- Opportunities
- Department of Homeland Security
- US Coast Guard
- 30326PR270000001
Carpet to vinyl plank flooring at Station Cortez, FL
The Coast Guard wants all carpet removed and about 2,887 sq. ft. of luxury vinyl plank with vinyl base installed on the second deck of the Multipurpose Building at Station Cortez, Bradenton, FL.
Official title: USCG Station Cortez Carpet Removal and Luxury Vinyl Plank (LVP) Flooring Installation
- Deadline
- Dec 22, 1:00 PM ET
- 32 days left
- Who can bid
- Small businesses
- Size standard for NAICS 238330: $19 million in average annual receipts · Who qualifies
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Bradenton, FL
- Buyer: Base Miami Beach
What they're buying
Work must start within 15 calendar days after award and reach final inspection within 45 calendar days, and only small businesses may bid.
Top catches
“U.S. Department of Labor Wage Determination: Manatee County, Florida” Notice text
The Manatee County wage determination is attached, but our extraction of it is garbled, so we could not review it. You must read it on SAM.gov and price the labor rates it sets before you submit.
“Past Performance References: At least two (2) references for recent, similar flooring/commercial renovation projects executed within the last three (3) years.” Notice text
Section 4.4 says you must submit at least two recent references to be deemed responsive. The evaluation factors, however, give a neutral rating to offerors with no relevant past performance. If you have no references, ask the Contracting Officer before you submit whether a quote without them will be considered.
Read by AI (Claude Haiku) on Nov 20, 2026 from the notice and 2 of 2 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Remove all carpet in crew berthing, administrative offices and the Communication Watchstander room, about 2,887 sq. ft.
- Supply and install Lux Wood Cheyenne 7.25 x 48 inch LVP, 20 mil wear layer, 5 mm core, 1.55 mm pad.
- Supply and install 4-inch coiled vinyl base throughout all finished areas.
- Grind the subfloor and remove old adhesive. Subfloor must be clean, level, dry and inspected before installation.
- Install dust and noise containment to isolate adjacent active spaces. Remove scrap, old carpet and debris off-site daily.
- Confirm all interior doors swing freely over the new floor. Provide a written safety plan under FAR 52.236-13 and OSHA 29 CFR 1926.
Who supplied it lately
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Wage determination file unreadable. The Manatee County wage determination is attached, but our extraction of it is garbled, so we could not review it. You must read it on SAM.gov and price the labor rates it sets before you submit.
- References may decide responsiveness. Section 4.4 says you must submit at least two recent references to be deemed responsive. The evaluation factors, however, give a neutral rating to offerors with no relevant past performance. If you have no references, ask the Contracting Officer before you submit whether a quote without them will be considered.
- Subfloor risk falls on you. The scope of work says the price assumes subfloors are in good condition and excludes hidden conditions. Inspect the floors before you price the grinding, and expect work to stop if lead or asbestos is found.“Pricing assumes existing sub floors are in good condition.” STA CORTEZ CARPET SOW.pdf, page 3
- Email subject line must match. Your email subject must follow the exact format in section 4.2, with the project name Station Cortez 2nd Deck Carpet Replacement. The notice warns that wrong subjects cause severe delays, so copy the format exactly and add your legal company name in parentheses.“Inquiries and proposals without the exact subject line formats may experience severe processing and response delays” Notice text
- Permit fee responsibility conflicts. The scope excludes permit fees and bonding, but the administration section requires you to obtain all permits without additional expense to the government. Ask the Contracting Officer who pays permit fees before you price the job.“without additional expense to the government” STA CORTEZ CARPET SOW.pdf, page 7
- Short window with no weekend or holiday work. Work is allowed only Monday to Friday, 8:00 AM to 4:00 PM, and federal holidays are excluded. Count only working days inside the 45 calendar day window when you plan your schedule.“No weekends or federal holidays authorized.” Notice text
Key terms
| Who can bid | Small businesses only100% total small business set-aside. Size standard $19.0 Million under NAICS 238330.Notice text |
|---|---|
| Contract period | Within 45 calendar days after awardWork must start no later than 15 calendar days after award and reach final inspection within 45 calendar days.Notice text |
| How they choose | Best value trade-off: technical approach, past performance and priceTechnical and past performance together are significantly more important than price. The Government may pay more than the lowest price.Notice text |
| How to submit | Email to Ulric.Waldron@uscg.mil, copy Adam.L.Muniz@uscg.milUse the exact proposal subject line in section 4.2. Telephone or verbal quotes are not accepted.Notice text |
| Questions due | Tuesday, December 15, 2026, 1:00 PM ESTEmail questions to the Contracting Officer and the Station EPO using the question subject line format.Notice text |
| Estimated value | About $60,000Stated only in the scope of work file. The notice itself gives no value.STA CORTEZ CARPET SOW.pdf, page 3 |
| Contract type | Firm-fixed-priceYou quote one fixed total that must break out labor, materials, subfloor prep and debris disposal.Notice text |
| Site visit | Tuesday, December 8, 2026, 9:00 AM EST (organized visit)Prior coordination with MKC Adam Muniz is required for gate access and escort. The scope document calls the visit recommended.Notice text |
How to respond
- Email questions by Tuesday, December 15, 2026 at 1:00 PM EST to Ulric.Waldron@uscg.mil and Adam.L.Muniz@uscg.mil, using the question subject line in section 4.2.
- Before the December 8 site visit, contact MKC Adam Muniz at Adam.L.Muniz@uscg.mil to arrange gate access and an escort.
- Prepare a firm-fixed-price schedule covering labor, LVP, adhesive, baseboards, subfloor prep and debris disposal. Add your technical approach, key personnel, safety plan, two past performance references, and your legal name, TIN/EIN, CAGE code and UEI. Confirm your SAM registration is active.
- Email the quote by 1:00 PM EST on Tuesday, December 22, 2026 to Ulric.Waldron@uscg.mil with a copy to Adam.L.Muniz@uscg.mil. Use the subject [PROPOSAL SUBMISSION] [30326PR270000001] - [Station Cortez 2nd Deck Carpet Replacement] (your legal name). Hand or courier delivery must reach USCG Base Miami Beach (P&C), Attn: Ulric Waldron, 16001 SW 117th Avenue, Miami, FL 33177 before the same time. Acknowledge all amendments in your quote.
Attached files
- STA CORTEZ CARPET SOW.pdfThe scope of work with exclusions, subfloor pricing assumptions, permit rules and site visit terms. You must read it. It does not ask for a signed form. Read.
- SAM WDOL.pdfThe Manatee County wage determination. The text we extracted is garbled and we could not review it, so you must read the original on SAM.gov before pricing labor. Read.
Not stated in what we read
- The labor rates in the Manatee County wage determination, because the attached file could not be read.
- Who pays permit fees and bonding, since the scope excludes them but the administration section says permits are at no cost to the government.
- Whether the $2.75 per sq. ft. subfloor figure is a price cap, a benchmark or a payment rate.
- Who pays for lead or asbestos testing and abatement, and how any added cost would be priced.
- Whether the December 8 site visit is required. The notice calls it organized, while the scope calls it recommended.
Notice text
COMBINED SYNOPSIS / SOLICITATION FOR COMMERCIAL SERVICES Solicitation Number: 30326PR270000001 Project Title: USCG Station Cortez 2nd Deck Carpet Removal and Luxury Vinyl Plank (LVP) Flooring Installation Issuing Agency: United States Coast Guard (USCG) – Base Miami Beach (P&C) Notice Type: Combined Synopsis / Solicitation Set-Aside Status: 100% Total Small Business Set-Aside Applicable NAICS Code: 238330 – Flooring Contractors Small Business Size Standard: $19.0 Million Contract Type: Firm-Fixed-Price (FFP) Acquisition Authority: FAR Subpart 12.6 (Streamlined Procedures for Evaluation and Solicitation for Commercial Items), FAR Part 13 (Simplified Acquisition Procedures), and FAR Part 15 1. General Notice & Acquisition Overview This document constitutes a combined synopsis/solicitation for commercial services and minor facility improvements prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. Sole Solicitation: This announcement constitutes the only solicitation; no separate written solicitation will be issued. Set-Aside: The solicitation is advertised as a 100% Total Small Business Set-Aside. Offers received from entities other than small business concerns will not be considered. Basis of Award: Award will be made using simplified acquisition procedures to the responsible offeror whose quote conforms to all solicitation requirements and represents the Best Value to the Government, considering technical approach, past performance, and price. Performance Requirement: The contractor shall provide all management, tools, equipment, materials, labor, and supervision required to remove existing carpet and install new Luxury Vinyl Plank (LVP) flooring and vinyl base molding across approximately 2,887 sq. ft. on the 2nd Deck of the Multipurpose Building at USCG Station Cortez. 2. Key Procurement Schedule & Contacts Organized Site Visit December 08, 2026 @ 9:00 AM EST Location: USCG Station Cortez, Bradenton, FL. Coordination POC: MKC Adam Muniz, Station EPO Email: Adam.L.Muniz@uscg.mil (Prior coordination required for gate access and escort). Questions Deadline December 15, 2026 @ 1:00 PM EST Submit via email to the Contracting Officer and EPO using the mandatory email subject format below. Proposal Submission Deadline December 22, 2026 @ 1:00 PM EST Electronic submission via email to the Contracting Officer. Period of Performance Within 45 calendar days post-award Work to commence no later than 15 calendar days post-award and reach final inspection within 45 calendar days. Authorized Work Hours Mon – Fri, 0800 – 1600 (8:00 AM – 4:00 PM EST) Work outside these hours requires prior written authorization from the Station EPO. No weekends or federal holidays authorized. Points of Contact Contracting Officer / Contract Specialist (Contractual & Submission Inquiries): Ulric Waldron, Contracting Officer / Specialist Email: Ulric.Waldron@uscg.mil Mailing / Delivery Address: Commanding Officer USCG Base Miami Beach (P&C) Attn: Ulric Waldron 16001 SW 117th Avenue Miami, FL 33177 Technical Point of Contact / Station EPO (Site Visit & Technical Inquiries): MKC Adam Muniz, Engineering Petty Officer (EPO) USCG Station Cortez Email: Adam.L.Muniz@uscg.mil 3. Place of Performance Facility: USCG Station Cortez Building: Multipurpose Building (2nd Deck) Physical Address: 4530 124th St. Ct. W. Bradenton, FL 34209 4. Proposal Submission Instructions 4.1 Submission Methods & Protocols Electronic Submission (Preferred): Quotes must be submitted electronically via email to Ulric.Waldron@uscg.mil and carbon-copy (CC) Adam.L.Muniz@uscg.mil. Telephone or verbal quotes will not be accepted. Mail / Hand Delivery: Hand-delivered or courier submissions must arrive at USCG Base Miami Beach (P&C), Attn: Ulric Waldron, 16001 SW 117th Avenue, Miami, FL 33177 prior to 1:00 PM EST on December 22, 2026. Amendments: Formal amendments and notices of changes will be published via SAM.gov. Offerors must acknowledge all amendments in their quotation. 4.2 Mandatory Email Subject Formatting Inquiries and proposals without the exact subject line formats may experience severe processing and response delays: Proposal Submission Subject Format: [PROPOSAL SUBMISSION] [30326PR270000001] - [Station Cortez 2nd Deck Carpet Replacement] ([Company Name]) Question / Clarification Subject Format: [QUESTION SUBMISSION] [30326PR270000001] - [Station Cortez 2nd Deck Carpet Replacement] ([Company Name]) (Note: Replace [Company Name] with your organization's legal name inside the parentheses). 4.3 Vendor Administrative Requirements Entity Identification: Offerors must provide their legal business name, Taxpayer Identification Number (TIN/EIN), CAGE code, and Unique Entity Identifier (UEI). Active SAM Registration: Offerors must maintain an ACTIVE registration in SAM.gov at the time of proposal submission, prior to award, and throughout performance. NAICS Registration: Offerors should have NAICS code 238330 (Flooring Contractors) or related construction/renovation NAICS listed on their SAM profile. 4.4 Proposal Package Content Requirements To be deemed responsive, offerors must submit: Price Quote: A completed firm-fixed-price schedule breaking down labor, materials (LVP, adhesive, baseboards), subfloor preparation/grinding, and debris disposal. Technical Approach: Narrative demonstrating understanding of the Scope of Work (SOW), dust containment plan, installation methodology per manufacturer specifications, and estimated project schedule. Key Personnel Information: Identification of the Project Manager (PM) and designated alternate(s) including contact details and qualifications. Safety Plan: Written safety plan in compliance with FAR 52.236-13 and OSHA standards (29 CFR 1926). Past Performance References: At least two (2) references for recent, similar flooring/commercial renovation projects executed within the last three (3) years. 5. Scope of Work & Technical Specifications Summary 5.1 Project Scope & Coverage The contractor shall remove all carpet and install Luxury Vinyl Plank (LVP) flooring on the 2nd Deck of the Multipurpose Building at USCG Station Cortez, encompassing approximately 2,887 square feet. Areas covered include: Crew berthing spaces Administrative offices Communication Watchstander room Exclusions: This scope does not include upgrades to unrelated building systems, existing LPV spaces in sound condition, or bathroom flooring. 5.2 Material and Installation Specifications Flooring Material: Supply and install Lux Wood Cheyenne 7.25" x 48", 20 Mil Wear Layer / 5mm Core, with 1.55mm Pad LVP (approx. 2,887 sq. ft.). Baseboard: Supply and install 4-inch Coiled Vinyl Base throughout all finished areas. Subfloor Preparation: Complete mechanical grinding and adhesive removal on existing subfloors (allowance benchmark not to exceed $2.75/sq. ft.). Subfloor must be clean, level, dry, and inspected prior to installation. Adhesive: Utilize commercial adhesive strictly complying with the flooring manufacturer’s bonding specifications and DHS facility environmental guidelines. Debris & Containment: Install temporary dust and noise containment barriers to isolate adjacent active operational spaces. Contractor is responsible for removing all scrap, old carpet, adhesive residue, and packaging off-site daily. Clearance & Inspection: Ensure all interior doors swing freely with full functional clearance over new flooring transitions. 5.3 On-Site Conditions, Security & Personnel Requirements Key Personnel: The designated Project Manager must serve as the primary technical point of contact, be available by phone/email during duty hours (0800–1600 EST), and respond to technical requests within two (2) hours. Base Security & Badging: All workers must possess valid state-issued photo IDs, wear company-identifiable attire/badges at all times, and remain escorted in Government spaces as required. A consolidated roster of personnel must be submitted prior to commencement. Vehicles: All vehicles entering Station Cortez are subject to inspection and must possess valid state registration. Delays at security gates will not constitute grounds for additional Government compensation. Environmental & Hazardous Materials: If suspected lead-based paint or asbestos-containing materials (ACM) are encountered during demolition, work must halt immediately in that area, the COR notified, and certified testing/abatement performed in accordance with EPA and OSHA standards (29 CFR 1926.62 and 1926.1101). 6. Evaluation and Basis for Award Award will be made to the responsible offeror whose quote conforms to the solicitation and represents the Best Value to the Government, using a trade-off process in accordance with FAR Part 13 and FAR Part 15. The Government will evaluate proposals based on the following three evaluation factors: Factor 1 – Technical Approach & Qualifications: The Government will evaluate the offeror's technical proposal to assess demonstrated understanding of the SOW, soundness of installation and containment methodologies, equipment and staffing capabilities, safety planning, and qualifications of the designated Key Personnel (Project Manager). Factor 2 – Past Performance: The Government will evaluate the recency, relevance, and quality of the offeror’s past performance on similar commercial flooring removal and installation contracts. The evaluation will assess customer satisfaction, timeliness, and workmanship quality. Offerors with no relevant past performance will receive a neutral rating. Factor 3 – Price: The proposed Firm-Fixed-Price will be evaluated for completeness, price reasonableness, and realism relative to the technical approach. Relative Importance of Factors: Technical Approach (Factor 1) and Past Performance (Factor 2), when combined, are significantly more important than Price (Factor 3). As proposals become more equal in their technical merit and past performance ratings, proposed price will become more decisive in the award decision. The Government reserves the right to make an award to other than the lowest-priced offeror if the superior technical capability or past performance justifies the price premium. 7. Applicable Clauses, Provisions, and Wage Determinations 7.1 Federal Acquisition Regulation (FAR) Provisions & Clauses (Incorporated by Reference and Full Text) 52.204-7 System for Award Management 52.204-13 System for Award Management Maintenance 52.212-1 Instructions to Offerors — Commercial Items (Deviation 2018-O0018) 52.212-2 Evaluation — Commercial Items 52.212-3 Offeror Representations and Certifications — Commercial Items 52.212-4 Contract Terms and Conditions — Commercial Items 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders — Commercial Items 52.222-21 Prohibition of Segregated Facilities 52.222-26 Equal Opportunity 52.222-35 Equal Opportunity for Veterans 52.222-36 Equal Opportunity for Workers with Disabilities 52.222-37 Employment Reports on Veterans 52.222-41 Service Contract Labor Standards 52.222-62 Paid Sick Leave Under Executive Order 13706 52.222-90 (Addressing DEI Discrimination by Federal Contractors) In accordance with Executive Order (E.O.) 14398 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving 52.236-13 Accident Prevention (Safety and Health Standards per 29 CFR Part 1926) 52.237-1 Site Visit Full text of FAR clauses is accessible electronically at acquisition.gov/far. 7.2 Homeland Security Acquisition Regulations (HSAR) Clauses HSAR 3052.209-70 Prohibition on Contracts with Corporate Expatriates HSAR 3052.212-70 Contract Terms and Conditions Applicable to DHS Acquisition of Commercial Items HSAR 3052.237-72 Contracting Officer’s Technical Representative (COTR / COR) Full text of HSAR clauses is accessible electronically at dhs.gov. 7.3 Applicable Wage Determination U.S. Department of Labor Wage Determination: Manatee County, Florida (applicable Service Contract / Construction Wage Determination revision in effect at the time of solicitation closing).
As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.
Contacts
- Ulric Waldron, Ulric.Waldron@uscg.mil, 2068151487
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 20, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Similar open notices
Open now under NAICS 238330, flooring contractors, soonest deadline first.
- Forest ServiceFloor and joist repair at Ashe Nursery, Brooklyn, MS
- Department of Veterans AffairsFlooring Replacement Services CTXVA
- Department of the Air ForceCarpet Replacement Building 606
- Agricultural Research ServiceEpoxy floor recoating in USDA lab, Wyndmoor, PA
- Department of the Air ForceFlooring removal and installation at Grand Forks AFB, ND
- Department of the NavyFlooring Installation and Repainting
- National Oceanic and Atmospheric AdministrationPaint, carpet and restrooms at Slidell weather office, LA
- US Coast GuardBasketball court refinishing, Coast Guard Academy, CT
Free · at most one email a morning
Get new notices from US Coast Guard by email
Each morning we'll send the new solicitations and sources-sought notices from US Coast Guard, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy