- Opportunities
- Department of Energy
- 389116swk
Two solenoid magnet packages for Fermilab, Batavia, IL
Fermilab wants 2 solenoid magnet packages, each with a solenoid coil and two steering corrector magnets, priced firm-fixed and delivered to Batavia, IL.
Official title: WFE Solenoid/Corrector Magnet Spares
- Deadline
- Jan 5, 2027, 5:00 PM CT
- 40 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Batavia, IL
- Buyer: Fermilab - DOE Contractor
What they're buying
Work runs about 40 weeks after receipt of order, and proposals are due January 5, 2027.
Top catches
“Proposals Due: 5pm Central, December 9, 2026” Notice text
The notice text says proposals are due December 9, 2026. Amendment 01 and the RFP both say January 5, 2027. Plan to January 5, 2027 and do not rely on the notice text.
“Questions shall be submitted by 5pm Central, November 30, 2026.” RFP 389116swk Rev 1.pdf, page 2
Questions are due in 12 days. Send any open questions about the specifications, drawings or deadlines to Spencer Keske before then.
Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 3 of 5 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Design and build 2 solenoid magnet packages, each with a solenoid coil and two steering dipole correctors (horizontal and vertical).
- Solenoid: 6 double-pancake coils, maximum 300 A, maximum 6.5 kW, minimum 80 mm inner diameter, maximum 400 mm outer diameter.
- Paperwork: final design report, QC plans and reports, material certifications, production schedule and magnetic test reports.
- Factory acceptance tests on every magnet, including hipot, resistance, water flow and magnetic measurements.
- Serial numbers, NAL Blue paint and nameplates; crate and ship both units in one batch to Fermilab.
- Deliver both units about 36 weeks after receipt of order; site tests and closeout by week 40.
Who supplied it lately
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Notice text shows old due date. The notice text says proposals are due December 9, 2026. Amendment 01 and the RFP both say January 5, 2027. Plan to January 5, 2027 and do not rely on the notice text.
- Questions close November 30. Questions are due in 12 days. Send any open questions about the specifications, drawings or deadlines to Spencer Keske before then.
- Magnets that fail are rejected at your cost. Any magnet that fails FFDG's site tests is returned to you for repair at your expense. Build test time and repair risk into your price and schedule.“Magnets that fail these tests shall be rejected and returned to the Subcontractor for repairs at the Subcontractors expense.” WFE Solenoid SOW 389116swk.pdf, page 8
- Show in-house and subcontracted work. Amendment 01 allows lower-tier shops, but you must state which work you do and which is subcontracted, especially QC. Name each lower-tier shop and its role in your proposal.“we just need to know exactly what aspects of the proposal are in-house and what is being subcontracted out to lower tiers, especially in regard to the QC process.” RFP 389116swk Amendment 01.pdf, page 1
- Award weighting is unclear. The RFP gives three possible weights for non-price factors in one sentence. Ask FFDG to confirm how much technical factors outweigh price before you decide how sharply to price.“All evaluation factors other than cost or price, when combined, are significantly more important (approximately equal to or significantly less important) than cost or price.” RFP 389116swk Rev 1.pdf, page 2
- Past contract list is required. Your proposal must list 3 contracts from the past 5 years of about the same dollar size. Gather client names, contacts and amounts before you start, or your experience score will likely suffer.“A list of 3 contracts completed in the past 5 years that have been awarded to the Subcontractor of approximately the same dollar magnitude as the FFDG proposal and are as similar as possible in nature to the requirements covered by this SOW.” WFE Solenoid SOW 389116swk.pdf, page 13
Key terms
| Contract period | About 40 weeks after receipt of orderBoth units are due for delivery at week 36. Site tests and closeout end at week 40. The schedule is preliminary.WFE Solenoid SOW 389116swk.pdf, page 8 |
|---|---|
| How they choose | Best value trade-off, awarded without discussionsThe technical proposal ranks first, then price. FFDG may award to a higher-priced offer.RFP 389116swk Rev 1.pdf, page 2 |
| How to submit | Delivery method not stated. Include the RFP page, SARC and PROC-FRM-466.Contact Spencer Keske, Procurement Specialist III, at skeske@fnal.gov or 630-840-3323.RFP 389116swk Rev 1.pdf |
| Questions due | 5pm Central, November 30, 2026Send questions to Spencer Keske at skeske@fnal.gov.RFP 389116swk Rev 1.pdf, page 2 |
| Contract type | Firm-fixed price, FOB FermilabNet 30 payment terms are listed. Exceptions and extra charges must be clearly marked.RFP 389116swk Rev 1.pdf, page 1 |
How to respond
- Read the amendment, the RFP and the SOW in full. Use January 5, 2027 as the due date, not the December 9 date in the notice text.
- Send any questions to Spencer Keske at skeske@fnal.gov by 5pm Central, November 30, 2026.
- Acknowledge Amendment 01 before the due date by completing the SARC and PROC-FRM-466, or by email.
- Submit by 5pm Central, January 5, 2027. Where and how to send it: Not stated. Include the completed RFP page with unit and total firm-fixed prices, the SARC if not completed in the last year, PROC-FRM-466, and the SOW Section 10 items.
Attached files
From SAM.gov. Download links open the original files.
- RFP 389116swk Amendment 01.pdfAmendment 01 moves the due date to January 5, 2027 and answers a question on lower-tier shops. You must acknowledge it before the due date. Read.
- F00484505---DWG1.pdf Scanned image, not read.
- RFP 389116swk Rev 1.pdfThe request for proposal with the pricing page, submission rules and evaluation criteria. You must complete the pricing page and return it with the required forms. Read.
- WFE Solenoid SOW 389116swk.pdfThe statement of work that defines the magnets, tests, schedule and the technical proposal content. You must read it and price to it. No form to sign. Read.
- F10009710_-_PDF_1.pdf Scanned image, not read.
Not stated in what we read
- Estimated value or budget for the two magnet packages.
- How proposals are delivered (email, portal or mail).
- What drawings F00484505 and F10009710 show. They are scanned files that could not be read here, so you must review them on SAM.gov.
- Whether magnetic measurements are required on both units. The SOW says they may not be required and gives no clear rule.
- Set-aside status and any bidder eligibility rules. The SAM.gov record says Not stated.
- Relative weight of each evaluation factor. The RFP gives conflicting wording.
Notice text
Please see attached for Fermilab RFP# 389116swk and associated documentation. Please ensure that you review the RFP document fully, as it outlines how to submit a complete proposal package. Important information related to this RFP: Proposals Due: 5pm Central, December 9, 2026 Question Due Date: 5pm Central, November 30, 2026 This is a Best Value with Trade-Off source selection. Please review the RFP document for more information Please reach out with any questions or comments pertaining to this RFP, thank you.
As published on SAM.gov.
Contacts
- Spencer Keske, skeske@fnal.gov
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 18, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Jan 5, 2027, 5:00 PM CT40 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 332999, all other miscellaneous fabricated metal product manufacturing, soonest deadline first.
- Defense Logistics AgencyEngine electric starters for DLA depots
- Defense Logistics Agency14 ARM units for DLA depots, CONUS and OCONUS
- Defense Logistics AgencySplash guard rods for DLA depots, 135 each
- Defense Logistics AgencyFriction lining, 448 each, for W1A8 DLA Distribution
- Defense Logistics AgencyDirect shock absorbers, 96 each
- Defense Logistics AgencyBell cranks for DLA Distribution Depot Hill
- Defense Logistics Agency16 nonmetallic hoses for 148 FW LRS
- Defense Logistics Agency26 vehicle fender liners for DLA depots, US and overseas
Free · at most one email a morning
Get new notices from Department of Energy by email
Each morning we'll send the new solicitations and sources-sought notices from Department of Energy, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy