1. Opportunities
  2. Department of Defense
  3. Department of the Navy
  4. N5005427Q0019

Expansion joint and hardware kit for USS Stout, Norfolk, VA

The Mid-Atlantic Regional Maintenance Center wants one new expansion joint and one hardware kit for the 2A gas turbine module flow liner on USS Stout (DDG-55), delivered to Norfolk, VA by 2/14/2027 or best possible.

Official title: USS STOUT (DDG-55) Expansion Joint Parts

Deadline
Dec 3, 1:00 PM ET
7 days left
Who can bid
Small businesses
Size standard for NAICS 332919: 750 employees · Who qualifies
Last time
$227K
Likely Custom Hydraulic & Machine, Inc.
Place
Not stated
Buyer: Mid Atlantic Reg Maint Ctr

What they're buying

It is a small-business set-aside, and quotes are due Thursday, December 3, 2026 at 1:00 pm EST.

Top catches

Drawings need JCP approval first
“If you do not have an active certification, you must apply using the new JCP External Portal. Emailed or mailed applications are no longer accepted.” Combined Synopsis Solicitation A0001.docx

Drawings are released only after JCP approves your DD Form 2345 and you send a copy to MARMC. Apply in the JCP portal, not by email, since the form's instructions say to email a PDF and the notice says emailed applications are no longer accepted.

Technical and price quotes separate
“The price quote must be submitted as a separate document from the technical capability statement.” Combined Synopsis Solicitation A0001.docx

Keep prices out of the technical quote, which must be unpriced. Put all prices only in the separate price file.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 26, 2026 from the notice and 4 of 4 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • 1 each expansion joint, Inconel flange, liner and bellows, 304 CRES shroud and fasteners, part DMEX2/EX001, drawing 259-6595724 Rev W
  • 1 kit for part 37915D (5-KIT-37915D, drawing 37915 Rev L): for each flange, 80 hex bolts 3/8 x 1-1/2 in, 80 hex nuts 3/8-16UNC-2B, 1 gasket with 4 intralock segments
  • All parts must be new. Refurbished or used parts will not be accepted.
  • Deliver FOB Destination to DLA Distribution Norfolk RMC PROJ, Bunker Hill Towaway Bldg. X136, Norfolk, VA 23511. Shipping cost must be included in the quote.
  • Notify Allison Harding of ship date and tracking at allison.k.harding.civ@us.navy.mil.

Who supplied it lately

$227K

on a recent contract for the same kind of product: Custom Hydraulic & Machine, Inc.. It ends Dec 2, 2026.

Matched in USAspending.gov by agency, NAICS and product code; notices rarely name the supplier.

What to watch for

  • Drawings need JCP approval first. Drawings are released only after JCP approves your DD Form 2345 and you send a copy to MARMC. Apply in the JCP portal, not by email, since the form's instructions say to email a PDF and the notice says emailed applications are no longer accepted.
  • Technical and price quotes separate. Keep prices out of the technical quote, which must be unpriced. Put all prices only in the separate price file.
  • Questions close in four days. Questions are due Monday, November 30, 2026, 5:00 pm EST. Send any questions now, since later questions may not be answered.“Any questions received after this date may not be answered.” Combined Synopsis Solicitation A0001.docx
  • SAM and SPRS must be current. Your SAM.gov registration must be active when you submit your quote. Your NIST assessment must also be current in SPRS before you apply for JCP approval, so check both now.“Ensure all prerequisites are met before applying, including an active SAM.gov registration and a current NIST assessment in SPRS, as detailed in the instructions.” Combined Synopsis Solicitation A0001.docx
  • Delivery date is not firm. The date is 2/14/2027 or best possible, so the notice does not fix it. Give your real lead time for each part, since delivery capacity is an evaluation factor.“Required Date of Delivery: 2/14/2027 or best possible” Attachment I Statement of Work Rev1.pdf, page 1
  • Referenced specs not provided. All material must meet references 2.3 and 2.4 of work spec item 259-13-001. Those references are not in the attachments we reviewed, so ask the contact for them before you price.“All material to be in accordance with references 2.3 and 2.4 of work spec item 259-13-001.” Attachment I Statement of Work Rev1.pdf, page 1

Key terms

Who can bidSmall businesses only (total set-aside)NAICS 332919, size standard 750 (unit not stated).SAM.gov record
Contract periodDelivery by 2/14/2027 or best possibleNo contract length is stated. This is the required delivery date.Attachment I Statement of Work Rev1.pdf, page 1
How they chooseBest value (technical, delivery, price)Technical quote must be Acceptable on every factor to be considered.Combined Synopsis Solicitation A0001.docx
How to submitEmail to Donald Bowers, as two separate filesTechnical quote and price quote must be separate documents.Combined Synopsis Solicitation A0001.docx
Questions dueMonday, 11/30/2026, 5:00 pm ESTSend questions by email to Donald Bowers.Combined Synopsis Solicitation A0001.docx
Contract typeCommercial items, simplified acquisition (FAR Part 13)Combined synopsis and solicitation. Paper copies will not be issued.Notice text

How to respond

  1. Confirm your SAM.gov registration is active and your NIST assessment is current in SPRS. If you need drawings, apply for JCP approval in the JCP External Portal first.
  2. Email an unpriced technical quote and capabilities statement to donald.r.bowers19.civ@us.navy.mil by Thursday, December 3, 2026, 1:00 pm EST. Include lead time for each part and your SAM update confirmation under FAR 52.204-26.
  3. Email a separate price quote in Microsoft Word, Excel or Adobe PDF to the same address. Include a fully burdened price for each part, FOB Destination shipping, your contact name, email and phone, business size for NAICS 332919, CAGE code and/or SAM UEI, payment terms, and a 60-day validity period.
  4. Send any questions to Donald Bowers at donald.r.bowers19.civ@us.navy.mil by Monday, 11/30/2026, 5:00 pm EST.
  5. After shipment, send the ship date and tracking number to Allison Harding at allison.k.harding.civ@us.navy.mil.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Estimated value or budget for this buy: Not stated.
  • Whether funds are available. The attached clause says funds are not presently available for this contract.
  • Whether the hardware kit covers one flange or two. The SOW lists components for each flange under one kit.
  • How long JCP approval takes, which decides when drawings can be released.
  • Name of the technical point of contact for the technical quote.
  • Contract length beyond the delivery date, and whether any options exist.

Notice text

*Amendment 0001: The purpose of Amendment 0001 is to correct and clarify the line items within the Statement of Work.* This is a COMBINED SYNOPSIS/SOLICITATION for commercial items prepared in accordance with the information in Federal Acquisition Regulation (FAR) Part 13 using Simplified Acquisition Procedures (SAP). This announcement constitutes the only solicitation; a written solicitation will not be issued. PAPER COPIES OF THIS SOLICITATION WILL NOT BE AVAILABLE.

This combined synopsis/solicitation will be posted to the System for Award Management at https://sam.gov/ and/or Procurement Integrated Enterprise Environment (PIEE) at https://piee.eb.mil. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR 12.6, as supplemented with additional information included in this notice. The RFQ number is N5005427Q0019. This solicitation documents and incorporates provisions and clauses in effect though FAC 2026-01 and the DFARS Change notice 20260507.

The Mid-Atlantic Regional Maintenance Center (MARMC) requests responses from qualified sources capable of providing the 2A Gas Turbine Module Flow Liner parts that are identified in the attached Statement of Work (SOW). All parts shall be new. No refurbished or used parts will be accepted.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

Who has supplied this lately

Contracts at Department of the Navy for the same kind of product (NAICS 332919, product code 4730) that end within a year either way of today. Notices rarely name the current supplier: these are likely candidates, not a fact.

ContractObligatedEndsState
Adapter, Straight, HoCustom Hydraulic & Machine, Inc. · N0010426PFA68$226,677Dec 2, 2026within a monthWA
Tee, RedPainter Tool Incorporated · N0010425PBR88$101,232Dec 8, 2026within a monthPA
Tank Vent ValvesTate Andale, LLC · N0040626P0117$115,471Dec 28, 2026in 1 monthNot stated
Elbow,90D1.OIN, NicuCogitic Corporation · N0010426PBN51$466,551Dec 31, 2026in 1 monthCO
Connection, FlexibleOil States Industries, Inc. · N0010424PYC29$430,033Jan 19, 2027in 1 monthTX

Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.

History

  • Nov 26, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Navy by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Navy, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy