1. Opportunities
  2. Department of Energy
  3. RFP518395

Laser metal wire 3D printer with training, Oak Ridge, TN

Oak Ridge National Laboratory (ORNL) wants one Meltio M600 laser metal wire 3D printer, or a domestic equal, with listed accessories, a first-year software license, one-day installation and three-day training.

Official title: X209 Meltio M600 Laser Metal Wire 3D Printer FY27

Deadline
Nov 30, 12:00 PM ET
5 days left
Who can bid
Not stated
The notice names no set-aside
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Oak Ridge, TN
Buyer: Ornl UT-Battelle LLC-DOE Contractor

What they're buying

Offers are now due Monday, December 7, 2026, 4:00 PM EST, after Amendment 1.

Top catches

Deadline moved to December 7
“Extend due date through 07 December 2026, 4:00 PM EST” Amendment 1.pdf, page 1

The amendment moves the offer due date to Monday, December 7, 2026, 4:00 PM EST. SAM.gov still shows November 30 at noon, so plan to the amendment date and confirm it with the buyer.

Amendment acknowledgment required
“MAY RESULT IN REJECTION OF YOUR OFFER” Amendment 1.pdf, page 1

Sign the amendment acknowledgment and include it with your offer. The amendment says a missing acknowledgment by the deadline may get your offer rejected.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 8 of 8 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • One Meltio M600 laser metal wire 3D printer, 1 kW, with 9-laser print head, wire feeder, chiller, and print envelope of 300 x 400 x 600 mm.
  • Accessories on lines 2 to 12: hot wire, a second-wire option, clamping plate kit, shield gas nozzle, four drive wheel sets, carbon wire guides, protective glass, and wire nozzles (10 of 1.1 mm and 10 of 1.3 mm).
  • Meltio Horizon 1st year software license, two seats.
  • One-day installation and three-day training for up to 5 students per course, including travel and per diem.
  • Freight and fees/tariffs, each as a separate line item.
  • Final acceptance testing after installation at the Company site.

Who supplied it lately

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Deadline moved to December 7. The amendment moves the offer due date to Monday, December 7, 2026, 4:00 PM EST. SAM.gov still shows November 30 at noon, so plan to the amendment date and confirm it with the buyer.
  • Amendment acknowledgment required. Sign the amendment acknowledgment and include it with your offer. The amendment says a missing acknowledgment by the deadline may get your offer rejected.
  • Equal products need proof. The notice accepts a domestic equivalent to the Meltio M600. Name the make and model, attach full specifications, and list any differences, because the buyer decides whether your product equals the specified one.“Meltio M600 Laser Metal Wire 3D Printer or domestic equivalent” Notice text
  • Delivery address conflicts. The RFP names San Diego, CA as the shipping destination, but SAM.gov lists Oak Ridge, TN. Ask the buyer in writing where to deliver before you price freight. Under Attachment B, risk of loss stays with you until delivery.“Shipping Destination – San Diego, CA.” RFP518395.pdf, page 5
  • ORNL badges and advance notice. Anyone who delivers, installs or trains on site needs an ORNL badge or visitor pass. Visitor names must be sent at least 24 hours ahead on a workday, and passes are picked up at Building 5200 with photo ID.“Vendor personnel may come onto the ORNL site only if they have a current ORNL badge” RFP518395.pdf, page 8
  • Payment timing conflicts. The RFP ties payment to final acceptance after installation, at Net 15 for small businesses. Attachment B says net 30 from invoice or delivery. Ask which governs, and plan cash flow for the wait until testing is done.“Payment terms are Net 30 (Large Business) or Net 15 (Small Business) days upon final acceptance of the product/service.” RFP518395.pdf, page 8

Key terms

Who can bidOpen to any size business; not a small business set-asideRFP says no set-aside. Size standard is 750 employees under NAICS 333248.RFP518395.pdf, page 1
How they chooseLowest price technically acceptable (LPTA)Award goes to the lowest-priced offer that meets the Attachment A requirements.RFP518395.pdf, page 8
Questions dueFriday, November 20, 2026, 12:00 PM ESTClosed. Today is November 24, 2026.RFP518395.pdf
Contract typeFirm fixed price subcontractThe RFP anticipates a firm fixed price subcontract.RFP518395.pdf

How to respond

  1. Confirm the deadline: Monday, December 7, 2026, 4:00 PM EST, per Amendment 1. Do not rely on the November 30 time shown on SAM.gov.
  2. Complete Attachment A line by line: unit and extended prices, lead time, country of origin, and separate freight and fees or tariffs lines. If you offer an equal, name it and attach full specifications.
  3. Sign the Amendment 1 acknowledgment and the Attachment D representations and certifications, which are required because the offer exceeds $15,000. Include an Exceptions/Non-Compliance section, even if you take no exceptions.
  4. The amendment lists Rian Lewis at lewisgr@ornl.gov as the return contact, but the notice does not state how offers must be delivered, so confirm the method in writing. Use MS Excel, MS Word or PDF, on the Company forms where provided.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Delivery date or lead time. The lead time column in Attachment A is blank and no delivery schedule is stated.
  • Estimated value of the purchase.
  • Final delivery address: San Diego, CA or Oak Ridge, TN.
  • Installation date, site readiness, and who supplies the 200-240V three-phase power and floor space.
  • How offers must be delivered, such as email, portal or hard copy.
  • Whether the cybersecurity questionnaire must be returned with your offer.

Notice text

UT-Battelle LLC's Defense Manufacturing Program Office (DMPO) requires an Meltio M600 Laser Metal Wire 3D Printer or domestic equivalent per Attachment A - Meltio M600 Laser Metal Wire 3D Printer - Bill of Material and Pricing Worksheet.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 24, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of Energy by email

Each morning we'll send the new solicitations and sources-sought notices from Department of Energy, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy