Beam position monitors for SPEAR ring, Menlo Park, CA

SLAC National Accelerator Laboratory in Menlo Park, CA wants 104 beam position monitors with fast orbit feedback and fast orbit interlock systems for its SPEAR storage ring, plus onsite installation, training and commissioning visits.

Official title: SPEAR Beam Position Monitors (BPMs)

Deadline
Dec 4, 5:00 PM PT
9 days left
Who can bid
Any business
Registered in SAM.gov · How to register
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Menlo Park, CA
Buyer: Slac Natl Accel Lab -DOE Contractor

What they're buying

Delivery is due 7 and 8 months after award, and you must email your proposal by Friday, December 4, 2026 at 5:00 PM PT.

Top catches

Email only, strict 5 PM cutoff
“Proposals and Modifications thereof received by email designated in the Request for Proposals after the due date and time will not be considered.” L_(Instructions to Offeror).pdf, page 6

Proposals go only by email to Astrid Torres. A proposal received after 5:00 PM PT on December 4 will not be considered, so send yours early and keep proof of the send time.

Every listed form must be returned
“Must complete and return all documentation mentioned in the cover letter.” Notice text

Missing or unsigned forms, including Section A, Section B, Section K, the Buy American certificate, the IIPP form, the insurance certificate, the small business plan and the Dun and Bradstreet report, can make your offer fail. The IIPP form is also needed before any notice to proceed.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 25 of 26 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Supply 104 beam position monitors (BPMs). 56 are due within 7 months of award; the rest, with the fast orbit feedback and interlock systems, are due within 8 months.
  • Supply one fast orbit interlock system and one fast orbit feedback system, both within 8 months.
  • Provide EPICS input control and data streams: turn-by-turn, 10 kHz and 10 Hz data, with the EPICS IOCs supplied by you.
  • Meet orbit stability and drift limits in SOW Table 5, including 1 µm turn-by-turn rms.
  • Provide a factory acceptance test procedure and test results for each BPM crate, then onsite installation, training and commissioning visits.
  • Provide a warranty of at least 2 years, with software source code for the interlock and feedback code.

Who supplied it lately

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Email only, strict 5 PM cutoff. Proposals go only by email to Astrid Torres. A proposal received after 5:00 PM PT on December 4 will not be considered, so send yours early and keep proof of the send time.
  • Every listed form must be returned. Missing or unsigned forms, including Section A, Section B, Section K, the Buy American certificate, the IIPP form, the insurance certificate, the small business plan and the Dun and Bradstreet report, can make your offer fail. The IIPP form is also needed before any notice to proceed.
  • Light source delivery history required. You must show that you have delivered a similar BPM to a light source accelerator facility. Without that history, or any performance documentation, the offer is rated Technically Unacceptable. If you cannot show it, do not bid.“Offerors with no relevant past or present performance history shall receive the rating of "Technically Unacceptable".” L_(Instructions to Offeror).pdf, page 4
  • Options count toward your price. The award uses a lowest price rule among technically acceptable offers. SLAC adds the two optional support visits to your total even if it never exercises them, so price those visits at your true cost.“SLAC will evaluate Offers for Award purposes by adding the Total Subcontract Option(s) Value to the Total Subcontract Value (Base + Options).” B_(Supplies_or_Services_and_Price_Costs)_369851.pdf, page 1
  • Warranty length conflicts across documents. The SOW asks for a 2-year minimum warranty, and Section M fails proposals without one. The general terms set the warranty at the manufacturer period or one year, whichever is longer, and they rank above the SOW. Price for two years and ask Astrid Torres in writing which applies.“2-year minimum warranty.” C1_SOW_BPM_11162026.pdf, page 12
  • Financial statement rule conflicts. Section L says that if your Dun and Bradstreet SER score is above 6, you must provide three years of audited statements. Section M accepts reviewed statements and fails only at SER 7 or higher. Check your SER score now and ask which rule applies.“If the Dun & Bradstreet SER score is greater than 6, provide the last three years of audited financial statements.” L_(Instructions to Offeror).pdf, page 5

Key terms

Who can bidOpen to all; no set-asideSection L says SAM.gov registration is required, except for foreign entities.SAM.gov record
Contract periodDelivery 7 and 8 months after award56 BPMs at 7 months; the rest, with fast orbit feedback and interlock, at 8 months.C1_SOW_BPM_11162026.pdf, page 11
How they chooseLowest price among technically acceptable offersThe notice calls this best value LPTA. Non-price factors are pass or fail.M_Evaluation_Factors.pdf, page 1
How to submitEmail to Astrid Torres at astridt@slac.stanford.eduSend quoted price, delivery, technical compliance statement and certification, plus the required forms.Notice text
Questions dueMonday, November 30, 2026Send written questions to Astrid Torres on the Section L Request for Clarifications form.Notice text
Contract typeFirm fixed price subcontractYou quote one fixed price per line item.00_SLAC _RFP_369851_CoverLtr.pdf, page 1
Site visitTwo onsite visits required; two more optionalVisits cover installation and training, and commissioning. The two optional support visits are priced as an option.C1_SOW_BPM_11162026.pdf, page 11

How to respond

  1. Email your complete proposal to Astrid Torres at astridt@slac.stanford.edu before 5:00 PM PT on Friday, December 4, 2026. Late emails are not considered.
  2. Send Volume I, the technical proposal, as a document of 35 pages maximum with no pricing. Send Volume II, the business proposal, separately with the Section B prices.
  3. Put the 90-day validity statement in a signed cover letter from an authorized representative. Section L also has a one-year version, so ask which one applies before November 30, 2026.
  4. Attach every required form: Section A, Section B, Section K, the Buy American Act certificate, the Section L matrix, the IIPP form, the insurance certificate, the small business subcontracting plan and the Dun and Bradstreet report.
  5. Send any questions in writing on the Section L Request for Clarifications form by Monday, November 30, 2026. Questions with non-proprietary content and their answers will be shared with all offerors.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Estimated value of the subcontract. Section B prices are blank and the notice gives no budget.
  • Whether the total subcontract exceeds $2.5 million, which triggers cost or pricing data clauses. The notice does not state the value.
  • Insurance minimum limits. The example certificate of insurance was a scanned image and could not be reviewed, so read it on SAM.gov.
  • Whether pages 2 to 4 of the Green On-Site Services Rider apply to your work. You could not review them, so read them on SAM.gov.
  • Who the SLAC Technical Representative is. Section H lists this as TBD.
  • Whether any amendment will change the schedule or requirements. The notice does not mention one yet.

Notice text

SLAC National Accelerator Laboratory is operated by Stanford University for the Department of Energy. As a management and operating contractor, subcontracts awarded by the Laboratory are not Federal procurements, and are not directly subject to the Federal Acquisition Regulations in 48 CFR. Nonetheless, certain Federal laws, Executive Orders, and regulations may affect our DOE approved purchasing system, as required by statute, regulation, or contract terms and conditions.

SLAC National Accelerator Laboratory invites interested vendors to submit a proposal in accordance with the attached RFP preparation requirements for the SPEAR Beam Position Monitors (BPMs). Any clarification requests are due by Monday, November 30th, 2026. Your proposal must be received no later than Friday, December 4th, 2026, 5:00 PM PT, and be valid for 90 days after submission. NOTE: The following documents are attached in this solicitation.

RFP_369851(AT)_SPEAR_BPMs (26 documents total) Must complete and return all documentation mentioned in the cover letter. Please provide quoted price, delivery, technical compliance statement and certification to Astrid Torres at astridt@slac.stanford.edu by 5PM PT on December 4th, 2026.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 21, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of Energy by email

Each morning we'll send the new solicitations and sources-sought notices from Department of Energy, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy