Phase 1 cemetery construction, Albuquerque, NM

The VA is doing market research on firms able to build Phase 1 of Albuquerque National Cemetery in Albuquerque, NM: about 55 acres, roughly 28,212 gravesites, and the support facilities needed to run the cemetery.

Official title: Y1PZ--Albuquerque National Cemetery Project

Due Nov 30, 2:00 PM ET · SDVOSB · Albuquerque

What they're buying

This is not a solicitation, and you respond with a capability package by email by Monday, November 30, 2026, 2:00 PM Eastern.

Top catches

Set-aside limits who can bid
“Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)” SAM.gov record

The record marks this as an SDVOSB set-aside, so the eventual contract is likely limited to service-disabled veteran-owned small businesses. Confirm your VetBiz VIP status and SAM.gov listing before you prepare a full package. Likely, not stated outright.

Surety letter for $50M-$100M bonds
“to furnish a bid bond, payment bond, and performance bond for a project between $50,000,000-$100,000,000 million” Notice text

Your package must include a surety letter confirming capacity for bid, payment and performance bonds at this size. Ask your surety now, because the letter is required in your response.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 2 of 2 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Phase 1 gravesite development on about 55 acres, with about 28,212 gravesites, including casket, cremation, natural burial and memorial wall spaces.
  • Roads, walks, grading, drainage, mechanical and electrical work, utility systems, and water storage facilities.
  • Removal of existing structures, state or local permits, and protected habitat, wetlands and mitigation work.
  • CLIN 0002: procure, manufacture, deliver, off-load and store all pre-placed crypts.
  • ETO accepted by NCA within 600 calendar days from Notice to Proceed; punch list, commissioning and training finished by the end of the performance period.
  • Additive option CLIN 0003: partnering facilitation and collaborative analytics, including dashboards, surveys, reports and software.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Set-aside limits who can bid. The record marks this as an SDVOSB set-aside, so the eventual contract is likely limited to service-disabled veteran-owned small businesses. Confirm your VetBiz VIP status and SAM.gov listing before you prepare a full package.
  • Surety letter for $50M-$100M bonds. Your package must include a surety letter confirming capacity for bid, payment and performance bonds at this size. Ask your surety now, because the letter is required in your response.
  • Needs $50M projects in five years. You must show projects from the past five years valued at about $50M or more in construction cost, plus a current project list. If you lack that record, a bid is likely not realistic.“Provide projects in the past five (5) years that are Valued at approximately $50M or greater in construction costs” Notice text
  • Market research, not a bid. Nothing in this notice awards a contract, so you cannot bid on it here. Send a capability package by the deadline and expect a separate solicitation later.“NO AWARD will be made from this Sources Sought Notice.” Notice text
  • Exact email subject line. The notice spells the subject line ALBURQUERQUE. Copy it exactly as printed so your email is filed correctly, or confirm the spelling with the contracting officer.“WITH SUBJECT LINE: ALBURQUERQUE NATIONAL CEMETERY.” Notice text
  • PLA questionnaire is required. You must return the PLA questionnaire with your package. It asks how a labor agreement would change your costs, so work that out before you answer.“The PLA questionnaire must be filled out and returned to the Contracting Officer with capability package (See Attached).” Notice text

Key terms

Who can bidService-disabled veteran-owned small businesses (SDVOSB) onlyThe set-aside is shown in the SAM.gov record. You also need VIP evidence and a SAM.gov listing.SAM.gov record
Contract periodETO accepted within 600 calendar days from Notice to ProceedThe full performance period for all work is not stated.Notice text
How to submitEmail to Tammiko Newell at TAMMIKO.NEWELL@VA.GOV, subject line ALBURQUERQUE NATIONAL CEMETERYSend the capability statement package and the PLA questionnaire.Notice text
Contract typeConstruction with a base bid and an additive optionThree CLINs: general construction, pre-placed crypts, and an optional collaborative analytics item.Notice text

How to respond

  1. Prepare a capability statement package with a cover letter that gives company name, address, point of contact with phone number and email address.
  2. Add evidence of your size status: VIP registration as SDVOSB or VOSB if applicable, and your SAM.gov listing with representations and certifications.
  3. Add the surety letter, corporate experience on projects valued about $50M or more from the past five years, and a current project list with award amount, award date and estimated completion date.
  4. Complete the six-question PLA questionnaire and include it with the package. File format and size limits: Not stated.
  5. Email the package to TAMMIKO.NEWELL@VA.GOV with subject line ALBURQUERQUE NATIONAL CEMETERY by Monday, November 30, 2026, 2:00 PM Eastern Time.

Attached files

  • 36C10F27R0005_1.docxThe full sources sought notice with the list of what your capability package must include; you read it and do not sign it. Read.
  • PROJECT LABOR AGREEMENT QA.docxA six-question PLA questionnaire that you must fill in and return with your capability package. Read.

Not stated in what we read

  • Estimated value of the construction contract, beyond the bonding range.
  • Full performance period for all work, beyond the 600-day ETO milestone.
  • Whether a project labor agreement will be required in the eventual solicitation.
  • Questions deadline and whether a site visit or pre-bid meeting will be held.
  • Format, page limits and file size limits for the capability package.
  • When the solicitation will be issued and whether it will keep the SDVOSB set-aside.

Notice text

This is a SOURCES SOUGHT NOTICE for Market Research ONLY. NO AWARD will be made from this Sources Sought Notice. This Sources Sought Notice (SSN) is for market research purposes only in accordance with Federal Acquisition Regulation (FAR) Part 10 and FAR 15.201(e), to determine the availability and technical capabilities of qualified sources. It does not constitute a solicitation and is not to be considered as a commitment by the Government. All firms responding to this notice are advised that their response to this notice is not a request that will be considered for contract award. All interested parties will be required to respond to the resultant solicitation separately from their response to this notice. The purpose of this project is to enable an existing national cemetery to continue to provide burial services for eligible veterans in Central New Mexico. Located in Bernalillo County, about 15 miles west of downtown Albuquerque and serving a population of approximately 235,000 Veterans in the county. This proposed development will provide an additional 15 years of continued burial service to a veteran population who has been served by the Santa Fe National Cemetery. This project will consist of Phase 1 Gravesite Development construction for this cemetery. Phase 1 provides not only for the initial 15-year gravesite burial inventory but also provides for the supporting facilities and infrastructure necessary to maintain and operate the cemetery. The remainder of the site will be developed in future phased projects in accordance with the cemetery master plan. This investment will develop approximately 55 acres of the approximately 585-acre anticipated land acquisition site and provide approximately 28,212 gravesites, including both casket, cremation, natural burial, and memorial wall spaces. This project will provide for the following elements and features: CLIN 0001 Base Bid General Construction: The Base Bid work of this contract includes phased requirements. These phases are referred to as ETO and Remainder of the work. The ETO shall be completed within the established time frame indicated in the Contract. Completion of the ETO work will follow procedures like those for final completion and acceptance, with the facilities within the ETO being completed and turned over to the Cemetery for use to begin operation of the Cemetery while the remaining work is completed. ETO shall be completed and accepted by NCA for operation within 600 calendar days from Notice to Proceed. While the work of the ETO is being performed, work for the remainder of the project can also be performed. Work of the Contract includes general conditions, general construction, alterations, roads, walks, grading, drainage, mechanical and electrical work, utility systems, water storage facilities, necessary removal of existing structures and construction and certain of other items and all other work necessary to construct the project. The Contractor shall obtain state/local construction permitting as required and conduct all Protected Habitat Preservation, Wetlands, and Mitigation efforts as required to meet governing body mandates. By the end of the performance period all work shall be satisfactorily completed and ready for custody, transfer, and acceptance by NCA. All punch list items shall be satisfactorily addressed, all commissioning completed, and all training accomplished. CLIN 0002 Base Bid Furnish Pre-Placed Crypts: Procure, manufacture, deliver to site, off-load and store, all pre-placed crypts. CLIN 0003 Additive Option Collaborative Analytics: The Contractor shall provide, either directly or through a qualified subcontractor, Partnering Facilitation Services and Collaborative Analytics implementation for the project delivery team. These services shall include all labor, management, expertise, data analysis, dashboard creation and maintenance, surveys, reports, meeting materials, software, and equipment necessary to perform the work. RESPOND WITH COMPANY S CAPABILITY STATEMENT PACKAGE and PROJECT LABOR AGREEMENT SURVEY Firms interested in submitting their capabilities for this project must include the following information compiled into a Contractor Capability Statement package: 1. Cover letter/introduction that includes company name, address, point of contact with phone number and e-mail address. 2. Business size determination and qualifying small business status, if a small business: a. If, applicable provide evidence of Service-Disabled Veteran Owned Small Businesses (SDVOSB) or Veteran Owned Small Businesses (VOSB) status through registration at VIP (https://www.vip.vetbiz.va.gov/); b. If applicable provide evidence of ability to offer a small business under NAICS Code 237990 with Water Tank scope under NAICS Code 238990 or 236220, and listing in the System for Award Management (www.beta.SAM.gov), with representations and certifications. 3. Bonding capacity: a. Provide a letter from your surety-on-surety letterhead that affirms your company s bonding capacity to furnish a bid bond, payment bond, and performance bond for a project between $50,000,000-$100,000,000 million. 4. Contractor Capability Statement shall include, but not be limited, to the following: a. Corporate Experience: Provide projects in the past five (5) years that are Valued at approximately $50M or greater in construction costs, and Demonstrate your company s experience constructing or managing the construction of projects that match the following characteristics: VA/NCA National Cemetery projects. State/local/private cemetery projects. Projects requiring the construction of multiple features typical to a National Cemetery such as pre-cast, placed crypts; columbaria niches, memorial walls, cast or natural stone columbarium caps, cast or natural stone veneers, turf (sod) placement and maintenance, tree and shrub placement and maintenance, irrigation systems with mainlines exceeding 4-inch in diameter, irrigation central control systems, roadways, wetlands/environmental remediation or restoration. Building construction, building remodel, mass/fine grading & excavation, site utilities, paving, new golf courses or expansions, regional parks, multiple sport-fields complexes, or multi-phased land development projects larger than 40 acres. b. Describe your experience with as many of the elements of construction identified below, as you can: Mass/fine Grading & Excavation Site Utilities Prefer to see projects involving earth work and grading for cemeteries, parks or site development projects of at least acres. Site Utilities Demonstrate experience with storm water management systems and site drainage for flat sites. Demonstrate experience with potable water distribution from a well, or building of water tank Demonstrate experience with sanitary waste systems, both POWTS & municipal. Paving Paving projects may include private & local asphalt roads; concrete curb & gutter, asphalt parking lots, and concrete sidewalk, on site development projects of at least 40 acres. Experience in Albuquerque, NM or similar climates is preferred, but not required. Landscaping Landscaping projects involving planting and lawn installation for cemeteries, parks, golf courses or other site development projects of at least 40 acres in climates similar to Albuquerque, NM. Irrigation Irrigation system installation for cemetery, park, golf course, or other types of development sites of at least 40 acres. Include experience with irrigation ponds, wells, pumping systems if you have it. Precast Concrete Burial Components Demonstrate experience with successful fabrication and installation of precast crypt and precast columbarium, if you have it. Phasing and Continuity of Operations Demonstrate experience with best practices to successfully complete phased site work at an occupied and functioning facility in a way to minimize noise and dust and minimize detrimental effects on cemetery operations. 5. Current Project List: Provide a detailed list of ongoing contracts & projects; the description shall include project type, award amount, award date, and estimated completion date. 6. Project Labor Agreement (PLA): A PLA is defined as a pre-hire Collective Bargaining Agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). Federal Acquisition Regulation (FAR) 22.503 Policy: (a) Project Labor Agreement (PLA) is a tool that agencies may use to promote economy and efficiency in Federal procurement. Pursuant to Executive Order 13502, agencies are encouraged to consider requiring the use of project labor agreements in connection with large-scale construction projects. (b) An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a project labor agreement with one or more labor organizations if the agency decides that the use of project labor agreements will- (1) Advance the Federal Government's interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and (2) Be consistent with law. (c) Agencies may also consider the following factors in deciding whether the use of a project labor agreement is appropriate for the construction project: (1) The project will require multiple construction contractors and/or subcontractors employing workers in multiple crafts or trades. (2) There is a shortage of skilled labor in the region in which the construction project will be sited. (3) Completion of the project will be for a continuous period. (4) Project labor agreements have been used on comparable projects undertaken by Federal, State, municipal, or private entities in the geographic area of the project. (5) A project labor agreement will promote the agency s long term program interests, such as facilitating the training of a skilled workforce to meet the agency s future construction needs. (6) Any other factors that the agency decides are appropriate. See FAR Provision: 52.222-33 Notice of Requirement for Project Labor Agreement and FAR Clause 52.222-34 Project Labor Agreement for further details. The PLA questionnaire must be filled out and returned to the Contracting Officer with capability package (See Attached). ALL RESPONSES MUST BE EMAIL TO TAMMIKO NEWELL,SENIOR CONTRACTING OFFICER: TAMMIKO.NEWELL@VA.GOV WITH SUBJECT LINE: ALBURQUERQUE NATIONAL CEMETERY.

As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 19, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of Veterans Affairs by email

Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy