Open · due tomorrow · Small business set-aside
Replace AV systems at Oregon Trail center, Baker City, OR
Replace the audio-visual systems at the National Historic Oregon Trail Interpretive Center near Baker City, Oregon, including theaters, exhibit galleries, touch screens, stage lights and a green screen studio.
Official title: T--NHOTIC AV SYSTEM REPLACEMENT
Due Nov 20, 5:00 PM PT · Small business
What they're buying
This is a small business only, firm fixed price contract running from 12/01/2026 to 11/30/2028.
Top catches
“A. Extended due date to 20 November.” Sol_140L4326Q0126_Amd_0004.pdf, page 2
Amendment 0004 moved the due date to November 20 but gives no time. The 5:00 PM time and PD zone come from the original form, while SAM.gov shows -08:00. Submit well before 5:00 PM and confirm the time with the contracting officer.
“Scope is delivery and ensuring they are in working order.” Questions_and_Answers_Nov_17_0006.xlsx
Later answers say the government installs the reader rails, kiosk, table and monitors. Price supply, delivery, a power-on test and packaging removal only. Do not price mounting or installation for Item 0020.
Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 11 of 43 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Exhibit galleries, two encampments, Flagstaff Gallery and three small theaters: media players, touch panels, speakers, power sequencing and hearing assist (Item 0010).
- Facility PA system: amplifiers, mixer, push-to-talk mic and up to 20 ceiling speakers, reusing existing wiring where it works (Item 0010).
- Touch screen interactives: six 34-inch reader rails, one kiosk, one 86-inch table and two 43-inch monitors, supply and delivery only (Item 0020).
- Leo Adler Theater: 5.1 sound, projector and screen up to 11 feet tall, Blu-ray, wireless mics, two control tablets and all AV electrical work (Item 0030).
- Leo Adler Theater stage lights replacing 19 halogen fixtures, with light control (Item 0040).
- Green screen tele-learning studio, including a camera and tripod (Item 0050).
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Deadline time comes from old form. Amendment 0004 moved the due date to November 20 but gives no time. The 5:00 PM time and PD zone come from the original form, while SAM.gov shows -08:00. Submit well before 5:00 PM and confirm the time with the contracting officer.
- Touch screens are supply only. Later answers say the government installs the reader rails, kiosk, table and monitors. Price supply, delivery, a power-on test and packaging removal only. Do not price mounting or installation for Item 0020.
- Hearing assist system is open-ended. The government wants you to design the hearing assist system and does not fix the number of transmitters. State your design, quantities and assumptions in the quote, since the government accepts stated assumptions and allowances.“The vendor shall propose a hearing assist system, to create coverage of the center.” Questions_and_Answers_Oct_7_0002.xlsx
- Confirm size standard for 238210. The original form listed NAICS 334310 with a size standard of 750. An amendment changed the NAICS to 238210, but the text gives no size standard for 238210. Check your size against that standard before you quote, because the set-aside requires small status.“A. Corrected NAICS to 238210 Audio visual equipment installation.” Sol_140L4326Q0126_Amd_0002.pdf, page 2
- Weekend work needs COR approval. Section H bars Saturday, Sunday and federal holiday work unless the COR authorizes it. A November answer says work may run Monday to Sunday. Get written COR approval for weekend crews before you schedule the work.“No work will be done on Saturday, Sunday, or Federal holidays unless authorized by the COR.” Sol_140L4326Q0126.pdf, page 31
- Subcontracting cap of 75 percent. Section I includes the limitation on subcontracting clause. Its text sets a 75 percent cap for special trade contractors, and this NAICS is 238210. Plan for your own staff to do most of the work, and confirm with the contracting officer which cap applies.“Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the” Sol_140L4326Q0126_Amd_0002.pdf, page 35
Key terms
| Who can bid | Small businesses only (total set-aside)Set-aside confirmed by the October 28 answers. The text gives no size standard for NAICS 238210.SAM.gov record |
|---|---|
| Contract period | 12/01/2026 to 11/30/2028Delivery date on the form is 12/31/2028.Sol_140L4326Q0126_Amd_0005.pdf, page 2 |
| How they choose | Most advantageous to the Government, price and other factorsTechnical, past performance and price are listed. Their relative weight is not stated.Sol_140L4326Q0126.pdf, page 40 |
| How to submit | Email to matthew_duane@ios.doi.gov in two parts: non-price and priceNo page limit, file format or subject line is stated.Sol_140L4326Q0126.pdf, page 38 |
| Questions due | About Wed, Nov 18, 2026 (two business days before close)Send questions by email to matthew_duane@ios.doi.gov today.Sol_140L4326Q0126.pdf, page 38 |
| Contract type | Firm fixed price, lump-sum commercial servicesFive lump-sum items (0010 to 0050). Milestone payments may be arranged after award.Sol_140L4326Q0126.pdf, page 3 |
| Site visit | Urged and expected; not stated as requiredContact Robert (Bobby) Reis, (541) 523-1842, rreis@blm.gov. Skipping the visit cannot support a claim after award.Sol_140L4326Q0126_Amd_0004.pdf, page 2 |
How to respond
- Email any questions to matthew_duane@ios.doi.gov today, since the notice cuts questions off two business days before close.
- Email one quote to matthew_duane@ios.doi.gov by Friday, November 20, 2026, 5:00 PM (-08:00). Subject line and file format: Not stated.
- Send two parts: a non-price section answering Factor 1 (technical plan) and Factor 2 (past performance on similar contracts), and a separate price section with unit price and extended total for Section B items 0010 to 0050.
- Complete the Buy American certificate in Section K of Amendment 0002, and keep your SAM.gov representations and certifications current.
- State your assumptions for the hearing assist design, the AV electrical work and the touch screen supply in your quote, as the November 17 answers allow.
Attached files
- Sol_140L4326Q0126_Amd_0001.pdfAmendment 0001 adding the site visit note and contact. Read only; it does not change the price schedule. Read.
- Sol_140L4326Q0126_Amd_0004.pdfAmendment 0004 moving the due date to November 20, adding a diagram and attaching the October 28 answers. Read it. Read.
- Questions_and_Answers_Oct_28_0004.xlsxAnswers on set-aside NAICS, touch panel counts, payment and bonds. Read it; it includes the no liquidated damages answer. Read.
- Questions_and_Answers_Oct_7_0002.xlsxEarly answers on exhibit, theater and lighting scope. Read it; several answers change equipment and scope. Read.
- Sol_140L4326Q0126.pdfThe original solicitation with the statement of work, clauses and quote instructions. Pages 20 to 30 were not provided. You must read the price schedule and quote instructions and fill in the price schedule. Read in part (pages 1–19 and 31–40 of 40).
- Sol_140L4326Q0126_Amd_0002.pdfAmendment 0002 with corrected NAICS, clauses and the Buy American certificate. Pages 20 to 32 were not provided. You must complete the Section K certificate. Read in part (pages 1–19 and 33–43 of 43).
- Sol_140L4326Q0126_Amd_0005.pdfAmendment 0005 attaching the November 10 answers and confirming the period of performance. Read it. Read.
- Sol_140L4326Q0126_Amd_0003.pdfAmendment 0003 extending the due date to November 13, now superseded by Amendment 0004. Read only. Read.
- B03_Wage_Determination_0002.pdf Not read: over our length limit.
- Questions_and_Answers_Nov_10_0005.xlsxAnswers on installation, payment, insurance, warranty and work access. Read it; some answers conflict with the statement of work. Read.
- Sol_140L4326Q0126_Amd_0006.pdfAmendment 0006 attaching the November 17 answers. Read it first, since it is the latest notice. Read.
- Plan_of_Center_Rooms_0004.pdf Scanned image, not read.
- B03_Wage_Determination.pdf Not read: over our length limit.
- Questions_and_Answers_Nov_17_0006.xlsxThe latest answers: touch screens are supply only and assumptions may be stated. Read it before you price. Read.
- AV Booth inside 1.jpg Could not be read.
- AV Booth inside 2.jpg Could not be read.
- AV Booth.jpg Could not be read.
- Blue Mt Encampment.jpg Could not be read.
- Electrical room.jpg Could not be read.
- Fee booth location for touchscreen monitor.jpg Could not be read.
- Info Desk Location for touch screen monitor.jpg Could not be read.
- Leo Adler Theater AV Rack 2.jpg Could not be read.
- Leo Adler Theater AV rack 4.jpg Could not be read.
- Leo Adler theater AV rack 5.jpg Could not be read.
- Leo Adler Theater AV rack.jpg Could not be read.
- Leo Adler Theater Dimmers.jpg Could not be read.
- Leo Adler Theater Fuse Box.jpg Could not be read.
- Leo Adler theater light bar stage left.jpg Could not be read.
- Leo Adler Theater Light Bar stage right.jpg Could not be read.
- Leo Adler Theater lights stage left.jpg Could not be read.
- Leo Adler theater lights stage right.jpg Could not be read.
- Leo Adler Theater toward stage.jpg Could not be read.
- Leo Adler Theater towards AV booth.jpg Could not be read.
- location for touch screen table.jpg Could not be read.
- location for touchscreen kiosk.jpg Could not be read.
- Main Gallery.jpg Could not be read.
- PA speaker example.jpg Could not be read.
- PA system.jpg Could not be read.
- Theater 1.jpg Could not be read.
- Theater 2.jpg Could not be read.
- Theater 3.jpg Could not be read.
- Theater Booth cat5 entrance point.jpg Could not be read.
- trade encampment.jpg Could not be read.
Not stated in what we read
- Estimated value: the government has a budget figure but will not share it.
- Service Contract Act wage determination: we could not review the two wage determination files left out for length. You must read them before you price labor.
- Relative weight of technical, past performance and price in the award decision.
- Whether the annual maintenance cost estimate requested by the government is part of the evaluated price.
- Payment milestone schedule: the government says it will be discussed after award.
- Pages 20 to 30 of the solicitation (rest of the statement of work and later sections) were not provided to us. Read them on SAM.gov.
Notice text
NHOTIC AV SYSTEM REPLACEMENT
As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.
Contacts
- Duane, Matthew, matthew_duane@ios.doi.gov, 5038086317
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 18, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Similar open notices
Open now under NAICS 238210, electrical contractors and other wiring installation contractors, soonest deadline first.
- Department of Veterans AffairsTriennial electrical testing, Marion VA Medical Center, IL
- Department of the ArmyGathright Dam Motor Control Center Electrical Repairs in Covington, Virginia
- Department of the NavyElectrical wiring job orders at Barstow and China Lake, CA
- Forest ServiceFernan Ranger Station lift station electrical repair
- Department of Veterans AffairsTriennial Circuit Breaker and Feeder Testing
- Department of the ArmySubstation electrical repairs at Fort Buchanan, PR
- Department of the ArmyContractor to Relocate Customer Repeater system and complete tasks listed on the attached Scope of Work (SOW) at the Watervliet Arsenal, NY.
- Department of Veterans AffairsAutomatic Transfer Switch (ATS) Preventive Maintenance and Repair Services, and Isolation Power Panel Inspection
Free · at most one email a morning
Get new notices from Bureau of Land Management by email
Each morning we'll send the new solicitations and sources-sought notices from Bureau of Land Management, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy