Sources Sought for FY26 Atlantic Intracoastal Waterway Maintenance Dredging ????????? Select Sites
Open, 4 days left
- Deadline
- Nov 20, 11:00 AM ET
- Notice type
- Sources Sought
- Set-aside
- Not stated
- Industry
- Other Heavy and Civil Engineering ConstructionNAICS 237990, Construction
- Place of performance
- Not stated
- Buying office
- W074 Endist SavannahOffice W912HN, Department of the Army
- Solicitation number
- W912HN27S5000
- Product or service code
- Z1KF
- Posted
- Oct 19, 2026
- Source
- SAM.govVersion 1, last change seen Nov 16, 2026, 4:30 AM UTC
Notice text
THIS IS A SOURCES SOUGHT ONLY. The Savannah District Corps of Engineers is requesting information regarding the market capabilities of potential contractors that can perform maintenance and unclassified dredging on the Atlantic Intracoastal Waterway (AIWW) sections of waterway Hell Gate and Florida Passage in Chatham County Georgia and Fields Cut in Jasper County South Carolina. This request does not obligate the Government in any way to post a Request for Proposal or award a contract. Information received will be considered for the purpose of market research and determining how to best move forward with the procurement. Applicable NAICS code is 237990 with a size standard of $45.0M. The potential magnitude for this requirement is estimated to be between $5,000,000 and $10,000,000. The FY26 Atlantic Intracoastal Waterway (AIWW) maintenance dredging contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging and incidental related work. This contract is traditionally performed with a hydraulic cutterhead dredge, but other methods will be considered. The duration is expected to be five months (165 days) from Notice to Proceed. The Savannah Districts area of responsibility (AOR) of the federally maintained channel in the Atlantic Intracoastal Waterway begins in Port Royal Sound, South Carolina and ends in Cumberland Sound, Georgia. The shallow draft federally maintained channel is twelve (12) feet deep MLLW with widths from ninety (90) feet in land cuts and one hundred fifty (150) feet in natural waterways. Savannah Districts FY26 AIWW maintenance dredging work is located within the state of Georgia (Chatham County) and in the state of South Carolina (Jasper County). The Hell Gate section of waterway is to be dredged to authorized width of 150 feet and depth of 12 feet. The work also includes options to dredge the Florida Passage and the Fields Cut sections of the waterway to authorized width of 150 feet and depth of 12 feet. Approximately two hundred thousand (200,000) cubic yards of maintenance material is anticipated to be removed from the Hell Gate section of the federally maintained channel in the waterway. Approximately fifteen thousand (15,000) cubic yards of maintenance material is anticipated to be removed from the Florida Passage section of the federally maintained channel in the waterway. Approximately fifty thousand (50,000) cubic yards of maintenance material is anticipated to be removed from the Fields Cut section of the federally maintained channel in the waterway. Sediment dredged from Hell Gate may be pumped approximately four (4) miles to a Beneficial Use placement site in tidal flats east of Ogeechee Bar. Sediment dredged from Florida Passage may be pumped approximately nine (9) miles to the Beneficial Use placement site in the tidal flats east of Ogeechee Bar. Sediment dredged from Fields Cut will be pumped to the adjacent confined upland containment area DMCA 14B. The attached Request for Information should be filled out and loaded via PIEE before the sources sought close on 20 November 2026, 11:00 a.m. (EST). Any questions should be emailed to the Contract Specialist, Rohan Bryan at Rohan.A.Bryan@usace.army.mil or Contracting Officer, Preston Jones at Preston.E.Jones@usace.army.mil.
As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.
Contacts
- Rohan Bryan, rohan.a.bryan@usace.army.mil, (912) 652-5030
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 16, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Other open notices in other heavy and civil engineering construction
| Notice | Set-aside | Place | Due |
|---|---|---|---|
| USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CADepartment of the Army | Not stated | Not stated | Nov 17Due tomorrow |
| Yaquina River Clamshell Dredging 2027Department of the Army, sources sought | Not stated | Not stated | Nov 17Due tomorrow |
| Kona Low Storm Damage RepairsFederal Emergency Management Agency | Small business | Lahaina, HI | Nov 17Due tomorrow |
| Tampa Harbor Improvements Industry DayDepartment of the Army, special notice | Not stated | Tampa, FL | Nov 182 days left |
| Fort Sill NC Gravesite Expansion and FCA Deficiencies 920CM3006Department of Veterans Affairs | SDVOSB | Elgin, OK | Nov 182 days left |
| KC-46A ADAL Apron and Hydrant Fueling PitsDepartment of the Army | Not stated | Not stated | Nov 182 days left |
| Y FAIR Route 3 - 96-inch CMP Replacement ProjectBureau of Indian Affairs | ISBEE | Not stated | Nov 182 days left |
| East Bear Creek Pumping Plant and Pipeline ModerniDepartmental Offices, sources sought | Not stated | Not stated | Nov 182 days left |
Get new notices from Department of the Army by email
Each morning we send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.