Maintenance dredging at Anchorage Harbor, Anchorage, AK
Survey, dredge and dispose of about 900,000 cubic yards of fine-grained shoaled material a year for three years at Anchorage Harbor.
Official title: 2027-2029 Maintenance Dredging, Anchorage Harbor, Alaska
- Deadline
- Dec 14, 2:00 PM AKT
- 19 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- $7.66M
- Likely Alaska Marine Excavation LLC
- Place
- Anchorage, AK
- Buyer: W2SN Endist Alaska
What they're buying
An option adds 350,000 cubic yards a year of sandy material with some cobbles in the Cook Inlet Navigation Channel.
Top catches
“Amendment 0001 published 24 Nov 2026.” Notice text
Amendment 0001 was published on 24 Nov 2026, but it is not in this package. It may change the scope, dates or deadline. Download it from SAM.gov before you price or submit.
“Set-aside: Not stated” SAM.gov record
The record does not say whether the work is set aside for small businesses. Confirm your size status and eligibility from the solicitation or Amendment 0001 before you spend time on a bid.
Read by AI (Claude Haiku) on Nov 25, 2026 from the notice. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Survey, dredge and dispose of about 900,000 cubic yards of fine-grained shoaled material each year for three years at Anchorage Harbor.
- Optional annual dredging of about 350,000 cubic yards of sandy material with some cobbles in the Cook Inlet Navigation Channel.
- Keep the Port of Alaska dock face and terminals accessible for shipping at all times while dredging.
- Possible periodic maintenance dredging of the Cook Inlet Navigation Channel through Knik Arm Shoal.
- Furnish all labor, equipment, supplies, materials, supervision and other items and services needed for the work.
Who did it before
$7.66M
on the contract that likely holds this work now: Alaska Marine Excavation LLC. It ended Sep 30, 2026.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Amendment 0001 not included. Amendment 0001 was published on 24 Nov 2026, but it is not in this package. It may change the scope, dates or deadline. Download it from SAM.gov before you price or submit.
- Set-aside status not stated. The record does not say whether the work is set aside for small businesses. Confirm your size status and eligibility from the solicitation or Amendment 0001 before you spend time on a bid.
- Dock access must stay open. Shipping access to the Port of Alaska dock face and terminals must be kept open at all times during dredging. Plan equipment, timing and disposal around this rule and price the risk of delays.“keeps the Port of Alaska dock face and terminals accessible for shipping traffic at all times” Notice text
- You must supply all equipment. The government does not supply labor, equipment or materials. Price all equipment, supplies, supervision and disposal costs in full, including mobilization.“The contractor is to furnish all labor, equipment, supplies, materials, supervision and other items and services necessary to accomplish the work.” Notice text
- Sandy material work is an option. The 350,000 cubic yard sandy material work is an option, not a firm requirement. Keep it out of your base price and ask how the option will be priced and exercised.“with an option to annually dredge 350,000 cubic yards of sandy material with some cobbles” Notice text
- Deadline uses a -09:00 offset. The deadline is set in a -09:00 offset, which may differ from your local time zone. Convert it carefully and submit well before the time shown.“2026-12-14T14:00:00-09:00” SAM.gov record
Key terms
| Contract period | Three years, 2027 to 2029The option for sandy material is an extra annual quantity, not a separate period.Notice text |
|---|
How to respond
- Download and read Amendment 0001 on SAM.gov first. It was published 24 Nov 2026 and may change the deadline or terms.
- How to send your offer: Not stated. Look for submission instructions in the solicitation or Amendment 0001.
- Deadline: Monday, December 14, 2026, 2:00 PM, -09:00 offset as written. Convert it to your local time and submit before it passes.
Not stated in what we read
- Estimated dollar value of the work.
- How and where to submit an offer, and in what format.
- Whether the work is set aside for small businesses and the size standard that applies.
- What changed in Amendment 0001.
- How offers will be evaluated and awarded.
- Whether a site visit, pre-bid meeting or question deadline applies.
Notice text
Perform surveying, dredging and disposal of approximately 900,000 cubic yards of fine-grained shoaled material annually for three (3) years at the Anchorage Harbor with an option to annually dredge 350,000 cubic yards of sandy material with some cobbles in Cook Inlet Navigation Channel. The dredging must be accomplished in a manner that keeps the Port of Alaska dock face and terminals accessible for shipping traffic at all times. The Cook Inlet Navigation Channel, which is the marked entrance through Knik Arm Shoal to Anchorage Harbor, may also require periodic maintenance dredging. The contractor is to furnish all labor, equipment, supplies, materials, supervision and other items and services necessary to accomplish the work. Amendment 0001 published 24 Nov 2026.
As published on SAM.gov.
Contacts
- Jennifer Gosh, jennifer.gosh@usace.army.mil
- George Nasif, george.g.nasif@usace.army.mil
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at Department of the Army for the same kind of work (NAICS 237990, service code Z1KF) in Alaska that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Dredging the Nome Harbor 2024-2026.Alaska Marine Excavation LLC · W911KB24C0007 | $7,664,020 | Sep 30, 2026ended | AK |
| Perform Maintenance Dredging, Placement of Dredged Materials Using the Designated Open-Water Placement Site, and Pre- and Post-Dredge Surveys at Dillingham Harbor in Dillingham, Alaska for the Base…Alaska Marine Excavation LLC · W911KB26CA006 | $1,085,100 | Jun 30, 2026ended | AK |
| 2024 - 2026 Maintenance Dredging, Anchorage Harbor, AlaskaManson Construction Co · W911KB24C0005 | $33,438,223 | Apr 30, 2027in 5 months | AK |
| Dredging St Paul Harbor, St Paul Island AlaskaWestern Marine Construction, Inc. · W911KB24C0016 | $36,910,000 | Oct 31, 2027in 11 months | AK |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 25, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 14, 2:00 PM AKT19 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 237990, other heavy and civil engineering construction, soonest deadline first.
- Department of Veterans AffairsStormwater upgrades at Crown Hill cemetery, Indianapolis, IN
- Bureau of Indian Affairs96-inch culvert replacement on BIA Route 3, Cibecue, AZ
- Department of the ArmyNew baseball stadium at USAF Academy, Colorado Springs, CO
- Department of the ArmyLock and dam rehabilitation, Chicago, Illinois
- Department of the ArmyDredge containment repairs, Savannah and Brunswick, GA
- Departmental OfficesWater recirculation pipeline and pump, Pixley refuge, CA
- Department of the ArmyMaintenance dredging task orders, South Atlantic region
- Department of the ArmyTainter valve repair at The Dalles Lock and Dam, WA
Free · at most one email a morning
Get new notices from Department of the Army by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy