Triennial electrical testing, Marion VA Medical Center, IL

The VA wants a contractor to inspect, test and maintain the electrical power system at Marion VA Medical Center in Marion, IL, covering about 325 panels, transformers, generators and transfer switches, within 90 calendar days of notice to proceed.

Official title: 657A5-26-111, Triennial Electrical Testing

Due Nov 19, 3:00 PM CT · SDVOSB sole source · Marion, IL

What they're buying

Only certified service-disabled veteran-owned small businesses registered in SAM.gov are eligible for award.

Top catches

Deadline moved by amendments
“HOUR & DATE for Receipt of Offers is EXTENDED to: 11-19-2026 15:00 CST” 36C25526R0186 0003.pdf, page 1

The cover form still shows November 9, 2026. Amendment 0003 sets 3:00 PM CST on Thursday, November 19, 2026, and it overrides earlier dates. Today is November 18, so the deadline is about one day away.

Scheduled site visit has passed
“Contractors not conducting a site visit to validate and verify the level of work shall not be permitted an increase in cost due to unforeseen site conditions or unconfirmed level of effort to complete this contract.” 36C25526R0186.pdf, page 8

The one scheduled site visit was October 20, 2026. If you did not attend, you cannot ask for more money later for unforeseen site conditions, so ask the contracting officer how to see the site before you price.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 4 of 13 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Maintenance, inspection and testing of the electrical power distribution system to NETA MTS-2019 and VHA Directive 1028.
  • Test about 325 electrical panels, 10 medium-voltage oil and 5 medium-voltage dry transformers, 120 low-voltage dry transformers, and 220 fused or non-fused switches.
  • Test 6 generators, 25 automatic transfer switches and 6 uninterruptible power supplies, including breakers 225A and larger with primary current injection.
  • Infrared thermographic scan of energized equipment, with written reports for any equipment showing problems.
  • Take part in a 4-hour test of the Essential Electrical System (about 8 to 12 hours of your time) and help fix any problems the test finds.
  • Photograph each component before and after work with date and time stamps, and retest 5% of removed parts for phasing and 10% for reconnection.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Deadline moved by amendments. The cover form still shows November 9, 2026. Amendment 0003 sets 3:00 PM CST on Thursday, November 19, 2026, and it overrides earlier dates. Today is November 18, so the deadline is about one day away.
  • Scheduled site visit has passed. The one scheduled site visit was October 20, 2026. If you did not attend, you cannot ask for more money later for unforeseen site conditions, so ask the contracting officer how to see the site before you price.
  • Equipment counts do not match. The summary says about 325 panels and 120 low-voltage transformers, but Table 1 lists 350 panel-type units and 100 transformers. The VA says you must verify quantities and that Table 1 is not complete, so count the equipment yourself before pricing.“approximately 325 electrical panels” 36C25526R0186.pdf, page 5
  • Utility outage costs go in price. You must include the local utility company's charges for the 4-hour outage test in your bid price. Get the utility's cost before you submit, because the notice puts this cost on you.“The Contractor shall include in their bid proposal all costs associated with the services of the local utility company for the duration of the test.” 36C25526R0186.pdf, page 14
  • Bid bond needed twice. The bid bond must be in the emailed proposal and in the mailed hard copy, both by the closing date. The performance and payment bond boxes also appear to be marked as required, so check your bonding capacity now.“Bid Bond shall be included in emailed proposal and hard copy mailed to address in block 8 by proposal closing date.” 36C25526R0186.pdf, page 1
  • SAM.gov label conflicts with rules. The SAM.gov record calls this a sole source buy, but the solicitation asks for competing offers judged by LPTA. Ask the contracting officer which applies before you spend time on a proposal.“Service-Disabled Veteran-Owned Small Business (SDVOSB) Sole Source (FAR 19.14)” SAM.gov record

Key terms

Who can bidCertified service-disabled veteran-owned small businesses registered in SAM.govJoint ventures must meet the same rule. The size standard for NAICS 238210 is $19.0 Million.36C25526R0186.pdf, page 1
Contract period90 calendar days from notice to proceedPerformance must begin within 10 calendar days after notice to proceed, per Item 11.36C25526R0186.pdf, page 1
How they chooseLowest price technically acceptable (LPTA)Offers that do not provide the required documents are rated unacceptable. Award is made on item 0001.36C25526R0186.pdf, page 1
How to submitEmail to Maria Hoover and Kevin Mahoney, plus a mailed hard copy with the bid bondYou must verify with the contracting officer that the email and attachments were received.36C25526R0186.pdf, page 1
Questions duePassed: October 23, 2026, 3:00 PM CDTQuestions went by email to the two named contacts. This date is before today.36C25526R0186.pdf, page 1
Estimated value$500,000.00 to $1,000,000.00 (estimate)This is the government's estimate of the construction magnitude.36C25526R0186.pdf, page 1
Contract typeConstruction contract, single line item priced as one job (unit JB)The price schedule has one line, item 0001.36C25526R0186.pdf, page 1
Site visitPassed: October 20, 2026, 10:45 AM CTThe one scheduled visit was at Bldg. 15. See the catches for what this means for your price.36C25526R0186.pdf, page 1

How to respond

  1. Sign Amendment 0003 and return it with your proposal. The notice says signature is required, but the number of copies and the return address are not stated in the part we received.
  2. Email your full proposal to maria.hoover@va.gov and kevin.mahoney3@va.gov before 3:00 PM CST on Thursday, November 19, 2026. One line of the notice shows Mahoney's address without the @ sign, so use kevin.mahoney3@va.gov after you confirm it.
  3. Include the bid bond, the qualification items A through J in Section 3 of the statement of work, technician certifications, the quality control plan and sample test sheets in the emailed proposal.
  4. Mail a hard copy with the bid bond to Network Contracting Office 15, 3450 S 4th Street Trafficway, Leavenworth KS 66048, so it arrives by the closing date. How the hard copy must be sent is not stated.
  5. Complete and sign the offer form on page 2 of the solicitation, including Items 14 to 20, and list Amendments 0001, 0002 and 0003 with their numbers and dates. Then ask the contracting officer to confirm the email and attachments were received.

Attached files

Not stated in what we read

  • Bid guarantee amount and the number of days after award to furnish performance and payment bonds: Not stated in the part we received.
  • Electrician wage rates for Marion County in the Davis-Bacon wage determination: the pages we received cover other trades only.
  • Insurance minimums (section 4.5, Supplemental Insurance Requirements): not in the part we received.
  • What Amendment 0001 changed: its text did not extract cleanly, so we could not review it.
  • Contents of the equipment inventory spreadsheet, one-line drawings, previous triennial results, building drawings and the sign-in sheet: we could not review them. You must read them on SAM.gov.
  • Number of copies and return address for the signed Amendment 0003: Not stated.

Notice text

657A5-26-111, Triennial Electrical Testing

As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 18, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of Veterans Affairs by email

Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy