1. Opportunities
  2. Department of the Interior
  3. Departmental Offices
  4. 140LL027Q0034

Replace 19,000 ft of fence, 7 Lakes, Carbon County, WY

The Bureau of Land Management wants a contractor to remove about 19,000 linear feet of old barbed wire fence and build new 4-wire fence with wood stays at the 7 Lakes site in Carbon County, Wyoming.

Official title: Y--7 LAKES FENCE REPAIR

Deadline
Dec 10, 5:00 PM PT
15 days left
Who can bid
Small businesses
Size standard for NAICS 238990: $19 million in average annual receipts; exceptions apply · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Not stated
Buyer: BLM Contracting Activity

What they're buying

It is a small-business-only, firm fixed price contract running May 1 to September 1, 2027.

Top catches

Domestic materials only
“The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.” Sol_140LL027Q0034.pdf, page 22

Every construction material must be domestic, and the list of allowed exceptions is blank. Confirm where posts, wire, staples and wood come from before you price, and ask the Contracting Officer about any exceptions.

Wage rates not fully provided
“[pages 2-5 of this document were not provided]” B03_DBA_Wage_Determination.pdf, page 1

Only page 1 of 5 of the Wyoming wage decision was provided, so you cannot see every labor rate for Carbon County. Get the full decision from SAM.gov before you price labor, and do not use the old Montana rates in Bid_Schedule.xlsx.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 9 of 10 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Remove about 19,000 linear feet of existing fence, including posts and wire, and haul away all debris. Burning is not allowed.
  • Build 19,000 linear feet of new 4-wire fence: top three wires barbed, bottom wire smooth and barbless, on steel posts 5.5 ft long and wood posts 6.5 ft long, with line posts about 16 ft 6 in apart.
  • Install a 42-inch wood stay, 2.5-inch diameter, between each line post. One section says 41 inches, so confirm with the Contracting Officer.
  • Build 6 three-post corners, 16 H-braces, and 4 wire gates 12 feet wide, per the bid schedule.
  • Clear brush across a 12-foot swath (8 feet on one side, 4 feet on the other), with no blading.
  • Furnish all materials. Give an independent lab assay report for treated wood from each bundle of 50 posts, and submit material submittals to Andy Skordas before shipping.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Domestic materials only. Every construction material must be domestic, and the list of allowed exceptions is blank. Confirm where posts, wire, staples and wood come from before you price, and ask the Contracting Officer about any exceptions.
  • Wage rates not fully provided. Only page 1 of 5 of the Wyoming wage decision was provided, so you cannot see every labor rate for Carbon County. Get the full decision from SAM.gov before you price labor, and do not use the old Montana rates in Bid_Schedule.xlsx.
  • No extra pay for weather stops. Shutdowns for weather, fire danger or winter get no extra money, however long they last. Only unusually severe weather can earn extra time, so build idle crew and equipment time into your price.“The Contractor will not be entitled to additional monetary compensation for such suspensions regardless of duration.” Sol_140LL027Q0034.pdf, page 8
  • Past performance can sink your quote. The notice asks for at least 3 recent, relevant jobs from the past 5 years, with full reference details. If you lack them, file a written statement to get a neutral rating, or you risk a deficient rating.“All others will be rated deficient in the past performance category” Sol_140LL027Q0034.pdf, page 26
  • Site RSVP due Dec 1. Your RSVP is due by 12 pm on Tuesday, 12/01/2026, with no time zone given, and it goes to Andy Skordas. The notice also bars contact with government staff other than the Contracting Officer and Contracting Specialist, so send your RSVP to the Contracting Officer too and ask them to confirm.“no later than 12 pm on Tuesday, 12/01/2026, to” Sol_140LL027Q0034.pdf, page 3
  • End panels missing from bid schedule. The bid schedule lists 0 end panels and 0 drainage crossings, yet the specs require end panels at fence ends and drainage crossings where drainages occur. Assume they are needed, read the drawings you could not review here, and ask the Contracting Officer to confirm quantities.“Construct end panels at the end of fence runs unless shown otherwise on the drawings.” A04_SOW.pdf, page 10

Key terms

Who can bidSmall businesses only (total small business set-aside)Size standard $19M under NAICS 238990. Offers from firms that are not small are rejected.Sol_140LL027Q0034.pdf, page 7
Contract period05/01/2027 to 09/01/2027Work must fall inside this window. Fire season may limit work days.Sol_140LL027Q0034.pdf, page 1
How they chooseBest value trade-off, one awardLowest price may not win. Technical and past performance together count more than price.Sol_140LL027Q0034.pdf, page 27
How to submitEmail to matthew_merritt@ios.doi.govSend signed SF 18, cover letter, bid schedule, past performance, technical narrative and amendment acknowledgment.Sol_140LL027Q0034.pdf, page 25
Estimated valueBetween $25,000 and $100,000This is the disclosed magnitude, not a cost estimate. Award depends on available funds.Sol_140LL027Q0034.pdf, page 3
Contract typeFirm fixed price, single award construction contractYour price must include all costs to complete the project.Sol_140LL027Q0034.pdf, page 3
Site visitWednesday, 12/02/2026, 9:00 AM (Mountain Time)Offerors are urged and expected to attend. RSVP by 12 pm Tuesday, 12/01/2026.Sol_140LL027Q0034.pdf, page 3

How to respond

  1. RSVP for the 12/02/2026 site visit by 12 pm Tuesday, 12/01/2026, to Andy Skordas at (307) 320-5714 or askordas@blm.gov, and also send the RSVP to the Contracting Officer at matthew_merritt@ios.doi.gov. Time zone: Not stated.
  2. Send any written questions to matthew_merritt@ios.doi.gov. The question deadline is Not stated.
  3. Assemble the quote: SF 18 signed by an official who can bind your firm, with the firm fixed price total; a cover letter with company name, address, SAM UEI, CAGE code, phone, contact person, the 60-day validity statement and the yes or no answers; the completed bid schedule; past performance; a technical narrative; and the signed amendment acknowledgment.
  4. Email the full package to matthew_merritt@ios.doi.gov by Thursday, 12/10/2026, 1700 PS. File format and size limits: Not stated.
  5. After award and before work starts, give the Contracting Officer an insurance certificate. Before any shipment, submit material submittals to Andy Skordas.

Attached files

From SAM.gov. Download links open the original files.

  • A06_Wire_Fence_and_Gates_0001.pdfUpdated wire fence and gate specification (Section 02824) that you must build to; read it, no form to sign. Read.
  • Sol_140LL027Q0034_Amd_0001.pdfAmendment 0001 to the RFQ that keeps the 12/10 deadline and provides updated specifications; you must acknowledge it by signing and returning it with your SF 18. Read.
  • A06_Drawings.pdf Scanned image, not read.
  • A04_SOW.pdfStatement of work and general and fence sections that define the work and pay items; read it to price the job, no form to sign. Read.
  • A06_Specifications.pdfEarlier material specifications, superseded for posts and wood by the updated specifications; read for context and confirm with the Contracting Officer which set governs. Read.
  • A06_Maps.pdfLocation maps for the 7 Lakes fence conversions; read to plan access, no form to sign. Read.
  • Sol_140LL027Q0034.pdfThe request for quotation with rules, clauses, and submission instructions; you complete the SF 18 and must follow its submittal rules. Read.
  • B03_DBA_Wage_Determination.pdfWyoming heavy and highway wage decision, provided for page 1 only; read the full decision on SAM.gov to price labor. Read in part (pages 1 of 5).
  • A06_Updated_Material_Specifications_0001.pdfUpdated material specifications for barbed wire, barbless wire, wood stays, steel posts and wood posts; read and price to this version. Read.
  • Bid_Schedule.xlsxBid schedule with item quantities and unit prices that you must complete and submit; the other sheets hold old 2018 and 2019 estimating notes from other projects, so do not rely on them. Read.

Not stated in what we read

  • Exact estimated value or independent cost estimate; the notice gives only a dollar range and says award depends on available funds.
  • Question deadline; Section (e) refers to one, but no date appears.
  • Answers to questions: Amendment 0001 says it answers questions, but no answers appear in the text provided.
  • Whether fence removal has its own pay item: Section 02827 says it is paid per linear foot, while Section 02824 says it is incidental.
  • Locations of end panels, stress panels and drainage crossings, which the drawings (not reviewed here) would show; you must read the drawings yourself.
  • Payment terms and any liquidated damages for late completion.

Notice text

7 LAKES FENCE REPAIR

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 24, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Departmental Offices by email

Each morning we'll send the new solicitations and sources-sought notices from Departmental Offices, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy