Parking lot resurfacing at 3 Forest Service sites, Colorado
The Forest Service wants crack sealing, pavement patching, seal coating and re-striping at three parking lots in Boulder, Idaho Springs and Fort Collins, Colorado.
Official title: Administrative Parking Lot Repairs
- Deadline
- Dec 18, 2:00 PM ET
- 23 days left
- Who can bid
- Small businesses
- Size standard for NAICS 237310: $45 million in average annual receipts · Who qualifies
- Last time
- $273K
- Likely GCS LLC
- Place
- CO
- Buyer: USDA-FS, Csa Intermountain 8
What they're buying
Work is scheduled from June 15 to August 15, 2027, with no more than one week at each site.
Top catches
“Quotes Due:November 23rd, 2026 at 14:00 Eastern standard Time (EST).” Notice text
The notice text still says quotes were due November 23, and Amendment 0001 moved it to December 1. Amendment 0002 sets Friday, December 18, 2026 at 14:00 EST, so use that date.
“The offices will still need parking available, so a hybrid /phased work closure would be required” C06_Questions and Clarifications R.docx
The Forest Service says the offices need parking, so work must be phased on weekdays with part of each lot open. Price for that method rather than a full weekend closure.
Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 8 of 10 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Crack and joint sealing and filling, 6,500 linear feet in total (Boulder 2,000; Fort Collins 2,500; Clear Creek 2,000).
- Asphalt sealcoat, 119,450 square feet in total, at a minimum residue rate of 1.0 pound per square yard.
- Infrared pavement patching, 20 patches of 45 square feet each (Boulder 6; Fort Collins 8; Clear Creek 6).
- Permanent pavement striping, one item at each of the three sites, after sealcoating is complete.
- Mobilization, one lump sum item at each of the three sites.
- Weekly written progress reports and submittals for all asphalt products, as the statement of work requires.
Who did it before
$273K
on the contract that likely holds this work now: GCS LLC. It ends Nov 30, 2026.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Old deadlines still printed. The notice text still says quotes were due November 23, and Amendment 0001 moved it to December 1. Amendment 0002 sets Friday, December 18, 2026 at 14:00 EST, so use that date.
- No full weekend closures allowed. The Forest Service says the offices need parking, so work must be phased on weekdays with part of each lot open. Price for that method rather than a full weekend closure.
- 100 percent payment protection in 10 days. Within 10 days of award you must submit payment protection for 100% of the contract price, covering the performance period plus one year. A payment bond must use Standard Form 25A, and no substitute form is accepted.“The amount of the payment protection shall be 100% of the contract price.” C05 1240LT27Q0019.pdf, page 4
- Page limit: 3 or 10 pages. The quote instructions still mention a 10 page criterion, but the Q&A sets 3 pages for the technical approach. The Q&A did not say whether the Gantt chart counts, so keep the narrative and chart within 3 pages to be safe.“Page document Criterion will reflect 3 pages and not 10 for the Technical Approach” C06_Questions and Clarifications R.docx
- Acknowledge both amendments in Block 19. List Amendments 0001 and 0002 in Block 19 of the SF 1442 when you submit your offer. An offer without that acknowledgement will be rejected.“Offerors shall acknowledge all amendments in Block 19 of the SF-1442, at the time of offer, failure to do so will result in the rejection of your offer.” C05 1240LT27Q0019.pdf, page 11
Key terms
| Who can bid | Small businesses only (total set-aside)NAICS 237310. Size standard $45 million.SAM.gov record |
|---|---|
| Contract period | June 15, 2027 to August 15, 2027Start within 10 calendar days after notice to proceed. Work is about one week per site.C05 1240LT27Q0019.pdf, page 3 |
| How they choose | Best value to the Government, not lowest price aloneNo formal trade-off process. Price is still checked for fair and reasonable.C05 1240LT27Q0019.pdf, page 11 |
| How to submit | Email to Jordan.Carlsen@usda.govSend the quote, technical approach and Excel price schedule by email.C05 1240LT27Q0019.pdf, page 11 |
| Questions due | November 6, 2026, 14:00 EST (passed)The question period is closed. Answers are in the Q&A document.Notice text |
| Estimated value | Between $25,000 and $100,000 (project magnitude)Stated as project magnitude in the solicitation, not as a budget.C05 1240LT27Q0019.pdf, page 4 |
| Contract type | Firm fixed price, one awardAll base items must be priced or the quote may be excluded.C05 1240LT27Q0019.pdf, page 11 |
| Site visit | Recommended, not required. Fort Collins visit on Nov 3 has passed.The Fort Collins visit was November 3, 2026 at 10:00 am MST. Contact Steve Wood at 970-295-6751.C05 1240LT27Q0019.pdf, page 11 |
How to respond
- Email your quote to Jordan.Carlsen@usda.gov so it arrives by Friday, December 18, 2026 at 14:00 Eastern Standard Time (EST). Late quotes will be rejected.
- Use the solicitation number 1240LT27Q0019 in the email subject line. The notice wording for the subject line is garbled, so confirm the exact text with Jordan Carlsen.
- Attach a technical approach of no more than 3 pages, not counting the Schedule of Items, in Times New Roman 12 point, with a construction schedule such as a Gantt chart.
- Fill in the Excel Schedule of Items (Attachment 1) for every base line, round each line up to the whole dollar, and add your company name and UEI at the top. Do not send pricing as a PDF.
- Complete the SF 1442 offer section, list Amendments 0001 and 0002 in Block 19, and sign it. A bid guarantee is not required.
Attached files
From SAM.gov. Download links open the original files.
- C06_Questions and Clarifications R.docxForest Service answers on closures, site name, wage determinations, page limit and sealer material. Read it; no form to fill in. Read.
- 1240LT27Q0019.pdfAmendment 0001 on SF 30, which moved the quote date to 12/1/2026 and added the Q&A and Attachment 5. Read it; no form to fill in. Read.
- Attachment 2 - C05 FSSS.pdfForest Service supplemental specifications that change the FP-24 road construction standard. Read it; no form to fill in. Read.
- Attachment 6 C06 Wage Determination C0202600002.pdf Scanned image, not read.
- Attachment 5 C06 416 Specifications Administrative parking lot repairs.pdfSection 416 sealcoat specification covering materials, weather limits and residue-based payment. Read it; no form to fill in. Read.
- C05 1240LT27Q0019.pdfThe solicitation on SF 1442 with clauses, schedule, bonding and evaluation terms. You must complete the offer section and sign it. Read.
- Attachment 4 - C05 Statement of Work.pdfStatement of work with site addresses, the one-week-per-site schedule and reporting duties. Read it; no form to fill in. Read.
- Attachment 3 - C05 Site Maps.pdf Scanned image, not read.
- 1240LT27Q0019 Amendment 2.pdfAmendment 0002 on SF 30, which sets the December 18, 2026 deadline and names the wage determination. Read it and acknowledge it in Block 19. Read.
- Attachment 1 - C05 Schedule of Items.xlsxExcel price schedule for each site's line items. You must price every base line and add your company name and UEI. Read.
Not stated in what we read
- The Government estimated cost of the work, beyond the stated project magnitude range.
- Wage rates. Attachment 6 could not be read here, and the Q&A asked for rates for three counties but got one attachment reference.
- The contents of Attachment 3 site maps, which could not be read here. Read them on SAM.gov.
- Whether the 61 calendar day completion period in Item 11 or the August 15, 2027 end date controls the schedule.
- Payment terms, the progress payment schedule and the length of the warranty. A progress payment clause is listed, but its terms are not stated.
- Whether liquidated damages or other penalties apply for late completion.
Notice text
The purpose of this amendment is the following: The purpose of this modification is to: 1. Extend the proposal due date to 12-18-2026 to allow time for project document updates. 2. Interested parties are encouraged to regularly check back for updates as the requirement will change. This project involves the repair and resurfacing of three parking lots on the Arapaho and Roosevelt National Forest and Pawnee National Grassland including crack sealing, pavement patching, seal coating and re-striping.
NAICS code 237310 - Highway, Street, and bridge Construction as a 100% SB Set Aside. Size standard $45 Million. PSC Code Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, Questions Due: November 6th, 2026 at 14:00 Eastern Standard Time(EST). Quotes Due:November 23rd, 2026 at 14:00 Eastern standard Time (EST). All questions and quotes relating to this Solicitation shall be submitted to Contract Specialist, Jordan Carlsen at Jordan.Carlsen@usda.gov by the deadlines stated above.
Late quotes will be rejected.
As published on SAM.gov.
Contacts
- Jordan Carlsen, Jordan.carlsen@usda.gov, 4633041537
- Lucas Dahlman, lucas.dahlman@usda.gov
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at Forest Service for the same kind of work (NAICS 237310, service code Y1LB) in Colorado that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| This Project Will Result in the Removal of an Existing Culvert, and Installation of a New Aquatic Organism Passage Aluminum Plate Structure, Which Will Sit on Concrete FootingsGCS LLC · 1240LT26F0006 | $272,500 | Nov 30, 2026within a month | CO |
| Restore 8 SJNF Road Bridges to Safe Conditions After October 2025 Flooding and Improve Their Resilience to Future High-Intensity Storm Events.Medved Global Inc · 1240LT26F0067 | $138,395 | Nov 30, 2026within a month | CO |
| Travel Management Implementation Project (Gate Fabrication & Installation)TK3, LLC · 1240LT26F0005 | $101,000 | Dec 1, 2026within a month | CO |
| Award - SPK Eleven Mile Bridges and Guardrail Rehab. Note to Buyer: R2 Road and Bridge Construction MATOCEpic Construction & Environmental Inc. · 1240LT26F0018 | $577,003 | Dec 18, 2026within a month | CO |
| Replacement of West Muddy Creek Bridges #4 and #5 Per Drawings and Specifications. Grand Mesa, Uncompahgre and Gunnison NFGCS LLC · 1240LT26C0003 | $2,402,090 | Jan 30, 2027in 2 months | CO |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 24, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 18, 2:00 PM ET23 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 237310, highway, street, and bridge construction, soonest deadline first.
- Departmental OfficesWaterman canal gate for Wheeler refuge, Decatur, AL
- Department of the ArmyRoads, parking and grounds renovation, Detroit, MI
- Departmental OfficesRoad and bridge repair at national parks nationwide
- Department of the NavyService road realignment and roundabout, Camp Lejeune, NC
- Federal Highway AdministrationThree bridges and a culvert on SR 35, Mimbres, NM
- Federal Highway AdministrationThree bridges and road rebuild in Arches National Park, UT
- Forest ServiceRoad and trailhead upkeep, Little Missouri Grassland, ND
- Department of the Air ForceAirfield rubber removal and striping, Dover AFB, DE
Free · at most one email a morning
Get new notices from Forest Service by email
Each morning we'll send the new solicitations and sources-sought notices from Forest Service, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy