- Opportunities
- Department of Veterans Affairs
- 36C25727Q0071
Monthly steam filter changes, San Antonio and Kerrville, TX
You would replace the filters in five STERIS Clean Flow Pro steam filter units every month at the VA San Antonio (Audie L. Murphy) and Kerrville medical centers in Texas.
Official title: STERIS Clean Flow Pro Steam Filter Replacement and Calibration Services
- Deadline
- Dec 9, 10:00 AM CT
- 14 days left
- Who can bid
- SDVOSB firms
- Service-disabled veteran-owned small businesses certified by SBA only · Who qualifies
- Last time
- $259K
- Likely Novamed Corporation
- Place
- TX
- Buyer: 257-Network Contract Office 17 (36C257)
What they're buying
The base year runs from Dec 21, 2026, with four one-year options, and the set-aside limits bidding to SDVOSB firms only.
Top catches
“Offers are solicited only from concerns designated in SAM as SDVOSB concerns certified by SBA.” S02_36C25727Q0071.pdf, page 22
Only firms designated in SAM and certified by SBA as SDVOSB can bid. Check your SBA certification and SAM record before you spend time on a quote.
“The filter replacement is monthly, not annually.” 36C25727Q0071 0003.pdf, page 7
The OEM recommends one change a year, but the facility needs monthly changes. Price one kit per unit per month, which is 12 a year, and invoice monthly.
Read by AI (Claude Haiku) on Nov 25, 2026 from the notice and 7 of 9 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Replace the filter in five STERIS Clean Flow Pro units once a month, 12 times per unit per year.
- Supply OEM filter kits: steam filter element 11037038 and housing gasket 11037186, one kit per unit per month.
- Use the 0.1 micron pleated stainless steel filter, following OEM procedures and checklists.
- Provide two fully qualified Field Service Representatives, a primary and a backup, each with at least one year on the same model.
- Work Monday to Friday, 7:30 am to 4:30 pm, excluding federal holidays, unless the COR approves other hours. Coordinate lockout tagout and SPD downtime at least 10 business days ahead.
- Give the COR a Field Service Report with a detailed checklist after each installation.
Who did it before
$259K
on the contract that likely holds this work now: Novamed Corporation. It ends Nov 30, 2026.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- SDVOSB certification is required. Only firms designated in SAM and certified by SBA as SDVOSB can bid. Check your SBA certification and SAM record before you spend time on a quote.
- Filters change monthly, not yearly. The OEM recommends one change a year, but the facility needs monthly changes. Price one kit per unit per month, which is 12 a year, and invoice monthly.
- Calibration dropped by amendment. The SAM title and notice text still mention calibration. The amendment says no calibration is needed, and the updated SOW does not mention it. Price filter changes only, and confirm this with the contracting officer in writing.“The task is for filter replacement, no calibration will be needed.” 36C25727Q0071 0003.pdf, page 4
- OEM authorization letter required. You need a current STERIS OEM authorization letter that covers parts and service. Letters from third parties are rejected. If an OEM-authorized subcontractor does the service, also include an agreement or letter between you and that subcontractor with your quote.“Third party letters will not be accepted.” S02_36C25727Q0071.pdf, page 43
- Subcontracting certificate is mandatory. Sign the VAAR 852.219-75 certificate and return it with your offer, or your offer is ineligible. You may not pay more than 50 percent of the amount you receive to firms that are not certified SDVOSBs.“The Government will not consider offers for award from offerors that do not provide the certification” S02_36C25727Q0071.pdf, page 40
- Health checks before first badge. Field engineers must show proof of a flu shot and a negative TB test, and complete the infection-control class, before they can use a one-day badge. Their vetting is Tier 2 (moderate risk). Plan this time before the first visit.“a negative TB test as well as attend the Infection control class to work on the 1-day pass.” 36C25727Q0071 0003.pdf, page 6
Key terms
| Who can bid | SDVOSB firms certified by SBA only100% set-aside. You must be verified in SAM and SBA when you submit your offer.S02_36C25727Q0071.pdf, page 42 |
|---|---|
| Contract period | Dec 21, 2026 to Dec 20, 2027, plus four 1-year optionsAmendment 0004 changed the start from Nov 23, 2026. The last option year ends Dec 20, 2031.36C25727Q0071 0004.docx |
| How they choose | Best value: comparative review of technical, past performance and priceThe Government may pick a higher-priced quote that gives extra benefit.S02_36C25727Q0071.pdf, page 51 |
| How to submit | Email to Stephanie.Reeves@va.gov in three separate volumesSubject line must read Solicitation 36C25727Q0071.S02_36C25727Q0071.pdf, page 42 |
| Questions due | Nov 6, 2026, 12:00 PM CST (closed)Answers to vendor questions were posted in amendment 0003.S02_36C25727Q0071.pdf, page 44 |
| Contract type | Firm-fixed price services, invoiced monthlyThis is a request for quotes (RFQ). Invoices go through the Tungsten Network.S02_36C25727Q0071.pdf, page 51 |
| Site visit | Fri, Dec 4, 2026: 9:00 AM Audie Main, 1:00 PM Kerrville (Central Time)Bring an unexpired picture ID. The amendment does not say the visit is mandatory.36C25727Q0071 0003.pdf, page 2 |
How to respond
- Email your quote to Stephanie.Reeves@va.gov by Wed, Dec 9, 2026, 10:00 AM CST, with Solicitation 36C25727Q0071 in the subject line.
- Send three separate volumes: Volume 1 technical approach with the STERIS OEM letter (15-page limit, not counting certifications); Volume 2 past performance with up to three references of at least $100K each; Volume 3 price on the completed B.3 schedule, typed and not handwritten.
- Include the signed SF 1449 (blocks 30a to 30c), signed SF 30 amendment acknowledgments, the completed Section B.1 vendor information, and the representations for 52.219-1, 52.229-11, VAAR 852.219-75 and 52.222-48.
- Hold your prices for 90 calendar days after the deadline. Price each unit's monthly filter kit as a firm-fixed unit price.
- If you plan to bid, consider attending the site visit on Fri, Dec 4: 9:00 AM at Audie Main (main entrance lobby) or 1:00 PM at Kerrville (Building 29). Bring an unexpired picture ID.
Attached files
From SAM.gov. Download links open the original files.
- 36C25727Q0071 0004.docxAmendment 0004 changes the contract periods and carries the price schedule, which you must fill in with unit prices and a grand total. Read.
- 36C25727Q0071 0003.pdfAmendment 0003 sets the current deadline and site visit, answers 34 vendor questions and attaches an updated SOW; read it in full, since it controls. Read.
- D.3_PAST PERFORMANCE REFERENCES.pdfA blank past performance reference form that you fill in or replace with your own format; its header shows a different RFQ number, but amendment 0003 confirms 36C25727Q0071 is correct. Read.
- Updated SOW.pdfThe current statement of work, attached to amendment 0003; read it in full, because it lists the five filters and the monthly changes. Read.
- D.1_WAGE DETERMINATION 2015-5253.pdf Not read: over our length limit.
- D.2_WAGE DETERMINATION 2015-5293.pdf Not read: over our length limit.
- 36C25727Q0071 0002.docxAmendment 0002 set a Nov 25 deadline that amendment 0003 replaced; read it for history only, with no action needed. Read.
- S02_36C25727Q0071.pdfThe main solicitation with the SF 1449, the terms and the forms you must sign and return; you must read it in full. Page 35 was not provided, so you could not review it and must read it yourself. Read in part (pages 1–34 and 36–53 of 53).
- 36C25727Q0071 0001.docxAmendment 0001 set a Nov 18 deadline that has since been replaced; read it for history only, with no action needed. Read.
Not stated in what we read
- Estimated value of the contract is not stated.
- Wage determinations 2015-5253 and 2015-5293 were left out of the copies we received, so we could not review them; you must read them.
- Biomedical Engineering and M&O points of contact for scheduling will be given only after award.
- Whether extra filter changes or repairs beyond the monthly kit will be paid, and how. Amendment 0003 says a modification approved by the contracting officer is needed.
- How long the personnel vetting takes and whether a full badge is needed before work starts.
- Whether historical maintenance records for the five units are available, and when they would be provided after award.
Notice text
The Contractor shall provide all labor, materials, OEM replacement filters, tools, test equipment, and qualified service personnel to perform replacement of STERIS Clean Flow Pro steam filters and calibration of associated equipment at the VA San Antonio Healthcare System (Audie L. Murphy VA Medical Center), San Antonio, TX, and the Kerrville VA Medical Center, Kerrville, TX, in accordance with the Statement of Work (SOW).
As published on SAM.gov.
Contacts
- Stephanie Reeves, stephanie.reeves@va.gov
- Shannon Hodgson, shannon.hodgson@va.gov
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at Department of Veterans Affairs for the same kind of work (NAICS 811210, service code J065) in Texas that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Directcare Basic Service ContractNovamed Corporation · 36C25724P0085 | $259,328 | Nov 30, 2026within a month | TX |
| Steris Equipment PM Service and SupportA&B Technical LLC · 36C25624C0043 | $1,004,155 | Nov 14, 2026ended | TX |
| Optifill Service and MaintenanceArxium, Inc. · 36C10B26C0015 | $223,903 | Dec 21, 2026within a month | TX |
| Omnicell Advantage Plan ServicesOmnicell, Inc. · 36C25726P0422 | $105,300 | Dec 31, 2026in 1 month | TX |
| SoftwareLone Star Communications Inc · 36C25625P1225 | $913,559 | Jan 1, 2027in 1 month | TX |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 25, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 9, 10:00 AM CT14 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 811210, electronic and precision equipment repair and maintenance, soonest deadline first.
- Department of the NavyEvaluate and repair three CAMS units, Panama City Beach, FL
- Department of the Air ForceFlat panel up front controller repair, Warner Robins, GA
- Department of Veterans AffairsNeptune rover maintenance at Bay Pines and Cape Coral, FL
- National Institutes of HealthFlow cytometer service and repairs, Bethesda, MD
- Indian Health ServiceBody plethysmograph maintenance and repair, Lawton, OK
- Department of Veterans AffairsJ061 UPS and Battery Maintenance and Testing – Nashville VA Medical Center
- Department of Veterans AffairsNotice of Intent to Sole Source Rauland Nurse Call System Services
- National Institutes of HealthPreventive maintenance for two TracerLab units, Bethesda, MD
Free · at most one email a morning
Get new notices from Department of Veterans Affairs by email
Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy