1. Opportunities
  2. Department of the Interior
  3. Bureau of Indian Affairs
  4. 140A1627Q0105

96-inch culvert replacement on BIA Route 3, Cibecue, AZ

Replace a damaged 96-inch corrugated metal culvert pipe, about 100 feet long, with concrete headwalls on BIA Route 3 near Cibecue, Arizona.

Official title: Y--FAIR Route 3 - 96-inch CMP Replacement Project

Deadline
Today, 5:00 PM ET
Wednesday, Nov 25
Who can bid
Indian small businesses
Indian small business economic enterprises only · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Not stated
Buyer: Bureau of Indian Affairs

What they're buying

The work is set aside for Indian Small Business Economic Enterprises only, and emailed quotes are due Wednesday, November 25, 2026 at 5:00 PM EST.

Top catches

Deadline is tomorrow, 5 PM EST
“Bid due date is 11.25.2026 @ 5PM EST.” Sol_140A1627Q0105_Amd_0005.pdf, page 2

Quotes are due Wednesday, November 25, 2026 at 5:00 PM EST. Several amendments moved the date, so use only this one. Send early and confirm receipt.

Buy Indian eligibility required
“This requirement is set-aside 100% for Indian Small Business Economic Enterprises (ISBEE).” Sol_140A1627Q0105.pdf, page 3

Only ISBEE firms may bid. Before you quote, check that you meet the Indian Economic Enterprise definition, since your offer includes a representation on it.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 11 of 11 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Install a new 96-inch corrugated metal pipe, about 100 feet long, like kind to the existing structure, with certification.
  • Build concrete headwalls at the inlet and outlet to the attached FHWA standard 601-3 drawing.
  • Backfill with structural fill, bringing in borrow material where needed, then restore the road with an 8-inch aggregate base and 3-inch asphalt.
  • Repair about 40 feet of 8-inch sewer line near the culvert, as stated in the Q&A.
  • Provide traffic control, stormwater and environmental plans, quality control testing, and a construction schedule.
  • Set out the survey for the structure and return the roadway to its original condition. The agency removes the old pipe.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Deadline is tomorrow, 5 PM EST. Quotes are due Wednesday, November 25, 2026 at 5:00 PM EST. Several amendments moved the date, so use only this one. Send early and confirm receipt.
  • Buy Indian eligibility required. Only ISBEE firms may bid. Before you quote, check that you meet the Indian Economic Enterprise definition, since your offer includes a representation on it.
  • 56 or 90 days? Sources conflict. The solicitation says 56 calendar days, but a Q&A answer says 90 days. Questions closed November 11, so contact the contracting officer in writing to confirm before you price the schedule.“Fifty-Six (56) calendar days.” Sol_140A1627Q0105.pdf, page 3
  • Bid guarantee and bonds. A bid guarantee must be sent electronically with your quote: 20% of the bid price or $3,000,000, whichever is less. Item 12 also asks about performance and payment bonds due 10 days after award, and the check box is unclear in our copy. Confirm your surety before you quote.“The amount of the bid guarantee shall be 20% of the bid price or $3,000,000.00, whichever is less.” Sol_140A1627Q0105.pdf, page 12
  • Sewer line repair is included. The Q&A says the broken sewer line repair is part of this work, about 40 feet of 8-inch pipe owned by the White Mountain Apache Tribal Utility Authority. Its depth is an estimate, so get the utility's cost before you price it.“Yes, this should be included.” B12_MISC_RFP_RFI_Log_Answered_11_23_26_0005.pdf, page 3
  • Wage rates not readable. The Davis-Bacon wage determination is attached, but its text is garbled in our copy, so the rates could not be checked here. Get a readable copy from the contracting officer before you price labor.“Contracting Officer to provide those wages.” B12_MISC_RFP_RFI_Log_Answered_11_23_26_0005.pdf, page 1

Key terms

Who can bidIndian Small Business Economic Enterprises (ISBEE) onlyYour offer includes a representation that you meet the Indian Economic Enterprise definition (DIAR 1452.280-4).Sol_140A1627Q0105.pdf, page 3
Contract period56 calendar days after notice to proceedThe Q&A answer to question 36 says 90 days. See the catches.Sol_140A1627Q0105.pdf, page 3
How they chooseLowest price from a responsible and responsive firmThis is the only evaluation factor listed.Sol_140A1627Q0105.pdf, page 10
How to submitEmail your quote to Thomas Tortorella and Abri SterlacciSubject line: Company Name Quote in Response to Solicitation Number. The bid guarantee is sent electronically.Sol_140A1627Q0105.pdf, page 11
Questions dueWednesday, November 11, 2026, 4:00 p.m. Central Time (closed)Questions are closed. Answers are in the Q&A logs.Sol_140A1627Q0105.pdf, page 12
Contract typeFirm-fixed-price, per the solicitationQ&A 9 and 18 say firm fixed price. Statement of work section 3 describes reimbursement of costs.Sol_140A1627Q0105.pdf, page 3
Site visitTuesday, November 10, 2026, 9:00 a.m. local time (already passed)Q&A 10 says attendance is highly recommended, not required.Sol_140A1627Q0105.pdf, page 3

How to respond

  1. Email your quote to Thomas.Tortorella@bia.gov and Abri.Sterlacci@bia.gov, the addresses the notice lists for quotes.
  2. Use the subject line: Company Name Quote in Response to Solicitation Number, and include RFQ number 140A1627Q0105.
  3. Include your Unique Entity ID, mailing address, contact details, quote number, quote date, and firm-fixed-price pricing for all of the statement of work. Attach the bid guarantee electronically.
  4. Complete the offer page of the SF 1442 (items 14 to 20). Acknowledge amendments 0001 through 0005, and enter an acceptance period of at least 60 calendar days in item 17.
  5. Send by 5:00 PM EST on Wednesday, November 25, 2026. If you do not get a receipt within 24 hours, confirm with the contacts yourself, since the notice places that duty on you.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Estimated value of the work: not stated.
  • The bid schedule and DOT wingwall drawing that the Q&A says were handed out on the site walk. They are not in the files, and the Q&A says they are the basis of bid.
  • Whether liquidated damages apply. Q&A 25 answers only the weather extension question.
  • Pricing basis: the Q&A says firm fixed price, but statement of work section 3 describes reimbursement of costs.
  • Readable Davis-Bacon wage rates for this project.
  • Whether performance and payment bonds are required, since the bond check box is unclear in our copy.

Notice text

FAIR Route 3 - 96-inch CMP Replacement Project

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 24, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Bureau of Indian Affairs by email

Each morning we'll send the new solicitations and sources-sought notices from Bureau of Indian Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy