Structural repair of B1134 post and wall, Tinker AFB, OK

Repair of the eroded base of Post 34 and the eroded shear braces on the north wall of building B1134 at Tinker Air Force Base, Oklahoma.

Official title: WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL

Deadline
Dec 15, 12:00 PM ET
20 days left
Who can bid
Small businesses
Size standard for NAICS 238190: $19 million in average annual receipts · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Tinker AFB, OK
Buyer: FA8137 AFSC Pzioc

What they're buying

The estimated value is $100,000 to $250,000, work must finish within 195 calendar days of notice to proceed, and funds are not yet available.

Top catches

Site visit dates have passed
“You must attend the Initial Site Visit for the project to be considered eligible to propose.” Notice text

The notice says you must attend the initial site visit to be eligible to propose, but the RSVP date of October 20, 2026 and the visit date of October 22, 2026 are before today. Email the contracting office now and ask whether a new RSVP date and visit exist before you spend time on this bid.

Deadline time zone does not match
“Response deadline: 2026-12-15T12:00:00-05:00” SAM.gov record

The SAM record says 12:00 PM at -05:00, but the notice text says 12PM CST on Tuesday, December 15, 2026. Plan to meet the earlier cutoff in real time and ask the contracting office to confirm which time applies.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 30 of 35 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Repair or replace the eroded base of Post 34 and the eroded shear braces on the north wall of B1134.
  • Do your own site investigation and field-check existing conditions. Government as-built and utility data is approximate.
  • Furnish all materials, labor, plant, tools, transportation, equipment, testing and quality control.
  • Submit a baseline design and construction schedule in Microsoft Project within 10 calendar days of notice to proceed.
  • Submit a quality control plan within 15 days after notice to proceed.
  • Prepare a DD Form 1354 and closeout paperwork at the end of the job.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Site visit dates have passed. The notice says you must attend the initial site visit to be eligible to propose, but the RSVP date of October 20, 2026 and the visit date of October 22, 2026 are before today. Email the contracting office now and ask whether a new RSVP date and visit exist before you spend time on this bid.
  • Deadline time zone does not match. The SAM record says 12:00 PM at -05:00, but the notice text says 12PM CST on Tuesday, December 15, 2026. Plan to meet the earlier cutoff in real time and ask the contracting office to confirm which time applies.
  • Paving and earthwork scope unclear. Appendix B lists earthwork and paving sections, including asphalt milling, crack sealing and non-airfield paving, but the scope text you can read covers only the post and north wall. Ask whether these items are priced in this order before you estimate.“Division 32 - Exterior Improvements” Att.8_260004_MACB_SOW.pdf, page 19
  • Design may be required after award. The included design spec says the accepted proposal is developed into a completed design after award, with a Designer of Record. If you have no design staff, ask whether design is part of this order before you bid.“After award, develop the accepted proposal into the completed design, as described herein.” 01 33 16.00 10.pdf, page 1
  • Funds not yet available. The notice says funds are not presently available, and no payment obligation arises until the contracting officer confirms funding in writing. Your bid and site visit costs are at your own risk, so ask when funding is expected.“Funds are not presently available for this contract.” Solicitation - FA813727R0001.pdf, page 1
  • Base access requests need a sponsor. Subcontractors need a prime sponsor, and any Entry Access List must be hand-carried by the sponsor to Security Forces. Faxes, calls and emails are not accepted, so plan your personnel list early.“sponsors must hand-carry the EAL to the Security Forces Operations Section for authentication” 00 70 00.pdf, page 13

Key terms

Who can bidCurrent Tinker AFB MAC BOA holders only; small business set-asideSubcontractors need a prime contractor's sponsorship for base access. SAM record lists the set-aside as small business, total.Notice text
Contract periodStart within 10 calendar days; finish within 195 calendar days of notice to proceedThe form has a mandatory or negotiable check, and the text does not show which one is marked.Solicitation - FA813727R0001.pdf, page 1
How to submitSealed original plus 1 copy, delivered to the Item 8 office at Tinker AFBAddress: 7799 Arnold Ave, Bldg 3, first floor, Tinker AFB, OK 73145-9125. Electronic submission is not stated.Solicitation - FA813727R0001.pdf, page 1
Questions dueMonday, November 30, 2026, 12:00 PM CSTThis is the RFI due date from the 11/18 update.Notice text
Estimated value$100,000 - $250,000Magnitude of construction. Funds are not presently available.Solicitation - FA813727R0001.pdf, page 1
Contract typeRepair order open to current BOA holders onlyPricing type is not stated. The form has a bond question that is not clear in the text.Solicitation - FA813727R0001.pdf, page 1
Site visitMandatory; the listed dates have passedNotice gives an RSVP date of October 20, 2026 and a visit on October 22, 2026 at 10am CST at B1134.Notice text

How to respond

  1. Confirm you are a current Tinker AFB MAC BOA holder, or a subcontractor that a prime contractor will sponsor for base access.
  2. Email tamra.torres@us.af.mil and melanie.ivie@us.af.mil before 12:00 PM CST on Monday, November 30, 2026 to ask whether the October site visit still applies, whether the Appendix B paving work is in scope, and when funds will be available.
  3. If a site visit is confirmed, attend it and have your sponsor submit an Entry Access List for any personnel who need base access.
  4. Send the original and 1 copy of your sealed offer to FA8137 AFSC PZIOC, 7799 ARNOLD AVE BLDG 3 FIRST FLOOR, Tinker AFB, OK 73145-9125. Mark the envelope with your name and address, solicitation number FA813727R0001, and the due date and time.
  5. Due Tuesday, December 15, 2026 at 12:00 PM CST per the notice text, but the SAM record says 12:00 PM at -05:00, so deliver early. Required contents of the offer are not stated in the text provided.

Attached files

From SAM.gov. Download links open the original files.

  • 07 42 13.pdfMetal wall panels spec; read it in case the north wall work uses panels, part included. Read in part (pages 1–2 and 19 of 19).
  • COPY of Site Visit Sign-in Sheet_10.22.2026.pdf Scanned image, not read.
  • 32 01 16.pdfCold milling asphalt spec, paid by square yard; read it if paving is in scope. Read.
  • 10 44 16.pdfFire extinguisher spec; read only, and it probably does not apply to this repair. Read.
  • 32 01 17.pdfCrack sealing asphalt spec; read it if paving is in scope. Read.
  • 00 70 00.pdfGeneral requirements for construction on Tinker AFB covering badges, background checks, entry lists and traffic; read only. Read in part (pages 1–2 and 13–16 of 16).
  • 00 80 05.pdfSpecial provisions for work on or near the airfield, with closure requests due 45 days ahead; read it if any work is near a runway. Read.
  • Solicitation - FA813727R0001.pdfMain solicitation form (SF 1442), page 1 only; the offer section on the back must be completed and signed by you. Read in part (pages 1 of 34).
  • 10 14 00.10.pdfExterior signage spec; read only, part included, and it probably does not apply to this repair. Read in part (pages 1–2 and 10 of 10).
  • 00 80 00.pdfSpecial provisions for work on the base covering dewatering, haul routes, airfield rules, traffic control and winter recess; read only. Read.
  • 01 42 00.pdfList of standards publishing organizations and their addresses; reference only. Read.
  • 07 41 13.pdfMetal roof panels spec; read only, part included, and it probably does not apply to this repair. Read in part (pages 1–2 and 22 of 22).
  • 31 23 15.pdfExcavation, filling and backfill spec for buildings; read it for digging and backfill around the post, part included. Read in part (pages 1–4 of 5).
  • 00 72 00.pdfEnvironmental requirements for construction, including dust, waste and hazardous material forms; read only, part included. Read in part (pages 1–2 and 86–89 of 89).
  • 31 00 00.pdfEarthwork spec for excavation and fill; read it if the Appendix B earthwork work applies, part included. Read in part (pages 1–3 of 5).
  • 01 33 16.00 10.pdfDesign-after-award rules with a Designer of Record; read it to check whether design work applies to this order. Read in part (pages 1–2 and 30 of 30).
  • 03 30 00.pdfCast-in-place concrete rules, including crack repair and core testing that may apply to the post base; read it, part included. Read in part (pages 1–2 and 43 of 43).
  • 06 10 00.pdfRough carpentry spec; read only, part included, and it probably does not apply to this repair. Read in part (pages 1–3 and 31 of 31).
  • 09 90 00.pdfPaints and coatings spec with paint tables; read only, part included. Read in part (pages 1–3 and 33 of 33).
  • 00 71 00.pdfGeneral safety requirements for construction on the base, with airfield rules and entry list forms; read it, and complete entry forms only if access is needed. Read in part (pages 1–2 and 9–18 of 18).
  • 01 78 23.pdfOperation and maintenance data and training rules; read only, part included. Read in part (pages 1–2 and 13–14 of 14).
  • Wage Determinations.pdf Not read: over our length limit.
  • 01 45 00.00 10.pdfQuality control plan rules, with the plan due 15 days after notice to proceed; read it and prepare this plan. Read in part (pages 1–2 and 12 of 12).
  • 000_TABLE OF CONTENTS.pdfIndex of the base's general construction sections; read only for reference. Read.
  • Att.10_260004_Drawings.pdf Not read: over our length limit.
  • Att.9_260004_Submittal Register.pdf Not read: over our length limit.
  • 01 32 16.00 20.pdfSchedule rules requiring Microsoft Project schedules and a baseline schedule; read it, since you must deliver a schedule. Read in part (pages 1–2 and 9–10 of 10).
  • 01 78 00.pdfCloseout submittals including record drawings and a DD Form 1354; read it and plan the closeout paperwork. Read in part (pages 1–2 and 24–27 of 27).
  • 02 41 00.pdfDemolition and deconstruction rules, including a demolition plan approved before work starts; read it, part included. Read in part (pages 1–2 and 12 of 12).
  • 32 13 14.pdfNon-airfield pavement spec that adopts state highway standards; read it if paving is in scope. Read.
  • 32 01 14.pdfAsphalt pavement sealer spec naming two coal tar products or an approved equal; read it if paving is in scope. Read.
  • Att.8_260004_MACB_SOW.pdfStatement of work, pages 1 and 19 to 21 only; read it for the work scope and appendix lists, and nothing to fill in. Read in part (pages 1 and 19–21 of 21).
  • RFI QA RESPONSES - WWYK260004 - REPAIR STRUCTURAL INTEGRITY B1134 POST 34 NORTH WALL_COR.pdf Not read: over our length limit.
  • 01 33 00.pdfSubmittal procedures; read it, since you will prepare submittals for approval. Read in part (pages 1–2 and 18–21 of 21).
  • 01 50 00.pdfContractor facilities and staging area rules, with requests due 21 days before mobilization; read it and submit a request if you need staging. Read in part (pages 1–2 and 5–8 of 8).

Not stated in what we read

  • Whether the site visit is still required, and the new RSVP and visit dates if so, since the listed October dates have passed.
  • Evaluation factors, basis of award and proposal contents, because Section J was not in the text provided.
  • Whether performance and payment bonds are required; the form shows 10 calendar days after award, but the YES or NO mark is not readable.
  • We could not review the drawings, wage determinations, submittal register, RFI answers or the site visit sign-in sheet; you must read them on SAM.gov before pricing.
  • Whether electronic submission is allowed and what format the offer must take.
  • When funds are expected to be made available for this order.

Notice text

11/18/2026 UPDATE - Added missing specs mentioned in Appendix B. Please see Attachments. Due to the Added Specs, the RFI Due date has been extended to 11/30/2026 @ 12PM CST and the Proposal Due date has been extended to 12/15/2026 @ 12PM CST. ____________________________________________________________________________________________________ 11/16/2026 UPDATE - ADDED SPECS AND SITE VISIT SIGN IN SHEET TO SOLICITATION ATTACHMENTS & EXTENDED PROPOSAL DUE DATE TO 11/19/2026 @ 12PM CST _____________________________________________________________________________________________________ 11/09/2026 UPDATE - ADDING RFI RESPONSES.

SEE ATTACHED DOCUMENT ______________________________________________________________________________________________________ This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project.

In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.

After receipt of your RSVP by October 20, 2026 COB CST and EAL if required, an Initial Site Visit is set for October 22, 2026 @ 10am CST–– B1134. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 19, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Air Force by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Air Force, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy