AN/SPS-75 radar parts repair for Coast Guard, Baltimore, MD
The Coast Guard wants a contractor to open, inspect, repair, test, and package about 53 AN/SPS-75 air search radar component line items used on Coast Guard cutters.
Official title: TRS-3D /AN/SPS-75 Radar repairs/ overhaul services
- Deadline
- Dec 1, 12:00 PM ET
- 6 days left
- Last time
- $285K
- Likely Rohde & Schwarz USA, Inc.
- Place
- Baltimore, MD
- Buyer: SFLC Procurement Branch 2(00085)
What they're buying
It plans a requirements contract with one-year ordering periods over three years, and only Northern Defense Industries is named as the authorized repair provider.
Top catches
“Therefore, this item is removed from the schedule of supplies related to the Open, Inspect, Report services.” 70Z08526RRJ001B00 Amendment A00005.pdf, page 2
Amendment A00005 removes item 0046 (STC Generator DW), but the Rev 1 schedule and SOW Rev 3 still list it. The Rev 1 schedule also lacks the Waesche beam controller line 0053 that the amendment adds. Ask the contracting officer in writing which list controls before you price.
“Due to the sole source nature of this acquisition” Solicitation_70Z08526RRJ001B00.pdf, page 55
Only Northern Defense Industries (NDI) is named as the authorized repair provider, and the award is made without full and open competition. If you are not NDI, a bid is unlikely to be considered, so decide before you spend time on a proposal.
Read by AI (Claude Haiku) on Nov 20, 2026 from the notice and 15 of 18 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Open and inspection report on each unit: disassemble, inspect, and report condition, parts, repair cost, and whether it is beyond economical repair (over 65% of new cost).
- Repair each unit to ready-for-issue condition using new original OEM parts, with re-assembly, alignment, testing, and a test report for each component.
- Install field changes, modifications, and firmware upgrades; apply conformal coating on listed circuit boards.
- Preserve, pack, and mark each item: sealed bags, desiccant, individual boxes, wood crates over 50 pounds, bar code labels, and MIL-STD-129R markings. Storage life up to two years.
- Ship repaired items to USCG SFLC Receiving Room, Bldg. 88, 2401 Hawkins Point Rd, Curtis Bay, MD 21226, Monday through Friday 0730 to 1300.
- Deliver 18 months after order for most items; 20 to 25 months for five items (STC generator, HVT, HPM, converter-detector, and CPI TWT).
Who did it before
$285K
on the contract that likely holds this work now: Rohde & Schwarz USA, Inc.. It ended Aug 2, 2026.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Line items disagree across files. Amendment A00005 removes item 0046 (STC Generator DW), but the Rev 1 schedule and SOW Rev 3 still list it. The Rev 1 schedule also lacks the Waesche beam controller line 0053 that the amendment adds. Ask the contracting officer in writing which list controls before you price.
- Sole-source award to NDI. Only Northern Defense Industries (NDI) is named as the authorized repair provider, and the award is made without full and open competition. If you are not NDI, a bid is unlikely to be considered, so decide before you spend time on a proposal.
- Wage determination applies. The government says a wage determination applies to work done before shipment to Germany and before final shipment to the Coast Guard. Attachment 6 was not in the text we could review, so read it and price your labor to its rates before you bid.“Yes. Based on work performed by NDI prior to shipping item/items to Germany” Atttachment 7 - Responses to Questions_12AUG2026.pdf, page 3
- No drawings, OEM parts only. The government will give you no drawings, specifications, or schematics. Substitute parts are not allowed and the SOW requires new original OEM parts, so confirm you can get OEM data and parts before you bid.“NO DRAWINGS, SPECIFICATIONS OR SCHEMATICS ARE AVAILABLE FROM THIS AGENCY.” Solicitation_70Z08526RRJ001B00.pdf, page 5
- Email size and page limits. Proposals go by email to both contacts, and each email must be 5 MB or less. Pages over the limits are removed and not evaluated, and the technical statement may not exceed fifteen pages.“H. Email submission shall not exceed 5mb.” Solicitation_70Z08526RRJ001B00.pdf, page 52
- Past performance window conflicts. Section L asks for contracts completed within the last 3 years, but Section M says 5 years. Use recent contracts from the last 3 years to meet the stricter test, and ask which period applies.“recent (completed within the last (3) three years))” Solicitation_70Z08526RRJ001B00.pdf, page 53
Key terms
| Who can bid | Only Northern Defense Industries (NDI) is named; no set-asideThe award is sole source, made without full and open competition.Solicitation_70Z08526RRJ001B00.pdf, page 4 |
|---|---|
| Contract period | Three one-year ordering periods; start date conflictsSOW Rev 3 says Nov 24, 2026. Section G says 10/27/2026 to 10/28/2027.ATTACHMENT 2_ STATEMENT OF WORK_Rev3. 12AUG2026.pdf, page 23 |
| How they choose | Technical capability, past performance, then priceSole-source award. One contract goes to one offeror whose price is fair and reasonable.Solicitation_70Z08526RRJ001B00.pdf, page 55 |
| How to submit | Email to Mark Cap and Tatiana Sher; 5 MB limitSend the signed SF1449 blocks, pricing in .xlsx and signed PDF, and other forms.Solicitation_70Z08526RRJ001B00.pdf, page 51 |
| Questions due | Closed: July 27, 2026, 1:00 PM ESTAnswers were issued in amendments and in Attachment 7.Solicitation_70Z08526RRJ001B00.pdf, page 54 |
| Contract type | Requirements contract, firm-fixed-price ordersNo work starts until a task order is issued.Solicitation_70Z08526RRJ001B00.pdf, page 54 |
How to respond
- Email your proposal to Mark.Cap@uscg.mil and Tatiana.Sher1@uscg.mil by Tuesday, December 1, 2026, 12PM EST.
- Keep each email at 5 MB or less. Include a one-page cover letter with your address, UEI, TIN, and a technical statement of 15 pages or fewer.
- Fill in Attachment 1 pricing for every line item in every ordering period and the six-month extension, in .xlsx and as a signed PDF. Do not round prices.
- Include the SF1449 blocks 12, 17a, and 30a to c, signed amendments, E-Verify enrollment proof, any subcontractor list, and up to three past performance forms (Attachment 4).
- Confirm your SAM registration is active before you submit. Payment goes only to the financial institution listed in SAM.
Attached files
From SAM.gov. Download links open the original files.
- ATTACHMENT 1_ SCHEDULE OF SUPPLIES.xlsxThe original price schedule, now superseded; do not use it to price. Read.
- Attachment 8 Example OpenandInspectionReport sanitized.pdfAn example open and inspection report that shows the format you will use for each unit; read it, and fill in your own report later. Read.
- ATTACHMENT 2_ STATEMENT OF WORK_Rev3. 12AUG2026.pdfThe current statement of work (Rev 3, August 12, 2026) reinstated by Amendment A00005; you must read it and price to it. Pages 11 to 19 were not provided. Read in part (pages 1–10 and 20–25 of 25).
- ATTACHMENT 2_ STATEMENT OF WORK.pdfThe April 2026 statement of work (rev 2), now superseded by Rev 3; read it only for history and do not price from it. Read in part (pages 1–10 and 20–24 of 24).
- Atttachment 7 - Responses to Questions_12AUG2026.pdfThe government's answers to vendor questions, which change the scope and terms; read it in full before pricing. Read.
- 70Z08526RRJ001B00 Amendment A00004.pdfAmendment 4 moved the closing date to 12PM EST on 12/01/2026; no action beyond meeting that date. Read.
- ATTACHMENT 1_ SCHEDULE OF SUPPLIES_rev.1dated 12AUG2026.xlsxThe current price schedule you must complete with unit prices for each line and ordering period, with the six-month option. Read.
- 70Z08526RRJ001B00 Amendment A00001.pdfAmendment 1 replaces erroneous attachments; no action is needed beyond using the corrected versions. Read.
- ATTACHMENT 1_ SCHEDULE OF SUPPLIES_rev2 11-18-2026.xlsx Could not be read.
- ATTACHMENT 4_PAST PERFORMANCE INFORMATION FORM.docxA form you must fill in for one to three past contracts that match the scope of this work. Read.
- ATTACHMENT 3_REQUEST FOR CLARIFICATION FORM.pdfA blank form for vendor questions; the question period has closed, so you do not need to submit it. Read.
- 70Z08526RRJ001B00 Amendment A00002.pdfAmendment 2 moved the closing date to 09/17/2026; this date is superseded by later amendments. Read.
- ATTACHMENT 5_JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION.pdf Not read: over our length limit.
- 70Z08526RRJ001B00 Amendment A00003_12AUG2026.pdfAmendment 3 released the answers, Rev 3 statement of work, Rev 1 schedule, and an example report; read it and sign if required. Read.
- Solicitation_70Z08526RRJ001B00.pdfThe main solicitation, read in part (pages 1 to 10 and 50 to 56); it sets sole-source terms, submission rules, and evaluation, and you must read pages 11 to 49 yourself. Read in part (pages 1–10 and 50–56 of 56).
- ATTACHMENT 6_WAGE DETERMINATION.pdf Not read: over our length limit.
- 70Z08526RRJ001B00 Amendment A00005.pdfThe latest amendment: it changes line items, reinstates the Rev 3 statement of work and Rev 1 schedule, and confirms the deadline; you must read it and sign if required. Read.
- ATTACHMENT 2_ STATEMENT OF WORK_NDI PROPOSED REV4_18NOV2026.pdfNDI's proposed Rev 4 from November 18, 2026, which Amendment A00005 replaces; do not price from it. Read in part (pages 1–10 and 20–24 of 24).
Not stated in what we read
- Estimated total value: Not stated. The schedule totals show 0.
- Correct ordering period dates: SOW Rev 3 says Nov 24, 2026, Section G says 10/27/2026, and the award was expected on or about October 26, 2026.
- Wage rates and the Attachment 5 justification: Attachment 6 and Attachment 5 were not included, so you must read them.
- Where the repair work is done: Not stated. SAM says Baltimore, MD, the SOW says contractor facilities, and the Q&A says Germany.
- Insurance, bonding, and required licenses: Not stated in the text we could review.
- Contents of Schedule of Supplies Rev 2 (dated 11-18-2026): this file could not be read, and Amendment A00005 says it is replaced by Rev 1.
Notice text
A00001_posted 07/23/2026 A00002_posted 08/03/2026 A00003_posted 08/12//2026 A00004_posted 08/24/2026 A00005_posted 11/19/2026 The United States Coast Guard (USCG) Long Range Enforcer Product Line (LREPL) has a service acquisition contract for repair services for the AN/SPS-75 Air Search Radar System. These services are essential to maintaining the radar system in a fully mission-capable status, ensuring operational readiness and reliability for critical air search and detection functions. The vendor will be responsible for disassembly, inspection, condition and test reporting, repairs, reassembly, testing, preservation, packaging, packing, and marking of the AN/SPS-75 Air Search Radar System. Northern Defense Industries, LLC (NDI) is the only U.S. authorized repair vendor that provides this service for the critical radar components.
As published on SAM.gov.
Contacts
- Tatiana Sher, Tatiana.Sher1@uscg.mil, 5716133126
- Mark Cap, mark.cap@uscg.mil
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at U.S. Coast Guard for the same kind of work (NAICS 811210, service code J059) in Maryland that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Open Inspect Repair of HF Comm SystemRohde & Schwarz USA, Inc. · 70Z08526P39015B00 | $285,120 | Aug 2, 2026ended | MD |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 20, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 1, 12:00 PM ET6 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 811210, electronic and precision equipment repair and maintenance, soonest deadline first.
- Department of the NavyEvaluate and repair three CAMS units, Panama City Beach, FL
- Department of the Air ForceFlat panel up front controller repair, Warner Robins, GA
- Department of Veterans AffairsNeptune rover maintenance at Bay Pines and Cape Coral, FL
- National Institutes of HealthFlow cytometer service and repairs, Bethesda, MD
- Indian Health ServiceBody plethysmograph maintenance and repair, Lawton, OK
- Department of Veterans AffairsJ061 UPS and Battery Maintenance and Testing – Nashville VA Medical Center
- Department of Veterans AffairsNotice of Intent to Sole Source Rauland Nurse Call System Services
- National Institutes of HealthPreventive maintenance for two TracerLab units, Bethesda, MD
Free · at most one email a morning
Get new notices from US Coast Guard by email
Each morning we'll send the new solicitations and sources-sought notices from US Coast Guard, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy