Repair of thrust shoe with instrument for the Navy
The Navy wants quotes to repair THRUST SHOE W/INSTR items to a required repair turnaround time of 0230 days, with government source inspection.
Official title: THRUST SHOE W/INSTR
- Deadline
- Dec 4, 3:30 PM ET
- 8 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- $120K
- Likely RBC Southwest Products, Inc.
- Place
- Not stated
- Buyer: NAVSUP Weapon Systems Support Mech
What they're buying
The notice does not state the quantity, place of work, or contract length.
Top catches
“Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late” Notice text
Late assets cost you a price reduction per unit per month, and the amount and cap are blank in this text. Decide those figures only after you confirm you can meet the 0230-day turnaround time.
“Consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation.” Notice text
Only authorized distributors of the original manufacturer's item are considered. Send proof on company letterhead, signed by a responsible official, with your offer to the Procurement Contracting Officer.
Read by AI (Claude Haiku) on Nov 18, 2026 from the notice. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Repair THRUST SHOE W/INSTR items to the required repair turnaround time of 0230 days, measured from physical receipt of the asset.
- Repair to the CAGE 75333 and reference 482480-008 requirements, using your own repair standards, manuals, and directives.
- Mark each item in accordance with MIL-STD-130, REV N, 16 NOV 2012.
- Preserve and package items as specified in the schedule, which refers to MIL-STD 2073 packaging.
- Report every transaction in the Commercial Asset Visibility (CAV) system by the end of the fifth regular business day after receipt.
- Price a testing and evaluation fee in case an asset is determined beyond repair.
Who supplied it lately
$120K
on a recent contract for the same kind of product: RBC Southwest Products, Inc.. It ends Dec 28, 2026.
Matched in USAspending.gov by agency, NAICS and product code; notices rarely name the supplier.
What to watch for
- Late repair price reduction, blanks. Late assets cost you a price reduction per unit per month, and the amount and cap are blank in this text. Decide those figures only after you confirm you can meet the 0230-day turnaround time.
- Authorized distributor proof required. Only authorized distributors of the original manufacturer's item are considered. Send proof on company letterhead, signed by a responsible official, with your offer to the Procurement Contracting Officer.
- Cybersecurity level not stated. The notice lists a Cybersecurity Maturity Model Certification (CMMC) level requirement, but the text does not say which level applies. Ask the contracting officer before you bid, since the required level may decide whether you are eligible.“NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025)” Notice text
- Deadline uses a -04:00 offset. The deadline is written with a UTC offset of -04:00, not a named time zone. Work out what that time means on your clock and submit early.“2026-12-04T16:30:00-04:00” SAM.gov record
- Freight terms conflict. The notice says all freight is FOB Origin, but it also says the Navy handles freight. Ask the contracting officer who pays freight before you price shipping.“All freight is FOB Origin.” Notice text
- Acceptance counts toward turnaround. The turnaround ends only when the Government accepts the asset, and government source inspection is required. Plan time for inspection, not just for repair and shipping.“The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract.” Notice text
Key terms
| How to submit | Not statedThe notice lists a contact but does not say how or where to send the quote.Notice text |
|---|---|
| Contract type | Fixed-price, per clause titleThe Firm-fixed-Price, Estimated, and Not-to-Exceed boxes are blank in the text.Notice text |
How to respond
- Confirm you are an authorized distributor of the original manufacturer's item, and prepare proof on company letterhead signed by a responsible official.
- Prepare a quote with unit price, total price, and repair turnaround time in days, plus the buy-new comparison and T&E fee fields if you can price them.
- If you cannot meet 0230 days, state your company's capacity constraints on the quote form.
- Submission method and address: Not stated. Confirm with the listed contact, Valentino P. Arena, at valentino.p.arena.civ@us.navy.mil or 771-229-0383, before the deadline of 16:30 offset -04:00 on Friday, December 4, 2026.
Not stated in what we read
- Quantity of thrust shoe items to be repaired.
- Estimated value or price of the work.
- Set-aside status and size standard, if any.
- Which CMMC level applies to this solicitation.
- How the quotes will be evaluated and how the award will be chosen.
- How and where to submit the quote, and where the work is performed.
Notice text
CONTACT INFORMATION|4|N771.6|HQH|771-229-0383|valentino.p.arena.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|TBD|TBD|TBD|N00104|TBD|TBD|W25G1U|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|Valentino Arena (valentino.p.arena.civ@us.navy.mil)| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||x|x|x||x|x||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| Accelerated and incremental delivery is encouraged and accepted before the delivery date(s) listed in the schedule.
All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractors written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnaround Time (RTAT) of: 0230 Days Government Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work.
Your quote should include the following information: QUOTE AMOUNT AND RTAT Unit Price:__________ Total Price:__________ Repair Turnaround Time (RTAT): _______ days If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract.
For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractors facility as reflected in the Acction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.
The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE) ___ Return Material Authorization # (RMA), if applicable:__________ Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :__________________ TESTING AND EVALUATION IF BEYOND REPAIR T&E fee/price (if asset is determined BR/BER): AWARDEE INFO & PERFORMANCE LOCATION Awardee CAGE: __________ Inspection & Acceptance CAGE, if not same as ""awardee CAGE"": __________ Facility/Subcontractor CAGE (where the asset should be shipped), if not same as ""awardee CAGE"":__________ IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW New unit price:__________ New unit delivery lead-time:__________ The Government intends to add an option quantity to the resultant contract.
In reference to the option quantity, the Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The Contracting Officer may exercise the option by written notice to the Contractor within the number of days in FAR 52.217-6 herein. Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree. IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late - any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction.
If a price reduction is required due to unexcusable contractor delay, the Contracting Officer will implement the aforementioned price reduction via a ""reconciliation modification"" at the end of the contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. In reference to the above important note, the contractor provides the following price reduction amount per unit per month the contractor does not meet the RTAT: $__________, up to a maximum of: $_________. \ 1.
SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the THRUST SHOE W/INSTR . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The THRUST SHOE W/INSTR repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures.
CAGE___Ref. No. ;75333 482480-008; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order.
When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation.
When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts.
Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein.
Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order.
The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.
4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 Inspection/Testing Repaired Items - The Contractor shall perform all inspection and testing requirements as specified in the original manufacturer's specifications and drawings. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below.
MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format.
Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document.
On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.2 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings.
There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only.
F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. 6.3 Notice To Distributors/Offerors - Consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation.
If you desire to be considered as a potential source for award of this contract, proof of being an authorized distributor shall be provided on company letterhead signed by a responsible company official and sent with your offer to the Procurement Contracting Officer.
As published on SAM.gov.
Contacts
- Telephone: 7176052498, VALENTINO.P.ARENA.CIV@US.NAVY.MIL
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who has supplied this lately
Contracts at Department of the Navy for the same kind of product (NAICS 332991, product code 3120) that end within a year either way of today. Notices rarely name the current supplier: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| This Procurement Is for the Manufacture of (100) Ea. Bearing, Link, P/N 416505-1, in Support of Low Loss Launch Valve (LLLV). P/N 416505-1, NSN: 3120-00-431-0646RBC Southwest Products, Inc. · N6833526P1032 | $119,550 | Dec 28, 2026in 1 month | CA |
| Bushing, SleeveArgo Turboserve Corporation · N0010422PEE98 | $205,406 | Feb 24, 2027in 2 months | VA |
| CB Stator SleeveNorthrop Grumman Systems Corporation · N0010424CNA17 | $8,260,170 | Jun 1, 2027in 6 months | CA |
| Bearing Half Set, SLAmerican Metal Bearing Co · N0010425PUB33 | $796,000 | Apr 29, 2026ended | CA |
| Bearing, Plain, SpherAmerican Metal Bearing Co · N0010425PUB24 | $517,909 | Feb 23, 2026ended | CA |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 18, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 4, 3:30 PM ET8 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 332991, ball and roller bearing manufacturing, soonest deadline first.
- Defense Logistics Agency513 cylindrical roller bearings for DLA Distribution
- Defense Logistics AgencyNeedle roller bearing source search, Richmond, VA
- Defense Logistics AgencyDomestic sources for 12 foreign-made bearing items
- Defense Logistics AgencyDuplex ball bearings for DLA depot, Oklahoma
- Defense Logistics Agency37 ball bearing units for DLA Distribution
- Defense Logistics AgencyAirframe ball bearings for DLA Cherry Point
- Defense Logistics Agency88 cylindrical roller bearings for DLA Warner Robins
- Defense Logistics Agency19 needle roller bearings for DLA Distribution
Free · at most one email a morning
Get new notices from Department of the Navy by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Navy, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy