Towed array subassemblies for the U.S. Navy
The Navy is buying towed array subassemblies built to drawing 497A75300: two units under CLIN 0001AA and one under CLIN 0001AB, delivered within 180 days, with an option for added quantity.
Official title: 58--TOWED ARRAY SUBASSE
- Deadline
- Dec 14, 3:30 PM ET
- 18 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- $4.98M
- Likely Lockheed Martin Corporation
- Place
- Not stated
- Buyer: NAVSUP Weapon Systems Support Mech
What they're buying
The place of performance is not stated, and the closing date conflicts within the notice.
Top catches
“This amendment is extending the solicitation close date to 27 March 2026.” Notice text
The SAM.gov record and the first amendment line say 14 December 2026, but a later amendment line says 27 March 2026 and another says 13 February 2026, both already past. Ask the contracting officer in writing which date governs before you plan your bid.
“access needs to be requested on the individual solicitation page under Contract Opportunities on SAM.gov website” Notice text
The item is defined by drawings that are listed but not attached, and no files are on this notice. Request access on the SAM.gov solicitation page, then email the contact named in the notice before you price the work.
Read by AI (Claude Haiku) on Nov 18, 2026 from the notice. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Two towed array subassemblies under CLIN 0001AA and one under CLIN 0001AB, part number 497A75300-39 per drawing 497A75300 (CAGE 53711).
- Bonded structure and vibration damping tiles, with process specifications 8482161 (chloroprene vulcanization), 8482159 (tile installation), 8482158 (epoxy bonding) and 8482160 (gap filling).
- First article test: bonded inserts must withstand a minimum 6,000 LBS load, and cured hardness is verified per MIL-PRF-81733.
- Production lot hardness test per MIL-PRF-81733 on each batch of mixed material used for structure bonding.
- Mercury-free material for submarine and surface ship use, with written certification on each production order that materials and processes are unchanged.
- Quality system to ISO 9001, marking per MIL-STD-129, packaging per MIL-STD 2073, and a one-year warranty from delivery.
Who supplied it lately
$4.98M
on a recent contract for the same kind of product: Lockheed Martin Corporation. It ended Nov 16, 2026.
Matched in USAspending.gov by agency, NAICS and product code; notices rarely name the supplier.
What to watch for
- Closing dates conflict in notice. The SAM.gov record and the first amendment line say 14 December 2026, but a later amendment line says 27 March 2026 and another says 13 February 2026, both already past. Ask the contracting officer in writing which date governs before you plan your bid.
- Drawings listed but not attached. The item is defined by drawings that are listed but not attached, and no files are on this notice. Request access on the SAM.gov solicitation page, then email the contact named in the notice before you price the work.
- Only authorized distributors considered. Award consideration goes only to authorized distributors of the original manufacturer's item. If you are a distributor, send proof on company letterhead signed by a responsible official with your offer; if you are not, you probably cannot win this award.“Consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation.” Notice text
- Set-aside field conflicts with clause. SAM.gov says the set-aside is Not stated, but the notice includes a total small business set-aside clause. Confirm with the contracting officer whether this buy is reserved for small businesses before you bid.“NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)” Notice text
- Option priced into the award. The award goes to the lowest total price for the full quantity, including the option, and you are asked to price the option. The option percentage is not stated, so ask how much quantity the option covers before you price it.“It is requested that pricing be submitted on the option provision.” Notice text
- First article and process tests. Before production orders are accepted, you must pass a first article test and qualify each bonding process. Price the test time, materials, qualification work and the delay they add to delivery.“First Article Test (FAT) and approval is required.” Notice text
Key terms
| Who can bid | Total small business set-aside clause in the noticeThe SAM.gov set-aside field says Not stated, but the clause list includes a total small business set-aside. Award consideration also goes only to authorized distributors.Notice text |
|---|---|
| Contract period | Delivery within 180 daysCLIN 0001AA: quantity 2. CLIN 0001AB: quantity 1. The overall contract period is not stated.Notice text |
| How they choose | Lowest aggregate total price, including the optionEvaluated on the total quantity, inclusive of the option provision.Notice text |
| Contract type | Fixed-price supply contractThe award is bilateral and needs your written acceptance before execution.Notice text |
How to respond
- Confirm the closing date with the contracting officer first, since the notice gives conflicting dates. The SAM.gov record shows Monday, December 14, 2026, 16:30 (-04:00).
- Request drawing access on the SAM.gov solicitation page, then email the contact at stephen.a.knox.civ@us.navy.mil as the notice directs.
- Where to send the offer: Not stated. Put proof of authorized distributor status on company letterhead, signed by a responsible official, with your offer to the Procurement Contracting Officer.
- Price CLIN 0001AA (2 units) and CLIN 0001AB (1 unit) for delivery within 180 days, plus the option quantity you are asked to price.
Not stated in what we read
- Which closing date governs: the record says 14 December 2026, but amendment text lists 27 March 2026 and 13 February 2026.
- How and where to send your offer (portal, email or address); the notice does not say.
- Whether the set-aside applies and which size standard applies; the record says Not stated.
- Estimated value of the buy.
- Place of performance, delivery location and inspection point (listed as TBD).
- How much quantity the option covers; the notice refers to a percentage but does not state it.
Notice text
CONTACT INFORMATION|4|N744.17|BLB|(771) 229-2110|stephen.a.knox.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specifications Section C and Section E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION/ACCEPTANCE POINT|6|TBD|TBD|TBD|TBD|TBD|TBD| DESIRED AND REQUIRED TIME OF DELIVERY (JUNE 1997)|29|CLIN 0001AA|2|180 Days|CLIN 0001AB|1|180 Days|||||||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications; COMBO - Receiving Report & Invoice - Material|N/A|TBD|N00104|TBD|TBD|W25G1U - 2; W62G2T - 1|TBD|N/A|N/A|N/A|N/A|N/A|N/A|N/A|| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13||X|||||||||||| SMALL BUSINESS PROGRAM REPRESENTATIONS (FEB 2024)|4|334290|800||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|334290|800|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| Hereby extended solicitation due date to 14 Dec 2026.
All other terms and conditions remain the same. \ This amendment is extending the solicitation close date to 27 March 2026. \ Solicitation expired. Amended solicitation with end date of 13 Feb 2026. \ 1. This requirement is pursuant to Emergency Acquisition Flexibilities (EAF). 2. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 3. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods suchas email.
The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 4. If requirement will be packaged at a location different from the offeror's address, the offeror shall provide the name, street address, and CAGE of the facility. 5. Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS).
Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded shall be a rated order. 6. If drawings are included in the solicitation, access needs to be requested on the individual solicitation page under Contract Opportunities on SAM.gov website. After requesting access, send an email to the POC listed on the solicitation. 7.
The option provision is included in the event the Government has an additional requirement 365 DAYS after issuance of the award. This will authorize the Government to add the additional quantity, up to the percentage cited, to the order, via modification without having to re-solicit. 8. It is requested that pricing be submitted on the option provision. 9. Evaluation for the award of the proposed requirement will be based upon thelowest aggregate total price submitted for the total quantity, inclusive of theoption provision. \ 1.
SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the TOWED ARRAY SUBASSE . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made.
2.1.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained.
DRAWING DATA=497A10012 |53711| E| |D| | | | DRAWING DATA=497A10104 |53711| E| |D| | | | DRAWING DATA=497A63201 |53711| E| |D| | | | DRAWING DATA=497A75300 |53711| G| |D| | | | DRAWING DATA=497A75301 |53711| D| |D| | | | DRAWING DATA=497A80018 |53711| D| |D| | | | DRAWING DATA=497A80072 |53711| B| |D| | | | DRAWING DATA=8482141 |53711| A| |D| | | | DRAWING DATA=8482148 |53711| -| |D| | | | DRAWING DATA=8482149 |53711| A| |D| | | | DRAWING DATA=8482158 |53711| A| |D| | | | DRAWING DATA=8482159 |53711| -| |D| | | | DRAWING DATA=8482160 |53711| -| |D| | | | DRAWING DATA=8482161 |53711| A| |D| | | | DOCUMENT REF DATA=MIL-STD-129 | | |P |041029|A| |03| DOCUMENT REF DATA=MIL-A-24456 | | | |790615|A| 3| | DOCUMENT REF DATA=ASME-Y14.5.1M | | | |941114|A| | | DOCUMENT REF DATA=MIL-DTL-15024 | | |F |971128|A| | | DOCUMENT REF DATA=ASTM-D329 | | | |901026|A| | | DOCUMENT REF DATA=MIL-PRF-81733 | | |D |980515|A| | | DOCUMENT REF DATA=ISO9001 | | | |010417|A| | | DOCUMENT REF DATA=MIL-STD-973 | | | |950113|A| |03| 3.
REQUIREMENTS 3.1 Design, Manufacture, and Performance - Except as modified herein, the TOWED ARRAY SUBASSE furnished under this contract/purchase order shall meet the design, manufacture, and performance requirements specified on drawing ;497A75300; cage ;53711; . 3.1.1 ;PN - 497A75300-39; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-129; . 3.3 ;The requirements of 53711 drawing #497A75300 are such that a potential vendor must comply with multiple drawing and mil-spec requirements prior to award.
The item required is an assembly of parts. The piece parts and the assemblage processes need to comply with all requirements as desribed in the production notes and subsequent drawing specification requirements. The following drawings specifications require process qualification prior to acceptance of production orders: NAVSEA Drawing 8482161, Process Specification for Vulcanization of Chloroprene Rubber (per 3.6) NAVSEA Drawing 8482159, Process Specification for Installation of Vibration Damping Tiles (per 3.6) NAVSEA Drawing 8482158, Process Specification For Bonding with Epoxy Adhesives (per 3.6) NAVSEA Drawing 8482160, Process Specification for Gap Filling (per 3.6) Per NAVSEA DRAWINGS: 3.6 Qualification.
This specification requires process qualification prior to acceptance of production orders. The qualification need not be accomplished for repeat orders, provided that the materials and processes have not been changed. With each production order the supplier shall furnish certification in writing that the materials and processes have not been changed in any way from that used when the process was originally qualified. 3.6.1 Requalification. The supplier is advised that if the material formulation or manufacturing process has been changed since the receipt of qualification approval, requalification shall be required before supplying the product manufactured inaccordance with this specification.
The supplier shall notify the procuring activity prior to change. The procuring activity will determine the extent of the requalification. 4.2.1 Qualification Test. Process qualification tests are specified in Table 1. Each bonded materials combination for Type I bond shall be tested to qualify the bonded strength and peel rate. ; 3.4 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.4.1 ;First Article Test/Inspection (Contractor) - FIRST ARTICLE INSPECTION: CONDUCT TENSILE TEST ON ALL BONDED STRUCTURE IAW 8482158.
BONDED INSERTS SHALL WITHSTAND A MINIMUM 6,000 LBS LOAD WITHOUT BONDAND/OR STRUCTURE DEGRADATION. VERIFY CURED HARDNESS IAW MIL-PRF-81733. ; 3.5 Production Lot Approval (Contractor Testing) - Production Lot Test and approval is required. 3.5.1 ;QUALITY CONFORMANCE TESTS: PERFORM CURED FN 10 HARDNESS TEST IAW MIL-PRF-81733 ON EACH BATCH OF MIXEDMATERIAL USED FOR STRUCTURE BONDING. ; 3.6 Configuration Control - MIL-STD-973 entitled "Configuration Management", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated.
The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973, Paragraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original and two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.)
3.6.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until another drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted, the date of the granting of the authorization, and the name of the granting authority.
Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below. The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788. Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor.
3.7 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture.
The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part.
The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard.
If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned.
These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys.
Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein.
Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Quality System Requirements - The supplier shall provide and maintain a quality system acceptable to the Government.
The quality system requirements shall be in accordance with ISO 9001. 4.2.1 ;Suppliers currently using and maintaining Inspection System Requirements to MIL-I-45208 are granted permission to utilize this if desired.; 4.3 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program.
The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.4 Records of Inspection - (This requirement is not applicable to Government Purchase Orders) Records of all inspection work performed by the Contractor, as referenced elsewhere in this contract, shall be kept complete and available to the Government during the performance of the contract and for a period of four years after final delivery of supplies.
4.5 First Article Test/Inspection Report - The Contractor shall prepare and submit a report in accordance with the Contract Data Requirements List (DD Form 1423). The report shall be approved prior to production. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6.
NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format.
Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document.
On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.2 Notice To Distributors/Offerors - Consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation.
If you desire to be considered as a potential source for award of this contract, proof of being an authorized distributor shall be provided on company letterhead signed by a responsible company official and sent with your offer to the Procurement Contracting Officer. 6.3 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings.
There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only.
F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. DATE OF FIRST SUBMISSION=ASREQ ;APPROVAL OF THE REPORT BY NUWC NWPT ISEA REQUIRED PRIOR TO COMMENCEMENT OF PRODUCTION LOT UNITS.; Michael Reed Naval Undersea Warfare Center Division Newport Code 1533, Hull Arrays and Distributed Sensors michael.d.reed@navy.mil DATE OF FIRST SUBMISSION=ASREQ QUALITY CONFORMANCE TESTS TO BE PERFORMED AS HARDNESS TEST IAW MIL-PRF-81733 ON EACH BATCH OF MIXEDMATERIAL USED FOR STRUCTURE BONDING.
POC REGARDING TESTING IS AS FOLLOWS: Michael Reed Naval Undersea Warfare Center Division Newport Code 1533, Hull Arrays and Distributed Sensors michael.d.reed@navy.mil
As published on SAM.gov.
Contacts
- Telephone: 7176056805, STEPHEN.A.KNOX.CIV@US.NAVY.MIL
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who has supplied this lately
Contracts at Department of the Navy for the same kind of product (NAICS 334290, product code 5845) that end within a year either way of today. Notices rarely name the current supplier: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| NRP, Module, AcousticLockheed Martin Corporation · N0010423CNA41 | $4,979,070 | Nov 16, 2026ended | VA |
| Panel, Sonar GTCGlobe Composite Solutions, LLC · N0010426PYC56 | $102,502 | Nov 2, 2026ended | MA |
| Control, Signal ProcUndersea Sensor Systems, Inc. · N0038326PBA07 | $394,460 | Oct 30, 2026ended | IN |
| Towed Body, SonarArgon St, Inc. · N0010424CYB02 | $2,975,000 | Oct 26, 2026ended | PA |
| Towed Body, SonarArgon St, Inc. · N0010425CUA09 | $1,114,032 | Oct 6, 2026ended | PA |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 18, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 14, 3:30 PM ET18 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 334290, other communications equipment manufacturing, soonest deadline first.
- Department of the NavyOne part, quantity 1, built to technical data package
- Defense Health Agency (DHA)Notice of Intent to Sole Source - Security System Update
- Defense Logistics AgencyLight interference filters for AN/PVS-14, Aberdeen, MD
- Defense Logistics AgencyThree keyers for DLA Distribution Depot Hill
- Defense Logistics Agency40 control communication units for Little Creek
- Defense Logistics Agency460 cryptographic transfer units for DLA San Diego
- Defense Logistics AgencyEthernet fiber optic module assembly, Fort Bliss, TX
- Department of the NavyRepair of signal converter, Anaheim, CA
Free · at most one email a morning
Get new notices from Department of the Navy by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Navy, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy