F-15 display processor repair, Warner Robins, GA
The Air Force wants a five-year, firm fixed price indefinite delivery contract to repair F-15 Advanced Display Core Processors (ADCP) and Digital Map Processors (DMP), plus their cartridges, with all parts and labor.
Official title: Solicitation Notice: Repair of the F-15 Digital Mapping System (DMS) Advanced Display Core Processor (ADCP)
- Deadline
- Feb 26, 2027, 4:00 PM ET
- 93 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Warner Robins, GA
- Buyer: FA8538 AFSC Pzaab
What they're buying
Best estimates are 100 ADCP, 400 DMP and 250 cartridges, and the notice names Honeywell as the only known source.
Top catches
“Response deadline: 2027-02-26T16:00:00-05:00” SAM.gov record
The SAM record gives Friday 26 February 2027 at 4:00 PM -05:00. The notice text and the solicitation cover give Monday 04 January 2027 at 4:00 PM EST, so ask the contracting officer in writing which date is correct.
“This PDF Document has been protected.” Attachment 1 - Performance Work Statement.pdf, page 1
The Performance Work Statement is password-protected, so the main requirements could not be read. Get an unlocked copy from the contracting officer before you price any line.
Read by AI (Claude Haiku) on Nov 20, 2026 from the notice and 4 of 10 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Repair and test of 100 ADCPs (NSN 1270-01-562-6566, P/N 8525470-951) over five years, with all parts and labor.
- Repair of 400 DMPs (NSN 5895-01-444-5142, P/N 8520305-911).
- Repair of 150 mission cartridges (P/N 8520380-903) and 100 theatre cartridges (P/N 8520390-903 and 8520390-904, 50 each).
- Priced surge options and sanitization of mission cartridges and ADCPs, as listed in the solicitation schedule.
- Return each repaired item 21 calendar days after the Government receives the asset. Some lines allow only 10 work days.
- Monthly status reports within 30 days of award, then every 30 days, plus other plans in the data list, such as a risk management package due 60 days after award.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Two different closing dates. The SAM record gives Friday 26 February 2027 at 4:00 PM -05:00. The notice text and the solicitation cover give Monday 04 January 2027 at 4:00 PM EST, so ask the contracting officer in writing which date is correct.
- Main work statement is locked. The Performance Work Statement is password-protected, so the main requirements could not be read. Get an unlocked copy from the contracting officer before you price any line.
- Only one source named. The Government says Honeywell is the only known source, and it owns no production technical data or test equipment. If you are not Honeywell, ask whether you can obtain the data before you spend time on a proposal.“The Government does not own any production level technical data or specialized test equipment in support of this requirement.” Notice text
- CMMC Level 2 needed before award. You need a current CMMC Level 2 (Self) status in SPRS before award, and you must list your CMMC unique identifiers in the proposal. Without this, you cannot be awarded the contract.“This CMMC level, or higher (see 32 CFR part 170), is required prior to award” FA853827RB004.pdf, page 106
- Surge plan due with proposal. The initial surge production plan is due with your proposal, not after award. It must cover maximum production rate, items, impact on other government contracts and added labor, so start it now.“Surge Production Plan initial submission is due as a part of the contractor's proposal” Attachment 3 - Contract Data Requirements List.pdf, page 4
- Very short delivery window. Repaired items are due 21 days after the Government receives the asset. Some lines allow only 10 work days, so check your repair time and spare parts before you commit to these dates.“required delivery schedule is 21 days after receipt of asset” Notice text
Key terms
| Who can bid | Honeywell named as only known source; set-aside not statedThe notice does not state a small business set-aside or size status for this buy.Notice text |
|---|---|
| Contract period | One 12-month basic year plus four one-year ordering periodsFive years in total under an indefinite delivery contract.Notice text |
| How they choose | Negotiated, other than full and open competitionNo evaluation factors appear in the text we could read. Section M was not provided.Notice text |
| Contract type | Firm fixed price, indefinite deliveryThe type of contract clause in Section L is left blank in the copy provided.Notice text |
How to respond
- Ask Madison Norris at Madison.Norris@us.af.mil for an unlocked Performance Work Statement and the full solicitation before you price the work.
- Ask in writing which closing date applies, 04 January 2027 or 26 February 2027, and whether email or mail delivery is accepted, since the notice does not say.
- Send your proposal, with a cost breakdown, to the issuing office at FA8538 AFSC PZAAB, 235 Byron St, Bldg 300, Ste 19A, Robins AFB, GA 31098-1670.
- Include your initial surge production plan and your CMMC unique identifiers from SPRS in the proposal.
- Complete the Section K representations and certifications and sign the offer blocks on the solicitation form.
Attached files
From SAM.gov. Download links open the original files.
- Attachment 8 - DFARS Proposal Adequacy Checklist.pdf Not read: over our length limit.
- Attachment 2 - Quality Assurance Surveillance Plan.pdf Not read: over our length limit.
- Attachment 6 - Government Furnished Property Attachment.pdfLists property tied to this repair. Its quantities differ from the notice text, so read it in full and ask which figures apply. Read in part.
- FA853827RB004.pdfThe solicitation form with the item schedule, clauses and representations. Read it, complete the offer blocks, and sign the offer. Read in part.
- FA8538-27-R-B004-0001.pdf Not read: over our length limit.
- Attachment 7 - Wage Determination.pdf Not read: over our length limit.
- Attachment 4 - Packaging Requirements.pdf Scanned image, not read.
- Attachment 1 - Performance Work Statement.pdfThe main statement of work. The copy provided is password-protected, so it could not be read. You must get an unlocked copy and read it in full before pricing. Read in part.
- Attachment 5 - Transportation Report.pdf Scanned image, not read.
- Attachment 3 - Contract Data Requirements List.pdfLists the reports and plans you must deliver after award, with due dates and submission routes. Read it and price these deliverables. Read in part.
Not stated in what we read
- Estimated dollar value of the contract. The notice gives quantities but no total.
- Set-aside status, and the basis for award and evaluation factors, since Section M was not provided.
- Which quantities are final. The GFP list shows 170 ADCP and 480 DMP, while the notice asks for 100 and 400.
- Submission method and the deadline for questions. The text states neither.
- Attachments we could not review: Wage Determination, Packaging Requirements, Transportation Report, Quality Assurance Surveillance Plan and DFARS Proposal Adequacy Checklist. You must read them on SAM.gov before pricing.
- Price escalation, payment terms and option pricing over the five years.
Notice text
Title: Solicitation - Repair of the F-15 Digital Mapping System (DMS) Advanced Display Core Processor (ADCP) NAICS: 811210 PSC/FSC: J016 Notice ID: FA8538-27-R-B004 The 409th Supply Chain Management Squadron (SCMS) / GUMA anticipates a five-year, Firm Fixed Price (FFP) Indefinite Delivery Contract (IDC) for the repair of the F-15 Advanced Display Core Processor (ADCP), NSN: 1270-01-562-6566FX, PN: 8525470-951 and Digital Map Processor (DMP), NSN: 5895-01-444-5142FX, PN: 8520305-911 to provide all the necessary parts and labor to test and repair the ADCP/DMP. The repair of the ADCP/ DMP is performed as a Direct Sales Partnership Agreement (DSPA) with the Government (WR-ALC/EMXG), supporting requirements generated for the Air Force Sustainment Center (AFSC), 638th Supply Chain Management Group (SCMG), 409th Supply Chain Management Squadron (SCMS)/GUMCA.The anticipated IDC will include one (1) 12-month basic year and four (4) one-year ordering periods.
The proposed contract action is for services for which the Government intends to solicit and negotiate using Other Than Full and Open Competition (OTF&OC) procedures in accordance with RFO Part 6.103-1, Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements. The Government does not own any production level technical data or specialized test equipment in support of this requirement. As a result, Honeywell International Inc. (CAGE 07187), is the only known source with adequate knowledge of the F-15 Digital Mapping System (DMS) Advanced Display Core Processor (ADCP) performance requirements and possession of the required technical data and capabilities needed to repair this item and ensure compatibility of the equipment.
The Government's required delivery schedule is 21 days after receipt of asset. The quantities shown below represent the Best Estimated Quantities for this effort. NSN: 1270-01-562-6566FX Part Number: 8525470-951 Noun: Advanced Display Core Processor (ADCP) RMC/ RMSC: R3/R Quantity: 100 EA NSN: 5895-01-444-5142FX Part Number: 8520305-911 Noun: Digital Map Processor (DMP) RMC/ RMSC: R3/R Quantity: 400 EA NSN: 7045-01-445-0383FX Part Number: 8520380-903 Noun: Mission Cartridge (MC) RMC/ RMSC: R3/R Quantity: 150 EA NSN: 7045-01-444-6971FX Part Number: 8520390-903 Noun: Theatre Cartridge (TC) RMC/ RMSC: R3/R Quantity: 50 EA NSN: 7045-01-500-5493FX Part Number: 8520390-904 Noun: Theatre Cartridge (TC) RMC/ RMSC: R3/R Quantity: 50 EA Point of Contact: Madison Norris at Madison.Norris@us.af.mil Completed Request for Proposal responses and documents are due 4:00 PM EST, 04 January 2027
As published on SAM.gov.
Contacts
- Madison Norris, madison.norris@us.af.mil
- Joseph Jones, joseph.jones.81@us.af.mil
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 20, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Feb 26, 2027, 4:00 PM ET93 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 811210, electronic and precision equipment repair and maintenance, soonest deadline first.
- Department of Veterans AffairsNeptune rover maintenance at Bay Pines and Cape Coral, FL
- National Institutes of HealthFlow cytometer service and repairs, Bethesda, MD
- Indian Health ServiceBody plethysmograph maintenance and repair, Lawton, OK
- Department of Veterans AffairsJ061 UPS and Battery Maintenance and Testing – Nashville VA Medical Center
- Department of Veterans AffairsNotice of Intent to Sole Source Rauland Nurse Call System Services
- National Institutes of HealthPreventive maintenance for two TracerLab units, Bethesda, MD
- US Secret ServiceNotice to Intent to Sole Source-Laboratory Sterilizers Repair Services
- Defense Health Agency (DHA)Notice of Intent to Limit Sources-Steris Maintenance
Free · at most one email a morning
Get new notices from Department of the Air Force by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Air Force, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy