1. Opportunities
  2. National Aeronautics and Space Administration
  3. 80GRC027R0005

Lunar fission reactor design and testing, Cleveland, OH

NASA Glenn is buying a multiple-award contract for space nuclear systems, with the first task order for the 20 kWe LR-1 lunar fission reactor: a preliminary design, a non-nuclear engineering test unit, and radiation testing over about 18 months.

Official title: Space Power and Reactor Capabilities (SPARC) - Final Request for Proposals (RFP)

Deadline
Dec 21, 5:00 PM ET
26 days left
Who can bid
Any business
Registered in SAM.gov · How to register
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Cleveland, OH
Buyer: NASA Glenn Research Center

What they're buying

Every offeror must also submit a proposal on the LR-1 sample task order to be considered for the contract.

Top catches

Sample task order proposal required
“However, all offerors are required to submit a proposal addressing the ASTO in order to be evaluated for the award of a SPARC contract.” SPARC Final RFP- 80GRC027R0005.pdf, page 82

You cannot be considered for the SPARC contract unless you also propose on the LR-1 Phase 1 sample task order. Plan a full technical proposal for that work, not only the contract paperwork.

GTA requests due December 3
“The Offeror must initiate a GTA request, in writing, no later than 18 calendar days prior to the proposal deadline.” Att J.2-11 - GTA Instructions.pdf, page 3

If you want any Government facility or resource, the written request must start at least 18 calendar days before the proposal deadline, which is likely December 3, 2026. Later requests will not be considered, and this cutoff falls before the December 4 question deadline. Likely, not stated outright.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 9 of 18 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Design a 20 kWe lunar fission power system to preliminary design review level, using a HALEU reactor and closed Brayton power conversion.
  • Build and test a non-nuclear engineering test unit in thermal-vacuum that covers reactor heat transport, power conversion, heat rejection, and power management and distribution.
  • Run component-level radiation exposure tests for both reactor-induced and lunar surface radiation.
  • Deliver the test hardware: electrically heated reactor simulator, Brayton power conversion unit(s), heat rejection radiators and fluid loops, PMAD equipment with load simulators, ETU software, and test support equipment.
  • Meet the electrical interface of 2700 to 3300 VRMS at 1000 Hz, at least 5 years of maintenance-free operation, and no more than 15 metric tons of mass.
  • Hold weekly virtual status meetings, monthly reports, a system requirements review, test readiness reviews, and a preliminary design review at NASA Glenn around month 17.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Sample task order proposal required. You cannot be considered for the SPARC contract unless you also propose on the LR-1 Phase 1 sample task order. Plan a full technical proposal for that work, not only the contract paperwork.
  • GTA requests due December 3. If you want any Government facility or resource, the written request must start at least 18 calendar days before the proposal deadline, which is likely December 3, 2026. Later requests will not be considered, and this cutoff falls before the December 4 question deadline.
  • You must obtain the nuclear fuel. The reactor uses High-Assay Low-Enriched Uranium (HALEU). NASA says the contractor must apply through DOE to get it, which could add schedule and cost risk. Include this in your schedule and risk plan.“The contractor is responsible for submitting the proper application through DOE to acquire the HALEU fuel.” Att J.2-05 - LR-1 Phase 1 ASTO SOW.pdf, page 7
  • Waiver of claims for Government resources. If you use a Government facility or resource through a GTA, you give up claims against the Government for injury, death, or property loss, even from its negligence, except willful misconduct. You must also make your subcontractors agree. Weigh this before requesting any GTA.“By choosing to use the Government in support of TO performance, Contractor hereby waives any claims against the Government” SPARC Final RFP- 80GRC027R0005.pdf, page 16
  • Box uploads limited to citizens. Only US citizens, protected individuals, or lawful permanent residents may share with NASA through Box. Confirm that the person who will upload qualifies, and get the Contracting Officer's folder invitation early.“Only US Citizens, Protected Individuals, or Lawful Permanent Residents can share with NASA via this process.” Att J.2-01 - Instructions for Setting up a Box Account.pdf, page 2
  • Cleveland listed but work is offsite. SAM.gov lists Cleveland, OH, which is the NASA Glenn address. The RFP says most work happens at contractor and subcontractor facilities, so price your own space, staff, and test sites, and ask the Contracting Officer to confirm if unsure.“The contract will primarily be performed offsite at the Contractor’s facilities.” SPARC RFP Cover Letter.pdf, page 2

Key terms

Who can bidOpen to all businesses; no set-asideNAICS 541715 with a small business size standard of 1,000 employees. SAM.gov shows no set-aside.SPARC RFP Cover Letter.pdf, page 1
Contract periodTask orders estimated April 15, 2027 to October 14, 2028The IDIQ ordering period runs to December 31, 2031. Dates are estimates and may change with the award date.SPARC RFP Cover Letter.pdf, page 1
How they chooseMission suitability first, then past performance, then price (sample task order)Price is evaluated only for the sample task order. Mission suitability carries 1,000 points.SPARC Final RFP- 80GRC027R0005.pdf, page 81
How to submitUpload to NASA's Box (EFSS Box) folderYou need a Box account and a folder shared by the Contracting Officer first.SPARC RFP Cover Letter.pdf, page 3
Questions dueDecember 4, 2026, in writing to the Contracting OfficerSend questions to Noah Garrison at noah.s.garrison@nasa.gov. Contact with other NASA staff is restricted during the blackout.SPARC RFP Cover Letter.pdf, page 3
Estimated valueIDIQ ceiling $350,000,000; Phase 1 value not statedThe IDIQ minimum is $30,000. No value is given for the LR-1 Phase 1 task order.SPARC Final RFP- 80GRC027R0005.pdf, page 2
Contract typeFirm-fixed-price for LR-1 Phase 1The IDIQ may issue firm-fixed-price, fixed-price incentive, cost-plus-fixed-fee, and cost-plus-incentive-fee task orders.SPARC RFP Cover Letter.pdf, page 1

How to respond

  1. Send written questions to Noah Garrison, Contracting Officer, at noah.s.garrison@nasa.gov on or before December 4, 2026.
  2. If you need Government resources, send your written GTA request to the NASA Glenn GTA point of contact, Andrew Presby (andrew.l.presby@nasa.gov), no later than December 3, 2026, using Sections I and II of the GTA form (Attachment J.1-5).
  3. Set up a Box account now, then email the Contracting Officer the account address so the folder can be created and shared before you upload.
  4. Upload proposal files to the shared Box folder by 5:00 PM ET on Monday, December 21, 2026. Upload files one at a time, because entire folders cannot be dragged into the shared folder.
  5. Include a draft OCI plan, the sample task order proposal, the Excel price volume (Attachment J.2-10), and the accounting system survey (Attachment J.2-7) with your proposal. Ask references to send Past Performance Questionnaires directly to the Contracting Officer before the due date. Proposal format and page limits: Not stated in the text we reviewed.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Proposal format, page limits, and volume layout are in Section L, which was not in the text we reviewed.
  • Estimated value of the LR-1 Phase 1 task order is not stated.
  • The SOW points to an attached CDRL with the full deliverable list, but no CDRL appears in the attachment list.
  • Where the engineering test unit and radiation tests will run, and whether any Government facility would be used, is not stated.
  • Insurance, bonding, facility clearance, and security clearance requirements are not stated in the text we reviewed.
  • Payment terms and milestones for the LR-1 Phase 1 task order are not stated in the text we reviewed.

Notice text

The Space Power and Reactor Capabilities (SPARC) Final Request for Proposals (RFP) is hereby issued. Potential offerors are encouraged to review all attached documents beginning with the attachment titled SPARC RFP Cover Letter. Based on feedback from potential offerors and interested parties, several changes have been incorporated since the issuance of the Draft RFP. Potential offerors should review all documentation thoroughly to ensure a complete understanding of solicitation. A link to the Draft RFP is provided below for potential offerors to review Industry Day and Draft RFP documentation. All communications regarding this solicitation, other than those related to the establishment of Government Task Agreements (GTAs), must be directed to the identified Contracting Officer.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 21, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from National Aeronautics and Space Administration by email

Each morning we'll send the new solicitations and sources-sought notices from National Aeronautics and Space Administration, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy