDF files. No other formats are acceptable. Each document shall have its own file, do not combine documents together.

For example, the signed solicitation should be one file by itself, secret security clearance verification should be one file, etc. All submissions shall be emailed to the POCs listed. 12. Timeliness of proposals. IAW RFO FAR Provision 52.212-1(a), proposals shall be sent electronically so as to arrive in the Governments inbox by the designated time. The official time/date stamp for acceptance will be the date/time shown in the Government users Received column within Outlook or DoD Safe.

Be aware that if multiple emails are to be sent due to file sizes, all emails must arrive before the designated due date/time, or the quote will be considered late. The Government is not responsible for any delays caused by the email transmission process. Contractors are cautioned not to wait until the last minute to send their proposal to avoid issues. 13. Request for additional information. All requests for additional information beyond that contained within this solicitation shall be emailed to the designated POC NLT December 4 2026, 1000hrs Eastern Daylight Time.

All questions received shall be consolidated and posted with Governments responses for all to see as an amendment to the solicitation. Questions received by phone will not be accepted. 14. IAW RFO FAR 52.212-1(a)(6), all amendments issued to the solicitation must be signed and returned with the proposal. Offerors should monitor SAM.gov daily until the solicitation closes in case an amendment is posted that would impact the offeror’s original proposal.

15. IAW RFO FAR 9.104-4, prime contractors are responsible for determining the responsibility of their prospective subcontractors regarding debarred, ineligible or suspended firms. Any poor performance by the subcontractor shall be reflected upon the prime contractor through the following federal performance reporting systems: Supplier Performance Risk System (SPRS), Contractor Performance Assessment Reporting (CPARS) and Federal Awardee Performance and Integrity Information System (FAPIIS). **DO NOT upload quotes to SAM send them directly to both Point of Contacts (POCs) Kevin Esber at kevin.j.esber.mil@army.mil and Kathy S. Coleman at kathy.s.coleman2.civ@army.mil**

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

Who may hold this work now

Contracts at Department of the Army for the same kind of work (NAICS 488190, service code J016) in South Carolina that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.

ContractObligatedEndsState
Ah-64 Aircraft MaintenanceTyonek Services Overhaul Facility-Stennis, LLC · W912QG22C0003$5,527,327Jul 31, 2027in 8 monthsSC

Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.

History

  • Nov 24, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Army by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy