Deployable payload enclosure at Kennedy Space Center

NASA's Kennedy Space Center is asking industry for information on a rapidly deployable, relocatable enclosure for launch-site payload work, including hazardous propellant servicing.

Official title: 80KSC026RDPPS - Rapidly Deployable Payload Processing Structure (RDPPS)

Deadline
Dec 11, 4:00 PM ET
15 days left
Who can respond
Any business
Market research, not a bid
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Orlando, FL
Buyer: NASA Kennedy Space Center

What they're buying

This is a Request for Information, not a bid, and responses are due Friday, December 11, 2026 at 4:00 p.m. ET; the contract length is not stated.

Top catches

Email-only submission with strict rules
“All responses must be submitted via email to Victoria.C.Hargrave@nasa.gov and Hillary.P.Heard@nasa.gov, not later than 4:00 P.M. ET, December 11, 2026.” 80KSC026RDPPS RFI.pdf, page 9

Send your response by email only, not through SAM.gov. The subject line must reference RFI 80KSC026RDPPS, and attachments must stay under 20MB. A response sent late or to the wrong place may not be counted.

Only builders and integrators wanted
“This RFI is not soliciting traditional Architectural and Engineering (A&E) design services, conceptual studies, or permanent brick-and-mortar construction solutions.” 80KSC026RDPPS RFI.pdf, page 2

NASA says it wants responses only from manufacturers, fabricators and system integrators. If you only offer design, engineering or study services, this notice is probably not written for you.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 20, 2026 from the notice and 1 of 1 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Enclosure with ISO Class 8 cleanliness baseline for spacecraft integration, hypergolic propellant servicing, and fairing encapsulation
  • Structure able to take a payload fairing up to 10 m in diameter and 28 m tall
  • Certified overhead lifting, with a 30-ton planning benchmark
  • Hazardous-area electrical to NFPA 70 Class I, Division 2 or Zone 2, plus vapor scrubbing and fuel and oxidizer separation
  • Coastal durability to ASCE 7-22 and Florida Building Code, including hurricane tie-down and corrosion protection
  • Rapid erection and strike timelines, plus a rough order of magnitude cost table in constant 2026 dollars

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Email-only submission with strict rules. Send your response by email only, not through SAM.gov. The subject line must reference RFI 80KSC026RDPPS, and attachments must stay under 20MB. A response sent late or to the wrong place may not be counted.
  • Only builders and integrators wanted. NASA says it wants responses only from manufacturers, fabricators and system integrators. If you only offer design, engineering or study services, this notice is probably not written for you.
  • You must define site interfaces. NASA will provide the pad, fencing, and utility tie-ins, but you must define the civil, structural and electrical interface specifications at that boundary. Include the cost of that design work in your rough estimate.“The respondent must define the civil, structural, and electrical interface specifications required at that boundary.” 80KSC026RDPPS RFI.pdf, page 4
  • Responses are unpaid and not a bid. NASA will not pay for responses, and the RFI is not a commitment to buy. Work out the cost of the rough cost table and 18 topics before you decide to respond.“This RFI is not to be construed as a commitment by the Government,” 80KSC026RDPPS RFI.pdf, page 1
  • Small business set-aside possible. NASA may limit any later work to small businesses or other socioeconomic groups based on what it receives. Check your size status under NAICS 332311 and any certifications you hold.“set-aside based on responses received.” 80KSC026RDPPS RFI.pdf, page 1
  • Strict page and sheet limits. Topics 1 to 3 and 5 to 17 share a 15-page limit. Topic 4 is limited to three 11x17-inch sheets. Use 11-point font minimum and 1-inch margins.“fifteen (15) pages total; responses shall correspond to the topic number.” 80KSC026RDPPS RFI.pdf, page 9

Key terms

Who can bidManufacturers, fabricators and system integrators of deployable structuresArchitectural and engineering design services and conceptual studies are not being sought.80KSC026RDPPS RFI.pdf, page 2
How to submitEmail to Victoria.C.Hargrave@nasa.gov and Hillary.P.Heard@nasa.govSubject line must reference RFI number 80KSC026RDPPS. Email attachments must not exceed 20MB.80KSC026RDPPS RFI.pdf, page 9

How to respond

  1. Write your response as one searchable PDF or Word file with 11-point font minimum and 1-inch margins, answering the topics by number.
  2. Keep Topics 1 to 3 and 5 to 17 within 15 pages total, and limit the Topic 4 layout to three 11x17-inch sheets.
  3. Email the response to Victoria.C.Hargrave@nasa.gov and Hillary.P.Heard@nasa.gov, with RFI 80KSC026RDPPS in the subject line and attachments not over 20MB.
  4. Send it by 4:00 p.m. ET on Friday, December 11, 2026.
  5. Cover pages, signatures and forms: Not stated.

Attached files

From SAM.gov. Download links open the original files.

  • 80KSC026RDPPS RFI.pdfThe full Request for Information describing the structure, its site conditions and the 18 topics to answer. You read it and answer in your own response; no signed form is listed in the text provided. Read.

Not stated in what we read

  • Estimated value or budget for the structure: Not stated; you are asked for a rough cost estimate but no budget is given.
  • Contract period and option years: Not stated.
  • Whether a solicitation will follow, and when: Not stated; the notice says any solicitation would appear on SAM.gov.
  • Contract type and award method: Not stated.
  • Whether the Orlando, FL, 32899 place of performance in the SAM.gov record is the same as the Kennedy Space Center site in the RFI.
  • Whether the 20MB attachment limit applies per file or per email: Not stated.

Notice text

11/19/2026 THIS IS NOT A REQUEST FOR PROPOSAL. NO PROPOSALS ARE TO BE SUBMITTED IN RESPONSE TO THIS NOTICE. This notice is issued by the NASA/Kennedy Space Center (KSC) to post a Request For Information (RFI) to solicit responses from interested parties. This information is for planning purposes and to allow industry the opportunity to verify reasonableness and feasibility of the requirement, as well as promote competition. NASA/KSC is hereby soliciting information from potential sources for a Rapidly Deployable Payload Processing Structure (RDPPS). For details see attached 80KSC026RDPPS RFI. Responses are requested no later than December 11, 2026 at 4:00 p.m ET.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 20, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from National Aeronautics and Space Administration by email

Each morning we'll send the new solicitations and sources-sought notices from National Aeronautics and Space Administration, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy