Ranger building materials at Shady Creek, Muscatine, IA
The U.S. Army Corps of Engineers wants framing lumber, roof trusses, sheathing, insulation, two garage doors, interior finishes and a dumpster for a new ranger facility at Shady Creek Recreation Area, Muscatine, IA.
Official title: Shady Creek Ranger Facility - Construction Supplies
- Deadline
- Nov 30, 2:00 PM CT
- 4 days left
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- IA
- Buyer: W07V Endist Rock Island
What they're buying
Materials must be delivered by 30 April 2027, and insulation and garage doors also need installation.
Top catches
“Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended” B08_W912EK27QA0040001.pdf, page 1
Amendment 0001, dated 24 November 2026, changed the Purchase Description and price sheet. Acknowledge it in your quote before the deadline, or your offer may be rejected.
“The hour and date specified for receipt of Offers” B08_W912EK27QA0040001.pdf, page 1
The amendment form lists both is extended and is not extended, and the text shows no box checked. Confirm the closing time with the contracting officer before you plan around 2:00 PM CT on 30 November. Likely, not stated outright.
Read by AI (Claude Haiku) on Nov 26, 2026 from the notice and 5 of 5 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Framing lumber in 8 to 20 ft lengths, grade #2 or better, plus LVL beams and pressure-treated 2x8 and 2x6 pieces.
- Roof trusses: 43 common and 2 gable, 30 ft span, 4/12 pitch, 24 in on center. Truss designs must be approved before fabrication.
- Huber Zip System or equivalent sheathing (92 wall, 104 roof and 55 half-inch wall panels), tape, roller, underlayment and hurricane ties.
- Insulation for 5,500 sq ft of walls and ceiling, installed by you. Mineral wool batt or dense pack cellulose only; spray foam and fiberglass batt are not acceptable.
- Two 10 ft x 10 ft insulated steel garage doors, installed with motorized openers and manufacturer product data. Also 54 and 33 sheetrock panels, 80 FRP panels, 4 windows and 3 steel doors.
- One 20-yard roll-off dumpster on site from two weeks after award to 30 April 2027, serviced up to four times.
Who supplied it lately
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Acknowledge Amendment 0001. Amendment 0001, dated 24 November 2026, changed the Purchase Description and price sheet. Acknowledge it in your quote before the deadline, or your offer may be rejected.
- Deadline may have changed. The amendment form lists both is extended and is not extended, and the text shows no box checked. Confirm the closing time with the contracting officer before you plan around 2:00 PM CT on 30 November.
- Installation is part of your price. Amendment 0001 says the work uses a mixture of Government and contractor labor. The Q&A says you must quote material and installation for insulation and garage doors, so price the labor too.“For the line item referenced, the KTR shall quote material AND installation.” W912EK27QA004_Question_and_Answer_2026Nov24.pdf, page 3
- Email-only submission, all items. Quotes go by email to two named staff, not a portal. Quote all four line items and send the SF1449, the completed price sheet and garage-door product data, or your quote will be incomplete.“The official method for quote submission is email to bradley.j.grothus@usace.army.mil and matthew.l.kindig@usace.army.mil by the time and date listed on page 1 of the SF1449.” W912EK27QA004_Question_and_Answer_2026Nov24.pdf, page 3
- Background checks before crew starts. Each worker and driver needs a background check done by a bonded third party within six months before notice to proceed, plus approval for the access list. Visitor passes are not required, but the security clause still applies, so start these checks early.“The contractor will submit background checks that have been conducted by a bonded” B08_W912EK27QA0040001.pdf, page 16
- No drawings before you bid. Structural drawings and insulation dimensions come only after award. Build your insulation and door prices on your own site measurements, since the specification makes the contractor verify all measurements.“Yes, drawings will be provided post-award.” W912EK27QA004_Question_and_Answer_2026Nov24.pdf, page 1
Key terms
| Who can bid | Small businesses only (total set-aside)NAICS 321911. The Q&A says the nonmanufacturer rule and subcontracting limits do not apply.SAM.gov record |
|---|---|
| Contract period | Start within 2 weeks of award; all work done by 30 April 2027Deliveries must be finished by that date. Trusses are delivered only when requested.B08_W912EK27QA0040001.pdf, page 5 |
| How to submit | Email your quote to Bradley Grothus and Matthew KindigDue by 2:00 PM CT, Monday, 30 November 2026. Email addresses are in the Q&A.W912EK27QA004_Question_and_Answer_2026Nov24.pdf, page 3 |
| Questions due | Closed: 2:00 PM CT, 23 November 2026The Government answered questions in the Q&A dated 24 November 2026.Notice text |
| Contract type | Firm fixed price, four line itemsLine items are supply of materials, insulation installed, garage doors installed, and dumpster service.B08_W912EK27QA004.pdf, page 11 |
| Site visit | Not required. You may visit on your own.The site is a public recreation area open year-round.W912EK27QA004_Question_and_Answer_2026Nov24.pdf, page 2 |
How to respond
- Acknowledge Amendment 0001 in your quote before the deadline.
- On SF1449 complete blocks 12, 17, 23, 24 and 30, with prices for all four line items (0001 to 0004), including installation for insulation and garage doors.
- Fill in the Detailed Price Breakdown Excel for CLIN 0001 and attach manufacturer product data for the garage doors.
- Email everything to bradley.j.grothus@usace.army.mil and matthew.l.kindig@usace.army.mil before 2:00 PM CT, Monday, 30 November 2026. File format and size limits: Not stated.
Attached files
From SAM.gov. Download links open the original files.
- B08_J-0002_Image_One_Shady_Creek_Rec_Area_Locator_Map.pdfA site map with a legend for foundation, footings and interior and exterior concrete; read only, nothing to sign. Read.
- B08_W912EK27QA0040001.pdfAmendment 0001, which revises the Purchase Description and price sheet; you must acknowledge it, and it overrides the original text where they differ. Read.
- B08_W912EK27QA004.pdfThe solicitation with the SF1449 cover, Purchase Description and clauses; you must complete blocks 12, 17, 23, 24 and 30 and list any foreign products on the Buy American certificate. Read.
- W912EK27QA004_Question_and_Answer_2026Nov24.pdfGovernment answers to bidder questions dated 24 November 2026; they change labor, delivery and submission terms, so read them before you price. Read.
- B08_J-0001_Detailed_Price_Breakdown_CLIN_0001_Rev_2026Nov24.xlsxThe price sheet for the construction materials; you must fill in every unit price and submit it, and some rows say to verify details with the Government before ordering. Read.
Not stated in what we read
- Estimated contract value: Not stated.
- Award basis, such as lowest price or best value: Not stated.
- Whether Amendment 0001 extended the 30 November 2026 deadline: unclear from the text.
- Quote file format, file size and page limits: Not stated.
- Payment terms and when payment is made: Not stated.
- Option years or price escalation: Not stated.
Notice text
The U.S. Army Corps of Engineers, Rock Island District, Mississippi River Project Office, has a requirement for the purchase and delivery of various construction supplies and services for the Shady Creek Ranger Facility. Technical inquiries are due no later than 2:00 PM CT on 23 November 2026. Quotes are due by 2:00 PM CT on 30 November 2026. See the solicitation for complete quote submission requirements and instructions. __________________________________________________________________________ Solicitation Amendment 0001 incorporates revisions to the Purchase Description and Attachment J-0001 Detailed Price Breakdown - CLIN 0001. Additionally, the Government's responses to technical inquiries and questions are provided at this time.
As published on SAM.gov.
Contacts
- Bradley J. Grothus, bradley.j.grothus@usace.army.mil
- Matthew L. Kindig, matthew.l.kindig@usace.army.mil
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 26, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Nov 30, 2:00 PM CT4 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportFree · at most one email a morning
Get new notices from Department of the Army by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy