- Opportunities
- Department of Veterans Affairs
- 36C26127Q00260001
Replace flooring and paint in Building 650, Mather, CA
The VA wants a contractor to replace about 38,000 square feet of carpet and vinyl tile, plus wall base, corner guards and paint, on the 2nd and 3rd floors of Building 650 at the Sacramento VA Medical Center in Mather, CA.
Official title: Z2DA--612A4-27-018 | Replace B650 3rd and 2nd Flooring
- Deadline
- Today, 12:00 PM PT
- Tuesday, Nov 24
- Who can bid
- SDVOSB firms
- Service-disabled veteran-owned small businesses certified by SBA only · Who qualifies
- Last time
- $239K
- Likely Vetgov Construction, Inc.
- Place
- Mather, CA
- Buyer: 261-Network Contract Office 21 (36C261)
What they're buying
Most work must be done after hours, and the project must finish within 240 calendar days from notice to proceed.
Top catches
“11/17: Amendment 0004- Additonal RFI responses, add attachments, extend bid due date.” Notice text
The bid is due Tuesday, 2026-11-24 at 12:00:00 -08:00. Amendments 0003 and 0004 extended the date, and amendment 0005 was not reviewed here, so check SAM.gov for the newest date and time.
“Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)” SAM.gov record
Only service-disabled veteran-owned small businesses can bid. If your firm is not one, do not spend time on this bid.
Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 9 of 26 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Replace about 38,000 square feet of carpet and luxury vinyl tile on the 2nd and 3rd floors of Building 650, with resilient wall base where new flooring goes.
- Replace all plastic corner guards with stainless steel corner guards. Up to 10 more may be requested.
- Repair up to 20% of the drywall in each room, then paint all 2nd and 3rd floor rooms. The VA will give a paint plan later.
- Remove and dispose of old flooring, equipment and trash. Submit product data, samples and color charts for VA approval.
- Work outside normal hours (7:30 AM to 4:00 PM, Monday to Friday), with no more than five rooms at a time on weekdays. Finish within 240 calendar days from notice to proceed.
- Store furniture outside the VA at your own cost. You may use a conex box in up to three parking lot spaces.
Who did it before
$239K
on the contract that likely holds this work now: Vetgov Construction, Inc.. It ends Nov 30, 2026.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Check the latest bid date. The bid is due Tuesday, 2026-11-24 at 12:00:00 -08:00. Amendments 0003 and 0004 extended the date, and amendment 0005 was not reviewed here, so check SAM.gov for the newest date and time.
- Set-aside limits who can bid. Only service-disabled veteran-owned small businesses can bid. If your firm is not one, do not spend time on this bid.
- Safety record can disqualify you. Four serious, one repeat, or one willful OSHA or EPA violation in the past three years disqualifies you. Check your 2023 to 2026 record and get a signed insurance carrier letter for your EMR before you submit.“Four serious, one repeat, or one willful violation disqualifies the contractor.” CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx
- Most work must be after hours. Normal hours are 7:30 AM to 4:00 PM on weekdays, so most crews will work nights or weekends. Price that premium time, and give three weeks notice for any daytime work.“All work shall be performed outside of normal working hours, which are 7:30 AM to 4:00 PM, Monday through Friday, excluding weekends and holidays unless approved by the CO.” Notice text
- Only completed projects count. You may list up to four prime contractor projects, and they must be fully completed. Leave out jobs still in progress, since those likely will not be evaluated.“Offeror MUST submit 100% completed projects for evaluation.” Evaluation Criteria 2- Prior Experience.xlsx
- Spec pages are missing here. This copy of the specification is missing pages 59 to 152, which were not reviewed here. Get the full specification from the SAM.gov posting before you price the job.“[pages 59-152 of this document were not provided]” Specifications - 612A4-27-018 Replace B650 3rd and 2nd Flooring REV1.pdf, page 58
Key terms
| Who can bid | Service-disabled veteran-owned small businesses only (SDVOSB set-aside)Set-aside under FAR 19.14.SAM.gov record |
|---|---|
| Contract period | No longer than 240 calendar days from notice to proceedWork on no more than five rooms at a time on weekdays.Notice text |
| Contract type | Construction project, price type not statedNAICS 236220 and PSC Z2DA per the SAM.gov record.Notice text |
| Site visit | Strongly encouraged, by appointment onlyArrange through the Contracting Officer and coordinate with the COR. The text does not say it is mandatory.Notice text |
How to respond
- Confirm your firm is an SDVOSB and check your 2023 to 2026 OSHA and EPA violation record before you spend time on the bid.
- Get the full specification and amendments 0002 to 0005 from the website where the solicitation is posted.
- Fill in and sign the price breakdown (Attachment C), the key personnel forms, the prior experience form and the safety and environmental certification. Include bonds, insurance, overhead and profit in your price.
- Send your offer by Tuesday, 2026-11-24 at 12:00:00 -08:00. Where to send it and in what format: Not stated.
- Send questions on the RFI form to kayla.haruguchi@va.gov and daniel.jhun@va.gov, and arrange any site visit through the Contracting Officer first.
Attached files
From SAM.gov. Download links open the original files.
- 36C26127Q0026 0003.pdf Not read: over our length limit.
- 36C26127Q0026 0004.pdf Not read: over our length limit.
- RFI Form - 36C26127Q0026_2 B650 3rd and 2nd Flooring.docxBlank request-for-information form for sending questions to the VA. Fill it in only if you have a question. Read.
- Exhibit A - BLDG 650 2nd and 3rd Floors Room Flooring Replacement.xlsx Not read: over our length limit.
- Attachment 3 - NorCal Paint Standards 2025.pdf Scanned image, not read.
- CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docxCertificate listing OSHA and EPA violations for 2023 to 2026 and your insurance EMR. You must fill it in and sign it. Read.
- Attachment 1 - BLDG 650 Mather 2nd and 3rd Floor Carpet Replacement Current Flooring.pdf Not read: over our length limit.
- 36C26127Q0026 0002.pdf Not read: over our length limit.
- Wage Determination CA20260007 dated 20260903.pdf Not read: over our length limit.
- 612A4-27-018 Pre-Bid Sign in Shts.pdf Scanned image, not read.
- RFIs 612A4-27-018 B650 3rd and 2nd Flooring 17Nov26.pdfVA answers to contractor questions dated November 17. Read them, because they change the requirements. Read.
- 10 26 00 - WALL AND DOOR PROTECTION.pdf Not read: over our length limit.
- RFIs 612A4-27-018 B650 3rd and 2nd Flooring.pdf Older version, not read.
- PPQ ATTACHMENT B.docx Not read: over our length limit.
- 36C26127Q0026 0001 Replace B650 Flooring.pdf Not read: over our length limit.
- Attachment C Price Breakdown 36C26127Q0026_2 B650 3rd and 2nd Flooring.xlsxPrice form with material, equipment, labor and total for each specification section, plus bonds, insurance, overhead and profit. You must fill it in. Read.
- Wage Determination CA20260019 dated 20260903.pdf Not read: over our length limit.
- Evaluation Criteria 1 - Key Personnel_ATTACHMENT A.docxForm for each key person (project manager, QC, safety, site superintendent) with experience and up to five past projects. You must fill it in. Read.
- Attachment 4 - Stainless Steel Corner Guards_Technical Data_3716_Rev_15.pdfManufacturer data sheet for stainless steel corner guards. Read it for the product options; nothing to sign. Read.
- Attachment 1 - BLDG 650 Mather 2nd and 3rd Floor Carpet Replacement Current Flooring1.pdf Not read: over our length limit.
- 36C26127Q0026 0005.pdf Not read: over our length limit.
- Attachment 2 - NorCal Flooring Standards 2026.pdf Scanned image, not read.
- 36C26127Q0026_2.docx Not read: over our length limit.
- Specifications - 612A4-27-018 Replace B650 3rd and 2nd Flooring REV1.pdfProject specifications covering site rules, safety, flooring and painting. You must read it, and this copy is missing pages 59 to 152. Read in part (pages 1–58 and 153–184 of 184).
- Evaluation Criteria 2- Prior Experience.xlsxForm for up to four completed prime contractor projects. You must fill it in. Read.
- Additional RFI clarification 18 Nov 26.pdfVA answers on furniture storage and a conex box location. Read it; nothing to sign. Read.
Not stated in what we read
- Estimated value or budget for the project.
- How offers are rated and whether price counts for more than experience.
- How and where to send the offer, and in what file format.
- The deadline for questions.
- Wage determinations CA20260007 and CA20260019 (both dated 2026-09-03) were not reviewed here. Read both before pricing labor.
- Amendments 0002 to 0005 and specification pages 59 to 152 were not reviewed here, and they may change the requirements.
Notice text
VA Northern California Health Care System 612A4-27-018 Page 4 of 5 Statement of Work Replace B650 3rd and 2nd Flooring Project #612A4-27-018 General Intention: The purpose of this project is to replace flooring, resilient base, stainless steel corner guards, and paint throughout B650 3rd and 2nd Floor of the Sacramento Veterans Affairs Medical Center (VAMC) of VA Northern California Healthcare System (VANCHCS). Contractor shall furnish all labor and materials needed to perform all demolition, replacement, and installation required by this scope as required by specifications.
Visits to the site by bidders may be made only by appointment with the Contracting Officer (CO) for the project. A preliminary/pre-proposal site visit is strongly encouraged and shall be coordinated with the Contracting Officer Representative (COR). Location of work; the geographic location for service(s) are the following areas: Sacramento VA Medical Center 10535 Hospital Way Mather, CA 95655 Buildings: 650 3rd and 2nd Floors The contractor shall consider that there are no staging areas available within the facility premises.
If necessary, staging areas may be put into effect at the discretion of the COR, depending on availability. The Contractor shall note that there is absolutely NO Contractor employee parking in Patient Parking designated areas. VANCHCS will not invalidate or make reimbursement for parking violations for the Contractor under any conditions. The contractor will be responsible for disposing of all equipment components and trash demolished or replaced as part of this project.
The contractor is responsible for following infection control procedures per VA specifications and site infection control protocols. Schedule of work: All work shall be performed outside of normal working hours, which are 7:30 AM to 4:00 PM, Monday through Friday, excluding weekends and holidays unless approved by the CO. Work during normal hours may only be scheduled if it is planned at least three weeks in advance for a specific location and approved by the appropriate VA personnel.
Any work activities that generate noise or disruption sufficient to impact patient care, disturb patients, or interfere with staff operations must be conducted only after normal working hours or on weekends. The contractor is responsible for coordinating with VA COR to ensure all work scheduling complies with this requirement and must provide notification of planned work at least three weeks prior to commencement. Emergency work or exceptions to this schedule must be requested in writing and approved by the CO. The Contractor shall prepare any necessary construction documents and provide all necessary/required professional engineering services to include, but not limited to tools, equipment, materials, labor, travel, expertise, supervision, testing, analysis, and specialty services to accomplish all items and requirements outlined in this SOW. All work shall comply with all applicable federal, state, local and VA regulations and requirements.
Scope of Work: The contractor shall replace approximately 38,000 square feet (SF) of carpet and luxury vinyl tile throughout Building 650 3rd and 2nd Floors as shown in Exhibit A - BLDG 650 2nd and 3rd Floors Room Flooring Replacement and Attachment 1 - BLDG 650 Mather 2nd and 3rd Floor Carpet Replacement Current Flooring. Resilient wall base shall also be replaced at all spaces that will receive new flooring. The Contractor shall refer to Specification Section 09 06 00, Schedules for Finishes, for the products and finishes required under this contract.
The Contractor shall furnish the specified products or an equivalent product that meets or exceeds all requirements of the specified product, including, as applicable, quality, performance, durability, compatibility, dimensions, appearance, finish, color, and warranty requirements. The proposed product shall be similar in appearance and shall match the color, texture, pattern, and finish of the specified product to the satisfaction of VA Engineering.
The Contractor shall submit product data, samples, color charts, and other information necessary for VA Engineering s evaluation and approval. Attachment 1 - BLDG 650 Mather 2nd and 3rd Floor Carpet Replacement Current Flooring shows current carpet with red lines across rooms or spaces that will remain the same (no change in these). Exhibit A - BLDG 650 2nd and 3rd Floors Room Flooring Replacement states room by room current flooring and resilient base to be installed.
The Contractor shall refer to Specification Section 09 06 00, Schedules for Finishes, for the products and finishes required under this contract. The Contractor shall furnish the specified products or an equivalent product that meets or exceeds all requirements of the specified product, including, as applicable, quality, performance, durability, compatibility, dimensions, appearance, finish, color, and warranty requirements. The proposed product shall be similar in appearance and shall match the color, texture, pattern, and finish of the specified product to the satisfaction of VA Engineering.
The Contractor shall submit product data, samples, color charts, and other information necessary for VA Engineering s evaluation and approval. The contractor shall remove and install new accessories associated with the flooring. Carpet and luxury vinyl tiles to include, but not limited to, subfloors, carpet tack strips, carpet padding, and vinyl glue. The contractor shall paint all rooms located on the 2nd and 3rd floors of Building 650 per specification Section 09 06 00, Schedule of Finishes.
The Contractor shall furnish the specified products or an equivalent product that meets or exceeds all requirements of the specified product, including, as applicable, quality, performance, durability, compatibility, dimensions, appearance, finish, color, and warranty requirements. The proposed product shall be similar in appearance and shall match the color, texture, pattern, and finish of the specified product to the satisfaction of VA Engineering.
The Contractor shall submit product data, samples, color charts, and other information necessary for VA Engineering s evaluation and approval. The contractor shall anticipate repairing up to 20% of the drywall surface area in each room as needed to ensure a uniform and high-quality finish. All drywall repairs must be completed to meet VA standards and industry best practices before any painting activities commence. The contractor is responsible for providing all necessary materials, labor, and equipment to complete both the repair and painting work.
The VA will provide a paint plan as the installation date approaches. The contractor shall replace all existing plastic corner guards with new stainless steel corner guards to match exact material per specification Section 09 06 00, Schedules for Finishes or an equivalent. For installation purposes and material lengths, the contractor shall follow wall mockup located outside the Engineering Suite at Building 650. Contractor to coordinate visit with COR. Contractor shall take into consideration that additional corner guards up to 10 additional might be needed upon request of the VA. The contractor shall meet with the COR to discuss and outline phasing requirements for the project.
These phasing requirements shall describe the general sequence of the project work, estimated project duration, and what Government constraints will exist that will influence the Contractor s approach to the construction project. The Sacramento VAMC is an active hospital and therefore will require consideration to those areas with patients and staff. The contractor shall be responsible for the administration and management of all aspects of this SOW. This includes responsibility for all Contractor employees, Subcontractors, Agents, and anyone acting for or on behalf of the Contractor.
This project is to take no longer than 240 calendar days from notice to proceed (NTP). If work is approved during the week (Monday Friday), the contractor will be assigned no more than five (5) rooms at a time in which to perform work. Additional rooms will only be assigned upon satisfactory completion and inspection of the previously assigned rooms. This approach is intended to ensure quality control, minimize disruption to facility operations, and allow for efficient project management.
The contractor shall coordinate with the COR regarding room assignments and completion timelines. Construction: Do not block doorways. Do not store material other than the worksite currently being worked on. Ensure GFCIs are used for all electrical tools. Remove any site obstructions. Maintain proper housekeeping. Maintain dust control to follow requirements in the ICRA permit class. Always use dust mats in place and secure work areas. Use dust barrier zipper doors at each work area.
Use plastic sheeting to cover all furniture at each work area if furniture is not being removed. Post Construction: Contractor shall clean all construction areas and remove all construction debris from site. Contractor shall walk the project with the COR; project is not complete until COR provides final acceptance. Specification and Drawings for Contractor: Drawings and contract documents may be obtained from the website where the solicitation is posted.
Additional copies will be at Contractor's expense. Records Management Requirements: A.  Applicability This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists.  B.  Definitions Federal record as defined in 44 U.S.C. § 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them.  The term Federal record: includes VHA records. does not include personal materials. applies to records created, received, or maintained by Contractors pursuant to their VHA contract. may include deliverables and documentation associated with deliverables.
C.  Requirements Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation. In accordance with 36 CFR 1222.32, the Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data. VHA and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation.
Records may not be removed from the legal custody of VHA or destroyed except in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage, or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, the Contractor must report to VHA. The agency must report promptly to NARA in accordance with 36 CFR 1230.
The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records, or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records, and/or equipment is properly protected.
The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records, and/or equipment is no longer required, it shall be returned to VHA control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand-carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle].
Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4). The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material, and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and VHA guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.
The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with VHA policy. The Contractor shall not create or maintain any records containing any non-public VHA information that is not specifically tied to or authorized by the contract. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act. The VHA owns the rights to all data and records produced as part of this contract.
All deliverables under the contract are the property of the U.S. Government for which VHA shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20. Training. Â All Contractor employees assigned to this contract who create, work with or otherwise handle records are required to take VHA-provided records management training.
The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training. [Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.] D.  Flow down of requirements to subcontractors The Contractor shall incorporate the substance of this clause, its terms, and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.
ATTACHMENTS: The following list of documents are attached to this SOW for contractor use and incorporation into the project documents: Current Flooring Plans (see Attachment 1 - BLDG 650 Mather 2nd and 3rd Floor Carpet Replacement Current Flooring) Flooring to be used per room (Exhibit A - BLDG 650 2nd and 3rd Floors Room Flooring Replacement) NOTE: Contractor shall field verify accuracy of all attachments and RFI if something is not clear. END OF STATEMENT OF WORK 10/14: Amendment 0001- add definitions 11/4: Amendment 0002- Attach site visit sign-in sheet and contractor certification regarding safety and environmental 11/13: Amendment 0003- RFI responses, add updated attachments, extend bid due date.
11/17: Amendment 0004- Additonal RFI responses, add attachments, extend bid due date. 11/18: Amendment 0005- Additional RFI responses
As published on SAM.gov.
Contacts
- Kayla A Haruguchi, Contract Specialist, kayla.haruguchi@va.gov
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at Department of Veterans Affairs for the same kind of work (NAICS 236220, service code Z2DA) in California that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Canteen RemodelVetgov Construction, Inc. · 36C26226C0324 | $238,500 | Nov 30, 2026within a month | CA |
| Construction Services Contract Finishes IDIQ 2025 Task Order 3Iaw Construction, Inc. · 36C26226N0637 | $220,682 | Dec 1, 2026within a month | CA |
| Emergency Flood Water Remediation-East Wing 2-5JT West Construction, Inc. · 36C26226C0325 | $981,300 | Nov 16, 2026ended | CA |
| Vaglahs Wla B500 Stairwell Emergency Sewage and Asbestos RemovalWalter Thomas & Associates, Incorporated · 36C26226C0331 | $424,804 | Dec 7, 2026within a month | CA |
| Valbhs Icu Room 346 and 347 Emergency Waste Disposal Machine Replacements and UPS RepairIaw Construction, Inc. · 36C26226P1625 | $245,800 | Dec 7, 2026within a month | CA |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 19, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Today, 12:00 PM PTTuesday, Nov 24
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 236220, commercial and institutional building construction, soonest deadline first.
- Department of Veterans AffairsHistoric lodge renovation at Fort McPherson, Maxwell, NE
- Department of Veterans AffairsRemodel ENT procedure rooms, Jesse Brown VA, Chicago, IL
- Department of Veterans AffairsFlooring and X-ray electrical work at Bath VA, NY
- Department of the ArmyNotice to Industry - LVN B95 Fire Station Addition
- Department of the ArmyNotice to Industry - LVN B95 Fire Station Addition
- Office of the Assistant Secretary for Administration and ManagementRoof, HVAC and seismic upgrades at Clearfield Job Corps, UT
- Department of the NavySteam plant design-build at NSA Bethesda, MD
- Department of the NavyHeat pump and HVAC replacement at Camp Lejeune, NC
Free · at most one email a morning
Get new notices from Department of Veterans Affairs by email
Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy