Flooring and X-ray electrical work at Bath VA, NY

Bath VA Medical Center wants a contractor to replace flooring in Rooms 140 and 140A of Building 76 and add electrical and anchoring work for a new X-ray machine.

Official title: Z1DA--Project # 528A6-26-607 Replace Flooring for Rm. 140 B76 | Bath VAMC

Deadline
Today, 11:00 AM ET
Tuesday, Nov 24
Who can bid
Not stated
The notice names no set-aside
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Not stated
Buyer: 242-Network Contract Office 02 (36C242)

What they're buying

The work must finish within 60 days of the Notice to Proceed, and the attached solicitation says it is a 100% SDVOSB set-aside.

Top catches

Set-aside status conflicts
“This is a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) set aside procurement.” 36C24227B0004_1.docx

The SAM record says set-aside not stated, but the attached SF 1442 says this is a 100% SDVOSB set-aside. Confirm your SDVOSB status and DSBS listing before you spend time on a bid, and ask the contracting officer in writing to resolve the conflict.

Email-only bid due Tuesday 11 AM
“Bids are due by 11 AM E.T on Tuesday, November 24, 2026.” 36C24227B0004_1.docx

Bids are due Tuesday, November 24, 2026 at 11 AM ET and must be emailed to the contracting officer. Mailed or hand-carried bids are not accepted, and the deadline is strict.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 6 of 10 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Remove existing vinyl flooring in Building 76, Rooms 140 and 140A and install fully welded seam vinyl sheet flooring with a 6-inch integral cove base and transition strips.
  • Relocate the electrical feed for the new X-ray machine, add a new enclosed circuit breaker, and run power cables and conduits to the X-ray control box.
  • Provide structural support for the X-ray equipment, including floor, ceiling and wall anchoring.
  • Prepare an Excel submittal log and submit shop drawings and product data, allowing at least 14 calendar days for COR review of each submittal.
  • Provide a safety plan, an OSHA competent person on site, and training records before work starts.
  • Warrant all work for 1 year from acceptance and return work areas to their original condition.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Set-aside status conflicts. The SAM record says set-aside not stated, but the attached SF 1442 says this is a 100% SDVOSB set-aside. Confirm your SDVOSB status and DSBS listing before you spend time on a bid, and ask the contracting officer in writing to resolve the conflict.
  • Email-only bid due Tuesday 11 AM. Bids are due Tuesday, November 24, 2026 at 11 AM ET and must be emailed to the contracting officer. Mailed or hand-carried bids are not accepted, and the deadline is strict.
  • Bid bond and certificates required. The bid guarantee is 20 percent of the bid price or $3,000,000, whichever is less, and the bid must include copies of the original bid bond. The Buy American and limitations of subcontracting certificates must also be received with the bid.“The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.” 36C24227B0004_1.docx
  • 60 days includes submittal review. The 60-day period starts with submittals and ends with the final punch list, so review time is inside the contract window. Plan your submittal schedule and crew start to fit that window before you price the job.“This includes all processes starting with submission and approval of all submittals and ending with final punch list completion.” 36C24227B0004_1.docx
  • Flooring type conflicts with drawings. A bidder's question says drawing A100 calls for LVT with a flash cove, while the statement of work calls for welded vinyl sheet with an integral cove. The reply points to the statement of work, but the drawing was not reviewed, so confirm the flooring before you price it.“Sheet A100 calls for LVT with a 6-inch flash cove.” Request for Information.docx
  • Do not price New York sales tax. Bids are presumed to reflect the New York sales tax exemption for materials, so bids should leave out state and local sales and use tax on materials. Remove that tax from your material costs unless the notice says otherwise.“all bids received in response to this solicitation are presumed to reflect this tax exemption” 36C24227B0004_1.docx

Key terms

Who can bid100% SDVOSB set-aside (attachment); SAM record says not statedYou also need a SAM registration with a Unique Entity Identifier, SDVOSB certification in DSBS, and an annual VETS-4212 report.36C24227B0004_1.docx
Contract period60 calendar days from Notice to ProceedThe 60 days include submittal review and final punch list completion.Notice text
How to submitEmail only to idalia.algarin@va.govMailed and hand-carried bids are not accepted. The bid bond and two certificates must come with the bid.36C24227B0004_1.docx
Questions duePassed: Tuesday, November 10, 2026 by 12 noon ETQuestions had to be in writing to the contracting officer.36C24227B0004_1.docx
Estimated valueMagnitude of construction $25,000 to $100,000This is a range from the SF 1442 attachment, not an official estimate.36C24227B0004_1.docx
Contract typeFirm-fixed-priceThe government contemplates a fixed price for the full scope as written.36C24227B0004_1.docx
Site visitHeld November 3, 2026 at 10 AM ET; no further visitsAttendance was strongly encouraged, not required. Amendment 0002 says no second visit is scheduled.36C24227B0004_1.docx

How to respond

  1. Resolve the set-aside conflict first: confirm your SDVOSB status and ask the contracting officer in writing at idalia.algarin@va.gov. The question deadline of November 10, 2026 has passed, so an answer is not promised.
  2. Obtain an original bid bond for 20 percent of your bid price or $3,000,000, whichever is less, and include copies with your bid.
  3. Complete the SF 1442 offer section (items 14 to 20, including amendment acknowledgments), the Buy American certificate (52.225-2), and the VAAR 852.219-75 limitations of subcontracting certificate. Both certificates must be received with the bid.
  4. Email the complete bid to idalia.algarin@va.gov so it is timestamped by 11 AM ET on Tuesday, November 24, 2026. File format and size limits: Not stated. Bid opening is at 11:30 AM ET the same day on Microsoft Teams.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Wage determination (file P07 WAGE DETERMINATION) was not reviewed by us; you must read it to price labor.
  • Contract drawings were not reviewed by us; you must read them to confirm flooring, electrical and anchoring details.
  • Limitations of Subcontracting Certificate (VAAR 852.219-75) was not reviewed by us; you must read it and return it with your bid.
  • Specification pages 35 to 326 were not provided; you must read them.
  • Official estimated value is not stated; only a magnitude range is given.
  • Evaluation and award method is not stated beyond firm-fixed-price and a reference to the apparent low bidder.

Notice text

Presolicitation Notice Presolicitation Notice Page 3 of 3 Solicitation *=Required Field Presolicitation Notice Page 1 of 3 DESCRIPTION Presolicitation Notice Presolicitation Notice Page 4 of 4 *=Required Field Presolicitation Notice Page 1 of 4 Page 1 of Page 1 of This solicitation notice is to inform potential offerors that Bath, NY VA Medical Center will be posting a solicitation (36C24227B0004) on or about October 28, 2026, for Replace Flooring RM140 B76.

All work is to be performed at the Bath, NY VA Medical Center. General scope of work includes: The general scope of this project is to the replace the existing flooring in Building 76, Rooms 140 and 140A, based on the design documents provided. Additionally, the project encompasses electrical modifications to support the X-ray equipment, including extending power conduits and cables, installing new power switches, providing equipment structural support, and other related work as indicated in the design drawings.

As Building 76 operates as a fully functional medical center, work hours may be restricted, and off-hours work may be necessary to ensure uninterrupted hospital operations, as directed by the Contracting Officer s Representative (COR). The contractor shall complete all work within 60 days of receiving the Notice to Proceed. The Bath VAMC requires a Contractor to perform the construction work necessary to accomplish this goal. The Contractor shall provide all supervision, labor, services, tools, equipment, and materials required to perform work.

Work under this effort is fully described in the project drawings and specifications. Additional administrative and management related requirements are described throughout this document. A brief overview of the construction work will be included with SOW in the solicitation.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 17, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of Veterans Affairs by email

Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy