1. Opportunities
  2. Department of Defense
  3. Department of the Navy
  4. N6817127QN013

Ship repairs on USS Lewis B. Puller in Malaga, Spain

The Navy wants a firm fixed price quote to repair the USS Lewis B. Puller (ESB 3) in Malaga, Spain.

Official title: Ship Repair

Deadline
Nov 27, 1:00 PM UTC+01:00
2 days left
Who can bid
Any business
Registered in SAM.gov · How to register
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Malaga, ESP
Buyer: NAVSUP FLC Sigonella Naples Office

What they're buying

The work is three reefer container installs, two walk-in reefer door replacements, one aircraft electrical service station replacement, one dishwasher replacement, four safe replacements, and a scaffold for ship's force use, all between 5 and 22 December 2026.

Top catches

Deadline is Central European Time
“Quotes must be received no later than (NLT) Friday 27 November 2026 at 13:00 Central European Time.” 4.02 N6817127QN013.pdf, page 30

Your quote must arrive by 13:00 Central European Time on Friday 27 November 2026. Do not use your local time zone when you plan the send.

Reference deadline comes first
“References shall be requested via e-mail to the emails listed above no later than 25 November 2026 at 12: 00 (CEST).” 4.02 N6817127QN013.pdf, page 30

To get the technical references you must email a signed NDA by 25 Nov 2026 at 12:00 CEST. The notice uses CEST here and CET for the quote, so confirm the exact time with the contracting officer before you rely on it.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 5 of 6 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Install three 20-foot reefer containers on the A1 level mission deck, with an operational test and a joint inspection.
  • Replace two walk-in cooler and freezer doors in the chilled food and freezer storerooms, with four operational cycles and new label plates.
  • Remove and replace two aircraft electrical service stations on the flight deck, with power-up and load bank tests by an authorized OEM service provider.
  • Remove and replace one dishwasher in the scullery, with tag-out, welding and NDT inspections, and operational and tightness tests.
  • Remove and replace four steel four-drawer safes in four spaces on A8 level, with NDT and operational tests.
  • Provide and set up a steel scaffold about 20 ft high and 10 ft wide for ship's force use, rated for 750 pounds, for the whole contract period.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Deadline is Central European Time. Your quote must arrive by 13:00 Central European Time on Friday 27 November 2026. Do not use your local time zone when you plan the send.
  • Reference deadline comes first. To get the technical references you must email a signed NDA by 25 Nov 2026 at 12:00 CEST. The notice uses CEST here and CET for the quote, so confirm the exact time with the contracting officer before you rely on it.
  • Technical paperwork can disqualify you. Under LPTA, a quote rated unacceptable on technical capability is removed regardless of price. Mark the Attachment J-3 items and attach the documents it requires, including quality manual, certifications, inspector lists and a draft Test and Inspection Plan.“will render the entire quote unacceptable and ineligible for award” 4.02 N6817127QN013.pdf, page 32
  • Off the ship within 24 hours. The work is on a 24-hour tether, so you must be ready to remove temporary services and leave the ship within 24 hours of notice. Plan crews, equipment and demobilization with that in mind.“the contractor should be able to remove all temporary services and be off the ship within 24 hours after notification.” 4.02 N6817127QN013.pdf, page 30
  • Drawings are export-controlled. The work package is marked as ITAR export-controlled. Do not give it to foreign persons, which may include staff or subcontractors in Spain, without proper authorization. Check who will see it before you request or sign the NDA.“This information must not be transferred to a foreign person/entity without proper authorization of the U.S.” 4.02b J-2 Composite Work Package.pdf, page 6
  • Checklist dates do not match. The Attachment J-3 header shows the period as 10/20/26 to 12/20/26, but Section F says 5 to 22 December 2026. Ask the contracting officer which dates apply before you plan crews and materials.“10/20/26 12/20/26” 4.02c J-3. Contract Qualification Checklist.pdf, page 1

Key terms

Who can bidOpen to all businesses; no set-asideContractors must be registered in SAM to bid, according to Section L.SAM.gov record
Contract period5 Dec 2026 to 22 Dec 2026Short window of about 18 days on site.4.02 N6817127QN013.pdf, page 8
How they chooseLowest priced technically acceptable (LPTA)A quote must first pass the technical review before price counts.4.02 N6817127QN013.pdf, page 32
Contract typeFirm fixed price, one line item (CLIN 0001)Section A calls the contract non-commercial, while the form is for commercial products.4.02 N6817127QN013.pdf, page 3

How to respond

  1. Email one of the listed contacts (Joseph Norcross, Julian R. Thornton or William Havens) by 25 Nov 2026 at 12:00 (CEST) and request the references, attaching the signed Attachment S-1 NDA.
  2. Review the references and restricted documents only within the NDA limits. Do not share them with anyone who is not authorized.
  3. Fill in the Attachment J-1 price workbook for all six work items and the travel tab, and make sure the total fits the single CLIN 0001 price. Also complete the SF 18 blocks 12 to 16 and Section K representations and certifications.
  4. Mark the Attachment J-3 technical items, attach the required documents, and send the full quote by 27 Nov 2026 at 13:00 Central European Time. Where to send and in what format: Not stated.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Estimated value and available funding: Not stated.
  • How and where to submit the quote (email, portal or mail): Not stated.
  • Which equipment the ship supplies and which you buy: the containers are said to be provided by the ship, but doors, a dishwasher and safes are also listed as government material and the price form has a materials column.
  • Attachment J-4 (Contract Qualification TIP Example) is a scanned image that could not be reviewed, so you must read it yourself. The NAVSEA Standard Items are on a website and were not attached, so you must read them too.
  • Liquidated damages per day: the amount is left blank in clause 52.211-11.
  • Insurance and liability limits and foreign wage-rate adjustment terms: clauses 252.217-7012 and 252.216-7003 are listed by title only, with no amounts or terms in the text.

Notice text

Ship Repair located in Malaga, Spain for U.S. Navy Ship.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 19, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Navy by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Navy, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy