Control power transformer, McConnell AFB, Kansas
The Kansas Air National Guard 184 Wing at McConnell AFB, Kansas wants one control power transformer, three transformer fuses and installation to replace the Building 16 indoor switchgear transformer.
Official title: Switchgear Transformer Replacement
- Deadline
- Nov 30, 9:00 AM CT
- 4 days left
- Last time
- $123K
- Likely Ambri LLC
- Place
- Not stated
- Buyer: W7M9 USPFO Activity Ksang 184
What they're buying
Delivery and installation is desired within 180 days after order and required within 300 days, and only small businesses may bid.
Top catches
“The submission due date for this solicitation is 23 November 2026 at 9:00 AM (CDT).” Combined Synopsis Solicitation B16 Switchgear Transformer Amend.pdf, page 2
SAM.gov shows 30 November 2026 at 09:00 (-06:00), but the notice says 23 November 2026 at 9:00 AM (CDT). Confirm the correct date with the contracting office and plan for the earlier one.
“The cabinet cannot be replaced so the new unit needs to fit within the dimensions provided.” B16 Switchgear Transformer RFIs Current as of 19Nov26.xlsx
The RFI lists the enclosure as 33 inches wide and the old transformer as about 38 inches wide, and the cabinet cannot be replaced. Read the scanned Bldg 16 dimension file on SAM.gov, which we could not read, and confirm the fit before you price.
Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 4 of 8 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- One new control power transformer, 112.5 kVA, 15 kV class, 95 kV BIL, dry-type and indoor, matching the existing unit's ratings and taps
- Three transformer fuses (CLIN 0002)
- Removal of the old unit, rigging, electrical reconnection, testing, commissioning, and disposal of the old unit
- Acceptance testing: document and installation verification, bolted-connection inspection, insulation-resistance testing, turns-ratio testing and functional checks, witnessed by the Government
- Coordinate the electrical shutdown and restoration with the local utility and the 184 Engineering Team
- Deliver and install within 180 days after order, and no later than 300 days after order
Who supplied it lately
$123K
on a recent contract for the same kind of product: Ambri LLC. It ended Aug 18, 2026.
Matched in USAspending.gov by agency, NAICS and product code; notices rarely name the supplier.
What to watch for
- Closing date conflicts across sources. SAM.gov shows 30 November 2026 at 09:00 (-06:00), but the notice says 23 November 2026 at 9:00 AM (CDT). Confirm the correct date with the contracting office and plan for the earlier one.
- Transformer fit is tight. The RFI lists the enclosure as 33 inches wide and the old transformer as about 38 inches wide, and the cabinet cannot be replaced. Read the scanned Bldg 16 dimension file on SAM.gov, which we could not read, and confirm the fit before you price.
- One quote, no alternatives. Send one quote that covers CLIN 0001, 0002 and 0003 with one approach. Any alternative terms, such as a different termination method, would count as an exception and could lead to rejection.“Quotes that contain alternative terms and conditions will be considered as taking exception to the requirements of the solicitation.” Combined Synopsis Solicitation B16 Switchgear Transformer Amend.pdf, page 2
- Evaluation method is unclear. The notice says the lowest price that meets requirements wins, but it also says price is equal to technical. The RFI says the evaluation was updated, so ask the contracting office which rule governs before you price.“Price is equal to technical evaluation.” Combined Synopsis Solicitation B16 Switchgear Transformer Amend.pdf, page 4
- Delivery address does not match. The notice sends delivery and installation to Building 42, but the RFI describes replacing the Building 16 switchgear transformer. Confirm the exact install site before you price freight, rigging and labor.“to building 42, 57330 Mustang Drive, McConnell AFB, KS 67221” Combined Synopsis Solicitation B16 Switchgear Transformer Amend.pdf, page 1
- Delivery limit is 300 days. The notice asks for delivery within 180 days after order but requires it within 300 days. A schedule beyond 300 days could be judged technically unacceptable, so build supplier lead time around that limit.“Proposals offering delivery schedules beyond 300 days ARO may be deemed technically unacceptable.” Combined Synopsis Solicitation B16 Switchgear Transformer Amend.pdf, page 5
Key terms
| Who can bid | Small businesses only (100% set-aside)Size standard is 800 employees. All offerors must be registered and valid in SAM before award.Combined Synopsis Solicitation B16 Switchgear Transformer Amend.pdf, page 1 |
|---|---|
| Contract period | Install within 180 days after order (desired); no later than 300 days (required)The notice does not describe option years. Late schedules may be judged technically unacceptable.Combined Synopsis Solicitation B16 Switchgear Transformer Amend.pdf, page 5 |
| How they choose | Lowest price that meets the technical requirementThe notice also says price is equal to technical. See the catches.Combined Synopsis Solicitation B16 Switchgear Transformer Amend.pdf, page 4 |
| How to submit | Email to 184WG.MSG.CONTRACTING@us.af.milElectronic files only: PDF, Word or Excel, not password protected. Label each with solicitation number W50S7X-27-Q-0001.Combined Synopsis Solicitation B16 Switchgear Transformer Amend.pdf, page 2 |
| Contract type | Firm-fixed price, single awardCommercial items request for quotes. FAR 52.212-4 terms apply.Combined Synopsis Solicitation B16 Switchgear Transformer Amend.pdf, page 4 |
| Site visit | November 10, 2026 at 0900 (already passed)Held at Bldg 65, Suite 153, McConnell AFB. Attendee details were due 6 November 2026. The notice does not say the visit is mandatory.Combined Synopsis Solicitation B16 Switchgear Transformer Amend.pdf, page 1 |
How to respond
- Confirm the closing date first. The notice says 23 November 2026 at 9:00 AM (CDT), but SAM.gov says 30 November 2026 at 09:00 (-06:00).
- Email your quote to 184WG.MSG.CONTRACTING@us.af.mil as PDF, Word or Excel files that are not password protected. Label each file with solicitation number W50S7X-27-Q-0001 and your name, address, UEI and phone number.
- Include a completed FAR 52.212-3 representations and certifications form, pricing for CLIN 0001, 0002 and 0003, a capability statement of no more than 2 pages, and a quote acceptance period of at least 60 days after closing.
- Add a list of your assumptions with a statement that none of them take exception to the solicitation. Submit one quote with one approach that covers all requirements.
Attached files
From SAM.gov. Download links open the original files.
- LV Termination.jpg Could not be read.
- B16 Switchgear Transformer RFIs Current as of 19Nov26.xlsxQuestions and answers from the contracting office, current as of 19 November 2026. These answers change requirements on fit, testing, outage and disposal, so read them in full. Read only. Read.
- B16 Transformer Drawings.pdfWiring and layout drawings of the Kohler switchgear (project SGP-1071) showing CTs, PTs and fuses. Read only; it does not show the control power transformer itself. Read.
- B16 Drawings.pdfElectrical drawings of the Building 16 switchgear (project SGP-1376), including the one-line, floor plan and dimensions. Read only. Read.
- Transformer Data Plate.jpg Could not be read.
- Combined Synopsis Solicitation B16 Switchgear Transformer Amend.pdfThe main solicitation with submission rules, evaluation terms and protest procedures. You must follow its quote format and return the completed FAR 52.212-3 representations. Read.
- HV Termination.jpg Could not be read.
- Bldg 16 Main Xfmr.pdf Scanned image, not read.
Not stated in what we read
- Estimated value: Not stated.
- The correct closing date and time zone, since the notice and SAM.gov disagree.
- The Specifications or Salient Characteristics - B16 Transformer document named in the notice is not in the attachment list, so its full requirements could not be checked.
- Four files could not be reviewed: LV+Termination.jpg, HV+Termination.jpg, Transformer+Data+Plate.jpg and Bldg+16+Main+Xfmr.pdf. You must read them on SAM.gov, especially the Bldg 16 dimension file.
- Whether Building 42 is the install site or only a delivery point.
- Whether the site visit was required to quote, since it has already passed.
Notice text
The 184 Wing is requesting the purchase of one (1) Control power Transformer and three (3) Transformer fuses to replace Building 16 indoor switchgear transformer. See attached documents for Specifications or Salient Characteristics - B16 Transformer and additional solicitation information.
As published on SAM.gov.
Contacts
- Joshua Kingori, 184WG.MSG.CONTRACTING@us.af.mil, 3167597590
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who has supplied this lately
Contracts at Department of the Army for the same kind of product (NAICS 335311, product code 5950) that end within a year either way of today. Notices rarely name the current supplier: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| S2P2-1500 Kva Pad Mount Transformer-W911S226U2691Ambri LLC · W911S226PA289 | $123,059 | Aug 18, 2026ended | FL |
| TransformersCoil Winding Specialist, Inc. · W519TC25FA113 | $233,090 | Jan 19, 2026ended | OK |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 21, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Nov 30, 9:00 AM CT4 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 335311, power, distribution, and specialty transformer manufacturing, soonest deadline first.
- Defense Logistics AgencyPower supply purchase for DLA Aviation, Philadelphia, PA
- Department of the NavyNavy cable assemblies for submarines and ships
- Defense Logistics AgencyPower distribution units for Navy mission equipment
- Department of the NavyNavy cable assemblies built to drawing specs
- Defense Logistics AgencyTwo power cable assemblies for DLA Distribution
- Defense Logistics Agency120 feet of special cable assembly for DLA Distribution
- Defense Logistics AgencySpecial cable assemblies for DLA Distribution Depot Hill
- Defense Logistics Agency13 special cable assemblies for DLA Aviation
Free · at most one email a morning
Get new notices from Department of the Army by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy