Automated fluidized bed mixers, Pine Bluff Arsenal, AR
The Army Contracting Command - Rock Island seeks vendors for an automated fluidized bed mixer and drying system, with de-clumping, weighing and transfer, for colored smoke energetics at Pine Bluff Arsenal.
Official title: Automated Fluidized Bed Mixer Facility Modernization for end use at Pine Bluff Arsenal – CSO
- Deadline
- Dec 1, 12:00 PM CT
- 6 days left
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Pine Bluff, AR
- Buyer: W6QK ACC-RI
What they're buying
The baseline is at least two mixers of 1,100 liters or more each, and the first step is a Phase 1 solution brief due December 1, 2026; the length of the contract is not stated.
Top catches
“Vendors MUST enter CAGE code or will be rejected.” Attachment 0005 Vendor CSO Phase 1 Submission Document Amendment 0005 Rev 7.pdf, page 2
Facility and electrical drawings are restricted. Request access in SAM.gov using your CAGE code, and have your Data Custodian make the request, or your submission may be rejected.
“NLT COB 14 October 2026” Notice text
The notice text says NLT COB 14 October 2026, which has passed. The SAM.gov record and the amendment set Tuesday, December 1, 2026, at 12:00 p.m. Central, so plan for that time and confirm with the contracting officer.
Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 8 of 10 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Two or more fluidized bed mixer granulators, each at least 1,100 liters, with an optional third mixer if budget allows.
- Open-cycle intake air conditioning and dehumidification using mechanical refrigeration, with no desiccant, designed for 105 F and 90% relative humidity.
- Automated de-clumping, weighing (within plus or minus 1.5%) and transfer of materials, including container unloading and discharge into a 23.6 cubic foot vessel.
- High-speed fire detection and suppression tied into the existing building fire system, with a response of 500 ms or faster.
- Upward-pointing explosion relief vent, fail-safe shutdown on temperature or pressure spikes, and equipment that de-energizes when cubicle doors open.
- Meet 95% operational availability, 95% batch repeatability, the re-blend limit, and the DESR, AR 385-10 and DA PAM 385-64 standards.
Who supplied it lately
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Drawings need SAM.gov access. Facility and electrical drawings are restricted. Request access in SAM.gov using your CAGE code, and have your Data Custodian make the request, or your submission may be rejected.
- Old deadline in notice text. The notice text says NLT COB 14 October 2026, which has passed. The SAM.gov record and the amendment set Tuesday, December 1, 2026, at 12:00 p.m. Central, so plan for that time and confirm with the contracting officer.
- Rating conflict: Class I or not. The packet asks for Class I and II, Division 1 ratings. The Q&A says there is no Class I, Division 1, and that only Class II, Division 1, Groups F and G apply in certain areas. Ask which rating to price before you quote equipment.“There is no Class 1 Div 1.” Attachment 0006 Questions and Answers 2.pdf, page 3
- Re-blend rate wording unclear. Rev 3 says minimum 4%, while the earlier Rev 01 set a maximum of 5.0%. Ask the contracting officer whether 4% is a limit you must not exceed before you commit to a rate.“The FBG must have a minimum re-blend rate of 4%.” Attachment 0001 Fluidized Bed Mixer Facility Statement of Objectives_Rev 3.pdf, page 1
- Two email domains in notice. The notice text lists an address ending in mail.mil. The Statement of Objectives and the amendment use army.mil. Send to the army.mil addresses and confirm with the contracting officer first.“ashley.e.testrake.civ@mail.mil” Notice text
- 30% throughput gain no longer required. The Phase 1 packet still asks for a minimum 30% throughput gain. The Q&A says that is no longer a requirement, so confirm with the contracting officer before you promise it.“A minimum 30% throughput improvement over legacy systems.” Attachment 0002 CONTRACTOR SUBMISSION PACKET.pdf, page 2
Key terms
| Who can bid | Any vendor; no set-asideThe notice seeks qualified vendors with experience manufacturing this kind of system. Traditional and non-traditional contractors may both bid.SAM.gov record |
|---|---|
| How they choose | Government choice after phased review; no award guaranteedThe Government may make multiple awards or no award under this CSO.Attachment 0001 Fluidized Bed Mixer Facility Statement of Objectives_Rev 3.pdf, page 7 |
| How to submit | Email to Ashley Testrake and Michelle Pleasant at the army.mil addressesPhase 1 is a solution brief of 5 pages or less, or a 15-slide deck.Attachment 0001 Fluidized Bed Mixer Facility Statement of Objectives_Rev 3.pdf, page 7 |
| Contract type | Firm-fixed-price (FFP), commercial item under FAR Part 12Phase 3 pricing must be firm-fixed-price, and the Government may negotiate scope and price before award.Attachment 0001 Fluidized Bed Mixer Facility Statement of Objectives_Rev 3.pdf, page 6 |
| Site visit | Only if invited; site visit to Pine Bluff ArsenalA Phase 2 pitch is also by invitation only and gives 15 calendar days to prepare.Attachment 0001 Fluidized Bed Mixer Facility Statement of Objectives_Rev 3.pdf, page 6 |
How to respond
- Email your Phase 1 submission to Ashley Testrake at Ashley.e.testrake.civ@army.mil and Michelle Pleasant at michelle.m.pleasant.civ@army.mil by Tuesday, December 1, 2026, 12:00 p.m. Central Time.
- Use the Contractor Submission Packet: a solution brief of 5 pages or 15 slides, plus the chemical compliance table, commercial specification sheet and ROM pricing.
- Send PDF, Word or PowerPoint files only, each email under 10MB, pre-scanned for malicious code, with no zip files or cloud links.
- Include your CAGE code and an email address, and have the submission signed by a corporate officer or an individual authorized in writing by one.
Attached files
From SAM.gov. Download links open the original files.
- Attachment 0006 Questions and Answers 2.pdfLater set of answers dated 17 November 2026 on ratings, throughput, validity and fire systems. Read in full; it may override earlier text. Read.
- Attachment 0004 Questions and Answers 1.pdfFirst set of government answers on site visits and equipment quantities. Read in full; you do not sign it. Read.
- Attachment 0009 32-620ME-52 Glatt Transportainer.pdfDrawing of the Glatt transportainer, the vessel the finished mix is poured into. Read it for size and handling; you do not sign it. Read.
- Attachment 0005 Vendor CSO Phase 1 Submission Document Rev 3 Amended.pdf Older version, not read.
- Attachment 0001 Fluidized Bed Mixer Facility Statement of Objectives_Rev 3.pdfCurrent Statement of Objectives dated 10 November 2026, with the solution requirements and phases. Read in full; you do not sign it. Read.
- Attachment 0005 Vendor CSO Phase 1 Submission Document Rev 6 Amendment 0004.pdf Older version, not read.
- Attachment 0001 A02. 20260701 Fluidized Bed Mixer Facility Problem Statement; Rev 01 03 Aug 2026_.pdfOlder Rev 01 problem statement dated 3 August 2026. You must read it for its conflicting terms, such as the 30% throughput and 5.0% re-blend limits, and confirm with the contracting officer which version governs. Read.
- Attachment 0002 CONTRACTOR SUBMISSION PACKET.pdfPhase 1 response form you fill in and return: cover data, solution brief, chemical compliance table, specification sheet and ROM pricing. Phase 3 sections apply only if you are invited. Read.
- Attachment 0003 A01 - CSO Mixer Q and A Template.xlsxBlank template for written questions with offeror, page, section, question and answer columns. The notice does not say it is required. Read.
- Attachment 0005 Vendor CSO Phase 1 Submission Document Amendment 0005 Rev 7.pdfAmendment 0005 dated 19 November 2026 setting the deadline, 240-day validity and drawing access rules. Read in full, and provide the CAGE code, email, signature, title and date it asks for. Read.
Not stated in what we read
- Estimated value or budget for the project.
- Contract length or period of performance. Phase 1 asks you to propose one.
- Current question deadline. The 31 August 2026 date in Rev 01 has passed.
- Facility plans (Attachments 0007 and 0008), average setpoints (Attachment 0010), the process flow diagram and Attachments A to C were not in the file list we received, so we could not review them. You must read them through SAM.gov access.
- Final number of mixers to quote. Two is the baseline, a third is optional, and the Q&A asks for a best-case plan.
- Whether 4% re-blend is a ceiling, and whether the 1,100-liter minimum or the 800 to 1,200 lb batch range sets mixer size.
Notice text
The purpose of this Commercial Solution Opportunity (CSO) is to seek out qualified vendors who have experience manufacturing an Automated Fluidized Bed Mixer Facility Modernization for end use at Pine Bluff Arsenal. This announcement is in support of market research performed by the Army Contract Command - Rock Island to determine interest and capability to provide the supply defined within this CSO. This CSO will utilize a solicitation process authorized by RFO DFARS 212.70.
Under this CSO, the DoW will be allowed to competitively procure innovative commercial items, technologies, and services. CSO procedures provide a streamlined acquisition process and simplified contract terms resulting in FAR-based contracts awarded under Part 12 Commercial Item Procedures. Both traditional and non-traditional defense contractors may be awarded contracts under this CSO. Under a CSO DoW contracting officers may competitively select quotes received in response to a general competitive solicitation, similar to a broad agency announcement, based on a review of quotes by scientific, technological, or other subject matter experts.
Please provide your Reponses to the following questions below through email to Ashley Testake, ashley.e.testrake.civ@mail.mil NLT COB 14 October 2026.
As published on SAM.gov.
Contacts
- Ashley Testrake, Ashley.e.testrake.civ@army.mil
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 20, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 1, 12:00 PM CT6 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 333248, all other industrial machinery manufacturing, soonest deadline first.
- Department of EnergyLaser metal wire 3D printer with training, Oak Ridge, TN
- Bureau of Engraving and PrintingNotice of Intent to Award Sole Source - Bep Spare Part PRM1769 - Blade, Dry, Super Orlof Intaglio III Press
- Bureau of Engraving and PrintingIntent to Award Sole Source-SPARE PARTS
- National Aeronautics and Space AdministrationSievmaster Rota 90-C cantilever centrifugal sifter
- Department of EnergyDual heat laminator with training, Oak Ridge, TN
- Department of the NavyResonant acoustic mixer upgrades for China Lake, CA
- US Coast GuardRed garnet abrasive media, Baltimore, MD
- Department of EnergyTECHNOLOGY/BUSINESS OPPORTUNITY Additive Manufacturing of Electrically Heatable Catalysts for Microwave-Driven Structured Reactors
Free · at most one email a morning
Get new notices from Department of the Army by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy