- Opportunities
- National Aeronautics and Space Administration
- 80NSSC27948890Q
Mass production process development at NASA Ames, CA
NASA Ames Research Center wants a small business to develop and prove a repeatable, high-throughput production process, delivering parts and data for an industrial process study.
Official title: Development of a mass production process
- Deadline
- Nov 23, 2:00 PM CT
- 3 days left
- Who can bid
- Small businesses
- Size standard for NAICS 541330: $25.5 million in average annual receipts; exceptions apply · Who qualifies
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: NASA Shared Services Center
What they're buying
Quotes are due by email on Monday, November 23, 2026, at 2:00 p.m. CT, and the lowest price among technically acceptable quotes wins.
Top catches
“no later than 11/19/2026 by 2:00 p.m. CT” SATPC0043200 Tab 10 3 RFQ Open Market.pdf, page 3
The notice text says questions are due by day 3 of posting, but the RFQ sets 2:00 p.m. CT today, 19 November. If you have questions, email Monica Wilson before that time and ask which deadline applies.
“SAM will not allow me to attach the spt file here. It is available upon request.” Notice text
The main statement of work is a scanned image that could not be read here, and the notice says the spt file is available only on request. Ask the contracting officer for it and price against it, since it likely sets the detailed requirements. Likely, not stated outright.
Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 2 of 3 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Develop a repeatable, high-throughput production process and show it is qualified, with the parts as evidence.
- Complete the phases: design, tooling, qualification lot and scalability report.
- Deliver a complete set of data and components for integration, targeted for June 2027 with earlier preferred.
- Meet the key characteristics: eight holes on center with the part diagonals, two per corner, with stated tolerance and repeatability.
- Qualify the measurement system with a GR&R study (ANOVA, AIAG MSA reference). Total GR&R should not exceed 10% of tolerance, and values up to 30% may be accepted with documented rationale.
- Price tooling for both final destinations as options. Subcontracting press line and tooling fabrication is acceptable in principle if the partner has relevant expertise and contract rules are met.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Questions due today. The notice text says questions are due by day 3 of posting, but the RFQ sets 2:00 p.m. CT today, 19 November. If you have questions, email Monica Wilson before that time and ask which deadline applies.
- Statement of work not readable. The main statement of work is a scanned image that could not be read here, and the notice says the spt file is available only on request. Ask the contracting officer for it and price against it, since it likely sets the detailed requirements.
- Any missed requirement ends the bid. Price only counts after a quote is found technically acceptable. A quote that does not show it meets every requirement is removed, even if it is the cheapest, so state how you meet each requirement, including the measurement study.“does not demonstrate that all of the requirements listed in this solicitation can be met in a satisfactory manner” SATPC0043200 Tab 10 3 RFQ Open Market.pdf, page 11
- Price line left blank. The firm-fixed-price amount is still a template placeholder. Ask the contracting officer for the expected total and the required price format before you price the work.“The total firm-fixed-price of this contract is $[Insert the appropriate amount].” SATPC0043200 Tab 10 3 RFQ Open Market.pdf, page 7
- Two contacts with phone numbers. Your quote must name two points of contact, each with a name, phone number and email. The notice text asks only for a POC name and email, so include phone numbers too.“Submitted Quotes shall list two points of contacts including name, phone number, and email address.” SATPC0043200 Tab 10 3 RFQ Open Market.pdf, page 3
- Foreign parts need advance notice. If you plan to import foreign parts or materials over $20,000 for this order, you must notify the contracting officer first. Check whether any of your parts come from abroad before you price.“The Contractor shall furnish the notice to the Contracting Officer at least 20 calendar days before the importation.” SATPC0043200 Tab 10 3 RFQ Open Market.pdf, page 8
Key terms
| Who can bid | Small businesses only (total set-aside)You must be registered at SAM.gov to be considered for award.SATPC0043200 Tab 10 3 RFQ Open Market.pdf, page 3 |
|---|---|
| How they choose | Lowest price technically acceptable (LPTA)Price decides only among quotes that meet all requirements.SATPC0043200 Tab 10 3 RFQ Open Market.pdf, page 11 |
| How to submit | Email to Monica Wilson at monica.d.wilson@nasa.govPut the RFQ notice ID in the subject line of your email.SATPC0043200 Tab 10 3 RFQ Open Market.pdf, page 3 |
| Questions due | Thursday, November 19, 2026, 2:00 p.m. CT (today)Questions must be sent by email. Phone questions are not accepted. The notice text says day 3 of posting.SATPC0043200 Tab 10 3 RFQ Open Market.pdf, page 3 |
| Contract type | Firm-fixed price, commercial itemThe price amount is still a blank template placeholder.SATPC0043200 Tab 10 3 RFQ Open Market.pdf, page 7 |
How to respond
- Email questions to Monica Wilson at monica.d.wilson@nasa.gov today before 2:00 p.m. CT. Phone questions are not accepted.
- Email your quote to monica.d.wilson@nasa.gov by Monday, November 23, 2026, 2:00 p.m. CT, with the RFQ notice ID in the subject line. The notice does not say which number that is; the SAM.gov notice ID is 27372def416f4342be8a9e93d5e487bd.
- Include your CAGE code or UEI, FOB destination terms, lead time for delivery, and two points of contact with name, phone and email. The government will not pay by credit card.
- Give a price broken down by SOW phase, with tooling for both destinations priced as options. Quotes stay valid 30 days unless the quote states otherwise.
Attached files
- SATPC0043200 Tab 10 1 SOW.pdf Scanned image, not read.
- SATPC0043200 Tab 10 6 Questions.pdfGovernment answers to questions that add the delivery address, schedule, price format and tolerance terms. You must read it and reflect it in your quote. Read.
- SATPC0043200 Tab 10 3 RFQ Open Market.pdfThe request for quotation with instructions, evaluation rules and clauses. You must read it in full and complete the place-of-manufacture box in your quote. Read.
Not stated in what we read
- Full statement of work: the file was a scanned image and could not be read here.
- Total estimated value or price: the firm-fixed-price amount is a blank placeholder.
- Contract length and delivery date: only a target of June 2027 for data and components is given.
- Quantity of parts and production rate: not stated.
- Which Buy American rules apply: clause 52.223-23 is listed twice with different titles.
- Whether the spt file mentioned in the notice is the same as the scanned statement of work.
Notice text
SAM will not allow me to attach the spt file here. It is available upon request. PLEASE INCLUDE THE FOLLOWING IN YOUR BID: • CAGE/UEI CODE • FOB DESTINATION • LEAD TIME FOR DELIVERY • POC NAME & EMAIL Questions must be sent no later than day 3 of the posting. ** SEE THE ATTACHMENTS ** We will not be paying with a credit card VENDORS MUST REFERENCE THE RFQ NOTICE ID NUMBER IN THE SUBJECT LINE OF YOUR EMAIL WHEN SUBMITTING A QUOTE
As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.
Contacts
- Monica Wilson, monica.d.wilson@nasa.gov
- Will Garrett, will.c.garrett@nasa.gov
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 19, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Similar open notices
Open now under NAICS 541330, engineering services, soonest deadline first.
- Departmental OfficesParking lot and road design at Fergus Falls, MN
- US Secret ServiceUSSS Construction Management & Engineering Services
- Federal Highway AdministrationRoad design services for federal lands in 14 states
- Department of the NavyNotice of Intent to Sole Source Self Defense Test Ship Engineering and Technical Support Services
- Department of Veterans AffairsFY24 A/E IDIQ Single Pool NCO 23 36C263-22-AP-4822
- Departmental OfficesC Geotechnical Architecture and Engineer Services in
- Department of the Air ForceCathodic Protection Survey/Inventory/Assessment Services
- US Coast GuardU.S. Coast Guard H-60T Maintainer Training Unit and Hot Mock Up Training Devices
Free · at most one email a morning
Get new notices from National Aeronautics and Space Administration by email
Each morning we'll send the new solicitations and sources-sought notices from National Aeronautics and Space Administration, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy