- Opportunities
- Department of Veterans Affairs
- 36C78626R0058
Cemetery building and site repairs, Nicholasville, KY
Construction work to correct FCA deficiencies at Camp Nelson National Cemetery near Nicholasville, Kentucky, covering building work, paving, utilities, and planting, with three alternates.
Official title: CAMP NELSON NATIONAL CEMETERY, KY 833CM3030 – CORRECT FCA DEFICIENCIES
- Deadline
- Dec 21, 1:00 PM ET
- 25 days left
- Who can bid
- SDVOSB firms
- Service-disabled veteran-owned small businesses certified by SBA only · Who qualifies
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Nicholasville, KY
- Buyer: National Cemetery Admin (36C786)
What they're buying
Only service-disabled veteran-owned small businesses may bid, and offers are due Monday, December 21, 2026, at 1:00 PM EST; the contract length is not stated.
Top catches
“to December 21, 2026, at 1:00 PM EST” Notice text
Amendment 0005 sets the deadline at 1:00 PM EST on Monday, December 21, 2026, and replaces earlier dates. Confirm that time on SAM.gov, because an earlier amendment labels its time EDT and Amendment 0005 itself was not in the files we reviewed.
“NOTICE OF SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE IN ACCORDANCE WITH PUBLIC LAW 109-461” Notice text
Only service-disabled veteran-owned small businesses can bid. The provided text does not say how you prove that status, so confirm your status and the $45,000,000 size standard before you plan to bid.
Read by AI (Claude Haiku) on Nov 26, 2026 from the notice and 17 of 69 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Correct the FCA deficiencies listed on drawing GI-003 (FCA list) and in the specifications.
- Demolition and new work on the public restroom and wash bay building, equipment storage garage, historic brick stable, and maintenance buildings, per the drawing list.
- Base Item I plus Alternate 1 (historic cemetery wall restoration), Alternate 2 (new material spoils storage structure), and Alternate 3 (Section CC top soil).
- Paving, storm sewer, utility, irrigation, and planting work, including the plant and turfgrass establishment period.
- Fuel storage tank and fuel dispensing controller: the specifications name a ConVault-type tank with UL 752 Levels 5, 6, and 8 ballistic ratings and a SafeSite controller; any equal needs approval before bid opening.
- Electrical, fire alarm, and communications work, including the FireWarden-100-2 addressable fire control panel named in the Q and A amendment.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Deadline has moved three times. Amendment 0005 sets the deadline at 1:00 PM EST on Monday, December 21, 2026, and replaces earlier dates. Confirm that time on SAM.gov, because an earlier amendment labels its time EDT and Amendment 0005 itself was not in the files we reviewed.
- Veteran-owned set-aside: check eligibility. Only service-disabled veteran-owned small businesses can bid. The provided text does not say how you prove that status, so confirm your status and the $45,000,000 size standard before you plan to bid.
- Limit on work given to subcontractors. A set-aside likely limits how much of the work you may subcontract. The percentage is not in the files we reviewed, so read RFP pages 45 and 46 before you decide who will do the work.“The Limitation of Sub contraction was enbibed in RFP page 45 and 46.” S02 Amendment 36C78626R0058 0001.pdf, page 3
- $1,375 per day if work runs late. If the work runs past the completion date, you owe $1,375 for each calendar day. Build that daily cost into your schedule and price, since the completion time is not stated.“The Contractor shall pay liquidated damages to the Government in the amount of $1,375.00 for each calendar day of delay until the work is completed or accepted.” S02 Liquidated Damages 833CM3030_CNNC FCA Corrections CONS.pdf, page 1
- Wage decision not in the files. The poster says workers must be paid the wage rate in the Davis-Bacon wage decision, but no wage decision is in the attachment list. Get that decision from the notice before you price any labor.“You must be paid not less than the wage rate listed in the Davis-Bacon Wage Decision posted with this Notice for the work you perform.” S02_Attachment - Davis-Bacon Act Poster.pdf, page 1
- Site visit date has passed. The organized site visit was set for September 25, 2026, which is already past. Bidders may visit only by appointment with the Cemetery Director, so contact that office if you need to see the site.“There will be an organized site visit conducted on September 25, 2026, at 10:00 EST.” Notice text
Key terms
| Who can bid | Service-disabled veteran-owned small businesses onlySet-aside under Public Law 109-461; size standard stated as $45,000,000.Notice text |
|---|---|
| Estimated value | $10,000,000 to $20,000,000 (construction magnitude estimate)Stated as the magnitude of construction, not a contract award amount.Notice text |
| Contract type | Fixed-price construction (likely)The specification refers to payment under fixed-price construction contracts.S02 833CM3030_CNNC FCA Corrections_CONS_BD SPECIFICATIONS.pdf, page 29 |
| Site visit | September 25, 2026, 10:00 EST (date has passed)Attendees were to meet at the cemetery administration building. Other bidder visits require an appointment with the Cemetery Director.Notice text |
How to respond
- Submission address or portal: Not stated in the provided text. Check the solicitation on SAM.gov before you prepare anything.
- Fill in the Price Proposal Breakdown by division, then add overhead and profit to reach the total. Price Item I and Alternates 1 to 3.
- Acknowledge Amendments 0001 through 0005 as the amendment form requires, either on your offer or in a separate letter.
- If you plan to use subcontractors, complete Standard Form 1413 for each subcontract and stay within the subcontracting limit.
- Have the complete offer received by Monday, December 21, 2026, 1:00 PM EST.
Attached files
From SAM.gov. Download links open the original files.
- P07 Jessamine Camp Nelson Building.pdf Not read: over our length limit.
- S02_Price Proposal Breakdown.docxBlank price form by construction division with overhead and profit lines; you must fill it in. Read.
- Amendment 4-833CM3030 - CD1 - Historic Hardware.pdf Older version, not read.
- S02_Attachment - Past Performance Questionnaire.docx Not read: over our length limit.
- Amendment 4-833CM3030 - BID - HA-001 from 20260422 - 833CM3030 - BID - SET.pdf Not read: over our length limit.
- P07 Jessamine Camp Nelson Highway.pdf Not read: over our length limit.
- Amendment 4-833CM3030 - BID - CU-105 from 20260107 - 833CM3030 - BID - SET.pdf Not read: over our length limit.
- S06_Amendment 0005 36C78626R0058_11.25.2026.pdf Not read: over our length limit.
- Amendment 4-833CM3030 - BID - 23 11 13 Fuel Storage Tanks.pdf Not read: over our length limit.
- Amendment 4-833CM3030 - BID - 037 - CU-105 UTILITY PLAN (R2).pdf Not read: over our length limit.
- Amendment 4-833CM3030 - BID - 26 29 23 Engine Control and Monitoring.pdfSpecification section for a fuel dispensing controller that names a SafeSite product; read it to price the controller. Read.
- S02_Attachment - DOL Payroll Form.pdf Not read: over our length limit.
- Amendment 4-833CM3030 - BID - 028 - CP-105 PAVING PLAN (R2).pdf Not read: over our length limit.
- Amendment 4-833CM3030 - BID - SN-104 105 and X-series from 20260107 - 833CM3030 - BID - SET.pdf Not read: over our length limit.
- S02 833CM3030_CNNC FCA Corrections_CONS_BD SPECIFICATIONS.pdfPartial copy of the construction specifications (front matter, general requirements, planting, and storm sewer); read it, nothing to sign. Read in part (pages 1–41 and 1088–1112 of 1112).
- Amendment 4-833CM3030 - BID - Historic Pages from 20260422 - 833CM3030 - BID - SET A-004 005 132 133 154 155.pdf Not read: over our length limit.
- Amendment 4-ConVault Specification with UL 752 Level 8.pdfProduct specification for a ballistic-rated aboveground fuel tank with a 30-year warranty; read it to price any tank you offer. Read.
- S02 08 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf Not read: over our length limit.
- Amendment 4-Convault Storage tank 500 GL-telford.pdf Scanned image, not read.
- Amendment 4-Convault Brochure 2019 (003).pdf Not read: over our length limit.
- S02 10 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf Not read: over our length limit.
- Amendment 4-833CM3030 - BID - 020 - CG-201 POND AND CRYPT FIELD SECTIONS (R1).pdf Not read: over our length limit.
- S02 04 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1 (1).pdf Not read: over our length limit.
- S02 amendment 2.pdfGovernment answers to questions, including the fire alarm panel model and the site visit registration; read only, nothing to sign. Read.
- Amendment 4-AE-113 from 20260422 - 833CM3030 - BID - SET.pdfDrawing sheet with elevations and sections for the public restroom and wash bay building; read for pricing, nothing to sign. Read.
- Amendment 4-AE-113 833CM3030 - BID - SET.pdf Older version, not read.
- S02_Attachment - Standard Form 1413.pdfBlank subcontract labor standards statement; complete and have signed only if you use subcontractors. Read.
- S02 36C78626R0058 Amendment 0004.docx Not read: over our length limit.
- Amendment 4-833CM3030 - CD1 - Historic Preservation.pdf Not read: over our length limit.
- Amendment 4-SED FCA - 04212022_Camp Nelson.pdf Not read: over our length limit.
- Amendment 4-833CM3030 - BID - AE-110 from 20260422 - 833CM3030 - BID - SET.pdf Not read: over our length limit.
- S02 02 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf Not read: over our length limit.
- Amendment 4-833CM3030 - BID - 328400 Plant Irrigation_10-31-24.pdf Not read: over our length limit.
- Amendment 4- 36C78626R0058 FuelForce 814 Advanced Fuel Controller Brochure.pdf Not read: over our length limit.
- Amendment 4-240524-Camp Nelson National Cemetery - KY- SUE Field Report Deliverable.pdf Scanned image, not read.
- Amendment 4-833CM3030 - BID - AE-150 from 20260422 - 833CM3030 - BID - SET.pdf Not read: over our length limit.
- Amendment 4-833CM3030 - BID - 07 42 43 Plastic Panel.pdfSpecification section for corrugated polycarbonate wall panels; read it to price the panels. Read.
- Amendment 4-833CM3030 - BID- EQUIPMENT STORAGE GARAGE-AE-141.pdfDrawing sheet with elevations for the equipment storage garage; read for pricing, nothing to sign. Read.
- Amendment 4-GI-104 from 20260107 - 833CM3030 - BID - SET.pdf Not read: over our length limit.
- Amendment 4-833CM3030 - BID - 231123 NatGas.pdf Not read: over our length limit.
- Amendment 4- 833CM3030 - BID - 072727 - BARRIER VAPOR.pdf Not read: over our length limit.
- S02 07 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf Not read: over our length limit.
- S02 03 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf Not read: over our length limit.
- Amendment 4-3189 ECS Geotechnical Engineering Report - Expansion Area.pdf Not read: over our length limit.
- Amendment 4-833CM3030 - BID - 329000 Planting.pdf Not read: over our length limit.
- Amendment 4-3189 ECS Geotechnical Engineering Report - Camp Nelson Cemetery.pdf Not read: over our length limit.
- S02 Amendement 36C78626R0058 0002.pdf Not read: over our length limit.
- Amendment 4-833CM3030 - BID - 050 - S-101 STRUCTURAL PLAN (R2).pdfStructural plan with floor coating and slab requirements; read for pricing, nothing to sign. Read.
- S02 Fire Alarm Panel.pdf Scanned image, not read.
- S02 06 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf Not read: over our length limit.
- P07 Jessamine Camp Nelson Heavy.pdf Not read: over our length limit.
- Amendment 4-Lightning Protection Asmnt Report_Camps Nelson Cemetery.pdf Not read: over our length limit.
- Amendment 4-Dispensing System Controller-SafeSite DSC with specs.pdfManufacturer sheet and specification for the fuel dispensing controller; read to price the controller. Read.
- S02 Liquidated Damages 833CM3030_CNNC FCA Corrections CONS.pdfWorksheet setting liquidated damages at $1,375 per calendar day; read it, nothing to sign. Read.
- S02_Attachment - Davis-Bacon Act Poster.pdfFederal worker rights poster for Davis-Bacon wages; read it, nothing to sign. Read.
- Amendment 4-833CM3030 - BID - CD-102 from 20260107 - 833CM3030 - BID - SET.pdfSite demolition plan showing septic, fuel tank, and pavement removal; read for pricing, nothing to sign. Read.
- Amendment 4-AD-150 from 20260107 - 833CM3030 - BID - SET.pdf Older version, not read.
- S02 Amendment 36C78626R0058 0001.pdfOfficial amendment 0001 with answers to questions, including the subcontracting limit reference; read it, and acknowledge it as the form requires. Read.
- Amendment 4-833CM3030 - BID - 33 56 10 Temporary Fuel Storage Tanks.pdf Not read: over our length limit.
- S09 09 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf Not read: over our length limit.
- S06_36C78626R0058 Amend. 0003.pdfOfficial amendment 0003 extending the deadline to November 13, 2026; superseded by later amendments, and acknowledge it as the form requires. Read.
- Amendment 4-833CM3030 - BID - 052 - S-202 MATERIALS STORAGE BLDG. FRAMING (R2).pdf Not read: over our length limit.
- S02 12 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_addendum01.pdf Not read: over our length limit.
- S02 11 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 2_05212026 1.pdf Not read: over our length limit.
- S02 Camp Nelson Sol 36C78626R0058 draft 9-14-2026.pdf Not read: over our length limit.
- Amendment 4-3189 ECS Geotechnical Engineering Report - Maintenance Area.pdf Older version, not read.
- S02 05 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf Not read: over our length limit.
- S02 01 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf Not read: over our length limit.
- S02_Attachment - Project Sample Template.docxBlank past-project form for the experience factor; fill in one for each project you cite. Read.
Not stated in what we read
- Contract completion date or length of performance.
- How and where to submit offers, and whether delivery is by portal, email, or mail.
- Award basis and evaluation factors, which are in Section M of the solicitation.
- The percentage limit on subcontracting, which appears in RFP pages 45 and 46.
- Whether Alternates 1 to 3 will be awarded and how they will be compared.
- Davis-Bacon wage rates for this project.
Notice text
11/25/2026 - Amendment 0005 published extending the date and time for receipt of offers is from December 7, 2026, at 9:00 AM Eastern Standard Time (EST) to December 21, 2026, at 1:00 PM EST. 11/10/2026 - Amendment 0004 published to provide RFI answers, provide amended Specifications and Drawings, and extend the date and time for receipt of offers is from November 13, 2026, at 9:00 AM Eastern Standard Time (EST) to December 7, 2026, at 9:00 AM EST. 10/08/2026 - Amendment 0003 published extending the date and time for receipt of offers is from October 15, 2026, at 10:00 AM Eastern Standard Time (EST) to November 13, 2026, at 9:00 AM EST. 09/22/2026 - Amendment 0002 published to provide answers to RFI questions.
09/17/2026 - Amendment 0001 published to provide answers to RFI questions. Project Title: CAMP NELSON NATIONAL CEMETERY, KY Project Location: Camp Nelson National Cemetery, 6980 Danville Road, Nicholasville, Kentucky 40356. NAICS code 237990 is applicable for this procurement with the small business size standard of $45,000,000. The magnitud of construction for this project is estimated between $10,000,000.00 and $20,000,000.00. NOTICE OF SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE IN ACCORDANCE WITH PUBLIC LAW 109-461 Contractor is to provide all construction services necessary to complete this project in accordance with the attached statement of work, construction drawings, construction specifications, and all other applicable supporting documents.
There will be an organized site visit conducted on September 25, 2026, at 10:00 EST. Attendees will meet at the Camp Nelson National Cemetery Administration Building located at 6980 Danville Road, Nicholasville, KY 40356
As published on SAM.gov.
Contacts
- Clarelle Sylvain, clarelle.sylvain@va.gov, 3524679329
- Brian Ballweg, Brian.ballweg@va.gov, 202-632-5407
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 26, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 21, 1:00 PM ET25 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 237990, other heavy and civil engineering construction, soonest deadline first.
- Department of the ArmyNew baseball stadium at USAF Academy, Colorado Springs, CO
- Department of the ArmyLock and dam rehabilitation, Chicago, Illinois
- Department of the ArmyDredge containment repairs, Savannah and Brunswick, GA
- Departmental OfficesWater recirculation pipeline and pump, Pixley refuge, CA
- Department of the ArmyMaintenance dredging task orders, South Atlantic region
- Department of Veterans AffairsPhase 1 cemetery construction, Albuquerque, NM
- Department of the ArmyCutterhead dredging, Mississippi River Southwest Pass, LA
- Department of the ArmyEast Boat Basin bulkhead replacement, Sandwich, MA
Free · at most one email a morning
Get new notices from Department of Veterans Affairs by email
Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy