- Opportunities
- Department of Homeland Security
- US Coast Guard
- 75150PR270000011
Two modified containers for San Diego and Oceanside, CA
The Coast Guard is buying two modified 20-foot shipping containers with insulation, a heater, barred windows, personnel doors and finished flooring.
Official title: 75150PR270000011 - MODIFIED CONEX CONTAINERS - USCG STATION POINT LOMA
- Deadline
- Dec 1, 12:59 PM PT
- 5 days left
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- San Diego, CA
- Buyer: Base La - Long Beach
What they're buying
One goes to Camp Pendleton in Oceanside and one to Coast Guard Station Point Loma in San Diego, delivered within 30 days or earlier.
Top catches
“Review entire scope of work for all specifications” Notice text
A requirements image file on SAM.gov could not be read for this summary. Open it on SAM.gov and check it before you price, because it may hold specifications that the SOW does not show.
“Award will be made on a Lowest Price Technically Acceptable (LPTA) basis.” Notice text
Price decides the award once your container meets the minimum specs. Hold your price valid for at least 30 days, as the SOW requires.
Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 1 of 2 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Two 20-foot standard shipping containers, modified for use
- Insulation panels installed throughout each container
- A heating unit in each container
- Windows with security bars and personnel or access doors
- Finished flooring installed in each container
- Delivery to two sites, FOB Destination, with a bed lift for ground-level placement
Who supplied it lately
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Requirements file not reviewed. A requirements image file on SAM.gov could not be read for this summary. Open it on SAM.gov and check it before you price, because it may hold specifications that the SOW does not show.
- Lowest price wins. Price decides the award once your container meets the minimum specs. Hold your price valid for at least 30 days, as the SOW requires.
- Vague specifications, no sizes. The SOW names each feature but gives no sizes, materials, heater type or window count. Ask the contracting officer for exact specs before you price, because a quote that misses one spec may be rejected.“Window(s) with security bars installed.” Scope_of_Work_Specifications_Modified_Shipping_Containers.docx
- Delivery clock start not stated. The 30-day delivery period has no stated start date. Ask whether it runs from award or from order, and price your schedule to fit the shorter reading.“Delivery Schedule: 30 days or earlier.” Notice text
- FOB destination delivery costs. Under FOB Destination you likely carry the cost of shipping to both sites. The bed lift for ground-level placement must also be in your price.“Delivery is FOB Destination and must include a bed lift for ground-level placement.” Notice text
- Camp Pendleton base access. You must meet all base access rules for the Camp Pendleton delivery. Check those rules and any vetting steps before you commit to a delivery date.“The Contractor must ensure they meet all base access requirements for the Camp Pendleton delivery.” Scope_of_Work_Specifications_Modified_Shipping_Containers.docx
Key terms
| Who can bid | Open to all (no set-aside)Size standards and registration rules are not stated in the provided text.SAM.gov record |
|---|---|
| Contract period | Delivery within 30 days or earlierThe start date for the 30 days and the length of any contract are not stated.Notice text |
| How they choose | Lowest Price Technically Acceptable (LPTA)The lowest price among quotes that meet the minimum specifications wins.Notice text |
| Contract type | Commercial items, FOB DestinationCommercial-item buy under FAR 12.6. Delivery is FOB Destination, so you likely pay to ship to both sites.Notice text |
How to respond
- Open the requirements PNG file and the SOW on SAM.gov and read both before you price. The PNG could not be reviewed here.
- Price two containers, each with insulation, a heater, barred windows, personnel doors, finished flooring and a bed lift, delivered FOB Destination to both sites.
- Submission method and address: Not stated. Check the full SAM.gov notice for how to send your quote.
- Hold your quote valid for at least 30 days and send it by Tuesday, December 1, 2026, 12:59 pm Pacific Time.
- Contact site contact Ivan Aceves at 626-824-6830 to set delivery times, and confirm the Camp Pendleton base access rules.
Attached files
From SAM.gov. Download links open the original files.
- Conex requirements .png Could not be read.
- Scope_of_Work_Specifications_Modified_Shipping_Containers.docxStatement of work listing the container specifications, the two delivery addresses and the 30-day quote validity. You read it to price your quote. No form to fill in. Read.
Not stated in what we read
- How and where to send your quote; the submission method is not stated.
- Estimated value or budget for the purchase.
- Exact specifications such as sizes, heater type, insulation type and window count, plus the content of the requirements PNG file.
- Start date for the 30-day delivery period.
- Questions deadline and whether a site visit is offered.
- Camp Pendleton base access steps and any vetting needed.
Notice text
This is a combined synopsis/solicitation for commercial items in accordance with FAR Subpart 12.6. The Government intends to procure two (2) modified 20-foot shipping containers. Minimum technical specifications for each container include: (Review entire scope of work for all specifications) 20-foot insulation panels A heating unit Windows with security bars Personnel doors Finished flooring. Delivery is FOB Destination and must include a bed lift for ground-level placement. One container will be delivered to Marine Corps Base Camp Pendleton (Oceanside, CA) and the other to San Diego, CA. Delivery Schedule: 30 days or earlier. Award will be made on a Lowest Price Technically Acceptable (LPTA) basis. Submissions are due by 12:59pm Tuesday, December 1, 2026 Pacific Time.
As published on SAM.gov.
Contacts
- Ryan H. King, ryan.h.king2@uscg.mil, 5716135679
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 19, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 1, 12:59 PM PT5 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 332311, prefabricated metal building and component manufacturing, soonest deadline first.
- US Coast GuardScaffolding and wrap for 49-foot cutter, Curtis Bay, MD
- Department of the ArmyRepairs to ten Sprung shelters, Fort Wainwright, AK
- National Aeronautics and Space AdministrationDeployable payload enclosure at Kennedy Space Center
- Department of the Air ForceBlast booth building for corrosion control, Tucson, AZ
- Department of the Air ForceModular wall enclosure kit at Tinker AFB, OK
- Department of the ArmyS-280C/G vehicle shelters, delivered to Herlong, CA
- Department of the ArmySteel building erection at Granger Lake, TX
Free · at most one email a morning
Get new notices from US Coast Guard by email
Each morning we'll send the new solicitations and sources-sought notices from US Coast Guard, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy