Parking lot and road design at Fergus Falls, MN
The U.S. Fish and Wildlife Service wants an engineering firm to design parking lots, an overflow lot, and access and laydown areas at its Fergus Falls Wildlife Management District in Minnesota.
Official title: C--MN FERGUS FALLS WMD PRKING REHAB
- Deadline
- Today, 3:00 PM ET
- Friday, Nov 20
- Who can bid
- Small businesses
- Size standard for NAICS 541330: $25.5 million in average annual receipts; exceptions apply · Who qualifies
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: Fws Contracting Activity
What they're buying
It is a 100% small business set-aside for a firm-fixed-price design contract, with performance dated 12/01/2026 to 03/31/2027 under Amendment 0001.
Top catches
“Bid due date through November 20, 2026” Sol_140FF027R0006_Amd_0001.pdf, page 2
Amendment 0001 moved the bid due date to November 20, 2026, but gave no time. The 3:00 PM ET time comes from the original notice, so confirm it and send your offer early.
“Reference 'Phase 2-3 SOW_REV SEPT2026.pdf' specially Parts V.A.4.” Amd2_RFI_Q_A_0002.docx
The Q&A points to a Phase 2-3 SOW for surveys, geotechnical work and stormwater. We could not review that file, and it is not in the attachment list. You must read it on the file share link before you price the job.
Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 4 of 4 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Design the Headquarters Parking lot (Rte 9183) and the Headquarters Overflow Parking Lot (Rte 80).
- Design the Maintenance Building Access Roadway and the Maintenance Building Laydown Area.
- Design the Maintenance laydown Area/Gravel Access road. The item title is cut off in the notice.
- Surveys: the Q&A says to use the Phase 2-3 SOW Part V.A.3. Whether new topographic and boundary surveys are needed is not clear from the text.
- Geotechnical field work if the SOW requires it. The Q&A lists soil borings, pavement cores, percolation tests and subgrade evaluations as examples. You must arrange and price these.
- Stormwater retention or detention and drainage modeling if permitting agencies or the designer require it.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Deadline is tomorrow and was moved. Amendment 0001 moved the bid due date to November 20, 2026, but gave no time. The 3:00 PM ET time comes from the original notice, so confirm it and send your offer early.
- Key scope is in a file not attached. The Q&A points to a Phase 2-3 SOW for surveys, geotechnical work and stormwater. We could not review that file, and it is not in the attachment list. You must read it on the file share link before you price the job.
- You carry geotechnical and stormwater work. The Government will not hire a separate firm for geotechnical investigations. If the design needs stormwater retention or detention, the designer must do it under this contract. Include field testing and drainage work in your price.“The Government does not plan to directly contract geotechnical investigations outside this Contract.” Amd2_RFI_Q_A_0002.docx
- Amendments must be acknowledged. Acknowledge Amendments 0001 and 0002 in your offer before the deadline. The amendment says a missing acknowledgment may result in rejection of your offer. List both amendment numbers and dates on the offer page.“MAY RESULT IN REJECTION OF YOUR OFFER” Sol_140FF027R0006_Amd_0002.pdf, page 1
- Five-page write-up decides the award. Award rests on a technical write-up of 5 pages or less, plus three similar projects from the last five years. Price is not an evaluation factor for selection. Keep the write-up tight and show clear past work.“limited to 5 pages showing understanding of requirements and methods proposed, preliminary schedule of events showing how the project will Continued...” Sol_140FF027R0006.pdf, page 3
- Performance dates conflict with 120 days. Amendment 0001 sets 12/01/2026 to 03/31/2027 for each item. Block 11 of the solicitation says 120 calendar days after award, and the delivery date of 03/19/2027 is not changed in the text shown. The question period closed November 13, so state your schedule assumption in your write-up.“Period of Performance: 12/01/2026 to” Sol_140FF027R0006_Amd_0001.pdf, page 2
Key terms
| Who can bid | Small businesses only (100% small business set-aside)You must be an active vendor in SAM.gov by the time an award decision is needed.Sol_140FF027R0006.pdf, page 3 |
|---|---|
| Contract period | 12/01/2026 to 03/31/2027 (per Amendment 0001)The original notice said 11/16/2026 to 03/19/2027. Block 11 also says 120 calendar days after notice to proceed.Sol_140FF027R0006_Amd_0001.pdf, page 2 |
| How they choose | Demonstrated competence and qualifications; price not an evaluation factor for selectionThe basis is a technical write-up of 5 pages or less and three similar projects from the last five years.Sol_140FF027R0006.pdf, page 3 |
| How to submit | By email to christine_beauregard@ios.doi.govInclude unit and total price on the Bid Schedule, your SAM.gov UEI, and a contact phone and email.Sol_140FF027R0006.pdf, page 4 |
| Questions due | Closed (November 13, 2026)Amendment 0001 extended the question period to November 13, 2026.Sol_140FF027R0006_Amd_0001.pdf, page 2 |
| Contract type | Firm-fixed-price architect-engineer design contractThe notice says the work is architect-engineer services under FAR Subpart 36.6.Sol_140FF027R0006.pdf, page 3 |
How to respond
- Confirm your SAM.gov registration is active and note your UEI. The notice says you must be registered by the time an award decision is needed.
- Download Amendments 0001 and 0002, the Phase 2-3 SOW and any Bid Schedule from https://fws-fileshare.box.com/s/9gfjco8ckiegswvx84dwpcw786ifg9v4. The Bid Schedule is referenced but not attached.
- Write a technical write-up of no more than 5 pages. It must cover your understanding, methods, a preliminary schedule meeting the performance period, and three projects of same or similar work from the previous five years.
- Email the write-up, the Bid Schedule showing unit and total price, your UEI, and a contact phone and email to christine_beauregard@ios.doi.gov by Friday, November 20, 2026, 3:00 PM ET. File format and size limits: Not stated.
- Complete and sign the offer page of Sol_140FF027R0006.pdf and list Amendments 0001 and 0002 with their dates. Signature and attachment rules beyond this: Not stated.
Attached files
- Sol_140FF027R0006_Amd_0002.pdfThis amendment issues the questions and answers and keeps other terms unchanged. You must read it and acknowledge it. Read.
- Amd2_RFI_Q_A_0002.docxThis document has questions and answers on surveys, geotechnical work and stormwater. You must read it, since the answers point to a SOW that was not attached. Read.
- Sol_140FF027R0006_Amd_0001.pdfThis amendment extends the question period to November 13, 2026, moves the bid due date to November 20, 2026, and changes the performance periods. You must read it and acknowledge it. Read.
- Sol_140FF027R0006.pdfThis is the main solicitation with the offer page, clauses and instructions. You must complete and sign the offer page, including your price and amendment acknowledgments, and read the clauses. Read.
Not stated in what we read
- Estimated value or budget for the contract.
- Content of the Phase 2-3 SOW, which was referenced but not attached. Whether new topographic or boundary surveys are required.
- Small business size standard for NAICS 541330. The size standard blank in clause 52.219-1 is not filled in.
- Whether performance and payment bonds are required. Block 12a shows both YES and NO with no selection.
- Whether an offer guarantee is required. Block 13b shows both is and is not with no selection.
- Whether the delivery date of 03/19/2027 still applies after Amendment 0001.
Notice text
Amendment two - Q&A
As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.
Contacts
- Beauregard, Christine, Christine_Beauregard@fws.gov, 4132538232
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 17, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Similar open notices
Open now under NAICS 541330, engineering services, soonest deadline first.
- Federal Highway AdministrationRoad design services for federal lands in 14 states
- US Secret ServiceUSSS Construction Management & Engineering Services
- Department of the NavyNotice of Intent to Sole Source Self Defense Test Ship Engineering and Technical Support Services
- Department of Veterans AffairsFY24 A/E IDIQ Single Pool NCO 23 36C263-22-AP-4822
- Departmental OfficesC Geotechnical Architecture and Engineer Services in
- Department of the Air ForceCathodic Protection Survey/Inventory/Assessment Services
- US Coast GuardU.S. Coast Guard H-60T Maintainer Training Unit and Hot Mock Up Training Devices
- National Aeronautics and Space AdministrationMass production process development at NASA Ames, CA
Free · at most one email a morning
Get new notices from Departmental Offices by email
Each morning we'll send the new solicitations and sources-sought notices from Departmental Offices, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy