1. Opportunities
  2. Department of Defense
  3. Department of the Navy
  4. N6660426Q0430

Build 135 towed array handling parts, Newport, RI

Build 135 build-to-print parts (brackets, plates, wheels, sprockets and similar) for towed array handling equipment, in 52 line items, and deliver them F.O.B. to Naval Station Newport, RI.

Official title: TAHEF 542 System Components

Deadline
Nov 30, 2:00 PM ET
4 days left
Who can bid
Any business
Registered in SAM.gov · How to register
Last time
$175K
Likely HF Fabrication LLC
Place
Newport, RI
Buyer: NUWC Div Newport

What they're buying

It is one firm fixed price order awarded to the lowest price that passes technical review, and the notice does not state a contract length.

Top catches

Deadline may already have passed
“are to be received on or before Thursday, 19 November 2026 at 2:00PM Eastern Standard Time (EST)” Combined synopsis_solicitation.pdf, page 6

SAM lists Monday, 30 November 2026 at 14:00, but the notice text says Thursday, 19 November 2026 at 2:00PM EST, which has already passed. Email Tyler Shannon in writing to confirm the real due date before you spend time on a quote.

Drawings need JCP certification
“To access the Government documents, the Offeror must possess a valid Joint Certification Program (JCP) certification.” Combined synopsis_solicitation.pdf, page 4

The drawings are export controlled and are not among the files on SAM. You need a JCP certification, a DD 2345 form and a SPRS NIST score under three years old to get them, so check that you qualify before you price the job.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 20, 2026 from the notice and 3 of 4 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Fabricate 135 build-to-print parts in 52 line items, from 1 to 12 pieces each, per SOW tasks 4.1 to 4.53.
  • Paint each part: plug threads and holes, one coat of green primer (MIL-DTL-24441 Formula 150), then two coats of haze gray (Formula 151), sprayed to 4 to 6 mil dry film thickness.
  • Stamp, stencil or laser engrave cage code 53711 and part numbers per MIL-STD-130, then do a visual paint check and touch-up before shipping to TAHEF.
  • Weld to the drawings and standards (AWS A2.4 and S9074 weld specifications), with visual and liquid penetrant test records for every weld that name the certified welder and NDT inspector.
  • Deliver a certificate of compliance and mercury free statement on company letterhead, a raw material certificate of analysis, process certification, and a contract status report.
  • Follow NISPOM (32 CFR 117) and DFARS 252.204-7012 rules for controlled unclassified information, and report any security incident through your facility security officer.

Who supplied it lately

$175K

on a recent contract for the same kind of product: HF Fabrication LLC. It ended Nov 20, 2026.

Matched in USAspending.gov by agency, NAICS and product code; notices rarely name the supplier.

What to watch for

  • Deadline may already have passed. SAM lists Monday, 30 November 2026 at 14:00, but the notice text says Thursday, 19 November 2026 at 2:00PM EST, which has already passed. Email Tyler Shannon in writing to confirm the real due date before you spend time on a quote.
  • Drawings need JCP certification. The drawings are export controlled and are not among the files on SAM. You need a JCP certification, a DD 2345 form and a SPRS NIST score under three years old to get them, so check that you qualify before you price the job.
  • Quantities and part numbers disagree. The price list and the SOW disagree: CLIN 0045 asks for 2 Roller Brackets but SOW task 4.46 says six, and part numbers differ for CLIN 0038, 0041 and 0042. Ask the contact which version is correct before you price.“Roller Bracket (P/N 8828005).” Statement of Work.pdf, page 32
  • Welding letter decides acceptance. Your quote is judged on this letter, so a missing WPS or PQR can make you technically unacceptable. The SOW says WPS and PQR must be on file with TAHEF before any welding, and if you built these parts within ten years you may request a waiver from submitting them with your quote.“Complete and submit the Welding Certification Letter, Attachment 6 to this notice” Combined synopsis_solicitation.pdf, page 4
  • CMMC Level 2 needed before award. You need CMMC Level 2 (Self) before award for each system that handles controlled information, and your offer must list your CMMC UIDs from SPRS. Confirm both now, since without them you likely cannot be awarded.“The CMMC level required by this RFQ is: CMMC Level 2 (Self).” Combined synopsis_solicitation.pdf, page 5
  • Deliverables exhibit not reviewed. We could not review the CDRL exhibit because it is a scanned image, so any extra deliverables it requires are unknown. Read that file on SAM before you price, since the SOW lists CDRL items A001 to A007.“The contractor shall provide a Certificate of Compliance” Statement of Work.pdf, page 32

Key terms

Who can bidOpen to all offerors, no set-asideSize standard is 500 employees for NAICS 332710. Drawing access also needs JCP certification.Combined synopsis_solicitation.pdf, page 1
How they chooseLowest price technically acceptable (LPTA), single firm fixed price orderTechnical acceptability depends on the welding letter and plan.Combined synopsis_solicitation.pdf, page 4
How to submitEmail to tyler.z.shannon.civ@us.navy.milInclude price, shipping, delivery date, CAGE code, UEI and CMMC UIDs.Combined synopsis_solicitation.pdf, page 6
Contract typeFirm fixed price purchase orderCommercial item buy under FAR Part 12, with no separate written solicitation.Combined synopsis_solicitation.pdf, page 1

How to respond

  1. Email Tyler Shannon at tyler.z.shannon.civ@us.navy.mil to confirm the due date, since the SAM record says Monday, 30 November 2026 at 14:00 (-05:00) and the notice text says Thursday, 19 November 2026 at 2:00PM EST.
  2. If you need the drawings, send a valid DD 2345 form to the RFQ point of contact, along with your JCP certification and your SPRS NIST score, which must be no more than three years old. The notice says requests for drawings must come from the JCP Custodian.
  3. Complete the Welding Certification Letter (Attachment 6) with your WPS number, PQR number (N/A only for weld repairs), point of contact and company name, or include a detailed plan to qualify during performance.
  4. Email one quote to the same address with item prices, shipping, best delivery date, point of contact with phone and email, CAGE code, UEI, CMMC UID(s), and a validity date at least 60 days from the due date.
  5. Format, page limits and file size: Not stated.

Attached files

From SAM.gov. Download links open the original files.

  • Welding Cert letter_Redacted.pdfA blank TAHEF welding form that you must fill in with your WPS, PQR, contact and company name and submit with your quote. Read.
  • Combined synopsis_solicitation.pdfThe request for quote with the item list, clauses and emailed submission rules; read it in full and price every line you bid on. Read.
  • CDRLS_Redacted.pdf Scanned image, not read.
  • Statement of Work.pdfThe work statement listing each part, its paint and marking steps, weld and test rules and required certificates; read it in full, with no form to fill in. Read.

Not stated in what we read

  • Which due date is correct: Monday, 30 November 2026 at 14:00 (-05:00) or Thursday, 19 November 2026 at 2:00PM EST.
  • Estimated value or budget: Not stated.
  • Delivery date and contract length: Not stated beyond your proposed best delivery date.
  • Contents of the Government drawings (Attachment 1), RIR and VIR, which the notice lists but which are not on the SAM file list.
  • Question deadline and any site visit or pre-bid meeting: Not stated.
  • Quote format, page limits and whether prices are needed per line or as a total: Not stated.

Notice text

Please see the attached combined synposis/solicitation and additional attachments.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

Who has supplied this lately

Contracts at Department of the Navy for the same kind of product (NAICS 332710, product code 5340) that end within a year either way of today. Notices rarely name the current supplier: these are likely candidates, not a fact.

Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.

History

  • Nov 20, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Navy by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Navy, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy