Asphalt paving for Doeskin Ranch parking lot, Bertram, TX
The government wants a small business to install 3 inches of hot-mix asphalt on a parking lot extension of about 10,500 square feet at the Doeskin Ranch public use area in Bertram, TX.
Official title: Z--TX-BALCONES CANYONLANDS NWR PRKNG LOT
- Deadline
- Dec 7, 12:00 PM CT
- 12 days left
- Who can bid
- Small businesses
- Size standard for NAICS 238990: $19 million in average annual receipts; exceptions apply · Who qualifies
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: FWS Contracting Activity
What they're buying
The estimated price is between $25,000 and $100,000, and work must finish 60 calendar days after notice to proceed.
Top catches
“12:00pm CST on Friday, November 20, 2026” Sol_140FF027Q0063_Amd_0001.pdf, page 2
Questions must reach the contracting office by 12:00pm CST on Friday, November 20, 2026, one day from today. The original notice says no more questions will be accepted, so send any questions in writing now.
“Failure to submit all of the required information prior to the closing of the solicitation (see Block 8 of the SF 1442) will result in the quote not being considered for award.” Sol_140FF027Q0063.pdf, page 91
A quote missing any checklist item is not considered. A technical approach that lacks detail can be rated Unacceptable, which makes you ineligible, so write it clearly before the deadline.
Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 5 of 7 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Install hot-mix asphalt 3 inches deep in a single lift on a lot extension of about 10,500 square feet, roughly 100 by 105 feet with a curved end.
- Match the elevation of the existing lot edge and keep at least a 2 percent slope for drainage.
- Proof-roll the subgrade and replace any soft spots with compacted backfill as the Contracting Officer directs. The subgrade and gravel base are already in place.
- Place mix only when the surface is at least 60°F and the subgrade is not wet. Spread at 215°F to 350°F, and finish compaction before the mix cools to 160°F.
- Hire a qualified testing agency. Meet core density and smoothness tests (1/8 inch under a 10-foot straightedge) and thickness of plus 1/4 inch, no minus.
- Remove waste and debris from Refuge property and dispose of it legally. Finish with a complete paved area and a walk-through with the Government representative.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Questions due Friday, November 20. Questions must reach the contracting office by 12:00pm CST on Friday, November 20, 2026, one day from today. The original notice says no more questions will be accepted, so send any questions in writing now.
- Missing checklist item voids quote. A quote missing any checklist item is not considered. A technical approach that lacks detail can be rated Unacceptable, which makes you ineligible, so write it clearly before the deadline.
- Performance dates conflict. The form lists fixed dates of 12/21/2026 to 02/22/2027, but the terms say 60 days after notice to proceed. Weather suspensions still count toward the 60 days, so ask which schedule governs before you plan crews.“Period of Performance: 12/21/2026 to” Sol_140FF027Q0063.pdf, page 3
- Bonds may be required. The form asks whether performance and payment bonds are required, but the YES or NO box is not readable in the text we could review. If bonds are required, they are due within 10 calendar days after award, so check now that a surety will write them.“THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?” Sol_140FF027Q0063.pdf, page 1
- Wage determination not reviewed. The wage determination file, B03, was not included in what we could review, so you must read it on SAM.gov before pricing any labor. The contract also requires weekly certified payrolls, so price that paperwork too.“All laborers and mechanics employed or working upon the site of the work will be paid unconditionally” Sol_140FF027Q0063.pdf, page 27
- Lump sum vs per-ton pricing. Section B asks for one lump-sum price, but the attached TxDOT Item 340 specification says the work is measured by the ton and paid at a unit price. Ask which basis applies before you submit your price.“will be paid for at the unit bid price for” A06_-_Specifications.pdf, page 16
Key terms
| Who can bid | Small businesses only (total small business set-aside)Offers from firms that are not small businesses are rejected under clause 52.219-6.SAM.gov record |
|---|---|
| Contract period | Start within 10 calendar days of notice to proceed; finish within 60 calendar daysThe form also lists fixed dates of 12/21/2026 to 02/22/2027.Sol_140FF027Q0063.pdf, page 9 |
| How they choose | Lowest-price technically acceptable (LPTA)Technical rating is only Acceptable or Unacceptable. Price is checked for reasonableness, completeness and balance.Sol_140FF027Q0063.pdf, page 104 |
| How to submit | Email quote to Christina_Mann@ios.doi.gov before the deadlineInclude the SF 1442, price schedule, price breakdown and checklist items.Sol_140FF027Q0063.pdf, page 91 |
| Questions due | Friday, November 20, 2026, 12:00pm CSTAmendment 0001 adds this date. The original notice said no more questions would be accepted.Sol_140FF027Q0063_Amd_0001.pdf, page 2 |
| Estimated value | Between $25,000 and $100,000This is the estimated construction contract price stated in the solicitation.Sol_140FF027Q0063.pdf, page 1 |
| Contract type | Firm fixed price, lump sumOne lump-sum line item for the paving, with a total base price.Sol_140FF027Q0063.pdf, page 96 |
| Site visit | Thursday, November 12, 2026, 10:00am-11:00am (CDT), now passedThe visit was optional. Contractors had to RSVP to Jennifer Brito 24 hours before.Sol_140FF027Q0063.pdf, page 91 |
How to respond
- Email any questions to Christina Mann by 12:00pm CST on Friday, November 20, 2026, the questions deadline in Amendment 0001.
- Email your full quote to Christina_Mann@ios.doi.gov by 1200 local time on Monday, 12/07/2026.
- Include the completed SF 1442 (blocks 14 to 20c), Section B prices for the lump-sum item, a separate detailed price breakdown, and your technical approach. Include the representations in L.1.1 or state that they are already in SAM.
- Return a signed and dated acknowledgment of Amendment 0001 (SF 30) with your quote, as the checklist requires.
- Keep your SAM registration active at submission and at award. Your offer must allow at least 60 calendar days for Government acceptance (block 13d). Block 17 is blank.
Attached files
From SAM.gov. Download links open the original files.
- A04_-_SOW.pdfThe statement of work that sets the scope, site and testing rules you must follow. Read it in full; there is no form to fill in. Read.
- Sol_140FF027Q0063.pdfThe solicitation with the SF 1442 offer form, price schedule, checklist and rules. You must fill in and sign the SF 1442 and the Section B prices; pages 35 to 87 were not provided, so read them on SAM.gov. Read in part (pages 1–34 and 88–104 of 104).
- A06_-_Specifications.pdfThe TxDOT Item 340 hot-mix asphalt specification with mix, placement and payment rules. Read it; there is no form to fill in. Read.
- Sol_140FF027Q0063_Amd_0001.pdfAmendment 0001, effective 11/18/2026, sets the questions deadline. You must sign and return the amendment acknowledgment with your quote. Read.
- B03_-_DOL_Wage_Determination.pdf Not read: over our length limit.
- A06_-_Drawings_-_Paving_Detail.pdf Scanned image, not read.
- B09_-_Solicitation_Amendment_-_RFQ_Questions_and_Responses_0001.pdfGovernment answers to a vendor question about Texas contractor licensing. Read it; there is no form to fill in. Read.
Not stated in what we read
- Which work site gets the paving and deliveries: the SOW gives Doeskin Ranch in Bertram, but SF 1442 block 3 lists the Refuge office at 24518 E FM 1431, Marble Falls.
- Whether a site visit can still be arranged. The only visit stated was on November 12, 2026, and no later visit is given.
- The wage determination rates in B03, which were not included. You could not review them, so you must read them on SAM.gov.
- The paving detail drawing, which is a scanned image with no readable text. You could not review it, so you must read it on SAM.gov.
- The size standard for NAICS 238990 and whether your firm meets it. The notice does not state it.
- The text of solicitation pages 35 to 87, which were not provided and may contain more terms. You must read them on SAM.gov.
Notice text
TX-BALCONES CANYONLANDS NWR PRKNG LOT
As published on SAM.gov.
Contacts
- Mann, Christina, christina_mann@ios.doi.gov, 7034688274
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 19, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 7, 12:00 PM CT12 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 238990, all other specialty trade contractors, soonest deadline first.
- Department of Veterans AffairsReplace condensate pump at Sepulveda CBOC, North Hills, CA
- Department of the Air ForceOpacity meter inspections at Hanscom AFB, MA
- Department of the Air ForceGATR grounding work, Tyndall AFB (market research)
- Department of the NavyZebra mussel removal and intake repair, Great Lakes, IL
- Department of Veterans AffairsNotice of Intent to Sole Source Perimeter Fence Line and Gates Replacement & Expansion Hines VA Medical Center in Illinois.
- Defense Logistics AgencyDoor repair at Defense Supply Center Richmond, VA
- Department of Veterans AffairsAutomatic door repair at Bedford VA campus, Bedford, MA
- Bureau of Engraving and PrintingEntry plaza renovation and sun sails, Fort Worth, TX
Free · at most one email a morning
Get new notices from Departmental Offices by email
Each morning we'll send the new solicitations and sources-sought notices from Departmental Offices, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy