- Opportunities
- Department of Energy
- RFP-376508-CD
Central Utility Building addition and upgrades, Batavia, IL
Build a new addition to the Central Utility Building at Fermilab in Batavia, Illinois, and renovate the existing building.
Official title: Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
- Deadline
- Dec 17, 4:00 PM CT
- 22 days left
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Batavia, IL
- Buyer: Fermilab - DOE Contractor
What they're buying
The work includes demolition, new foundations, structure and roof, electrical and fire systems, and chiller installation, with construction planned from January 2028 into 2029.
Top catches
“4:00pm CT on December 17, 2026” Amend 04 to RFP 376508-CD.pdf, page 1
Amendment 4 sets the due date at 4:00 PM Central on December 17, 2026. The RFP and price form still show November 17, 2026, which has already passed, so confirm the date with the procurement specialist.
“The Subcontractor shall complete the CUB Addition and Upgrades by October 1, 2029.” Exhibit A - Scope of Work UIP SP-1 CUB.pdf, page 3
The statement of work requires completion by October 1, 2029, while Milestone 5 says September 28, 2029 and the RFP gives an anticipated end of January 1, 2030. Ask which date governs before you build your schedule and price the extended general conditions.
Read by AI (Claude Haiku) on Nov 20, 2026 from the notice and 9 of 29 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Demolish existing piping, equipment, conduit, ductwork and other items shown on the drawings.
- Install foundations, structure and facade for the new addition, and renovate the existing shell and roof under the cooling towers.
- Install chillers, medium-voltage switchgear and transformers, and low-voltage switchgear that Fermilab furnishes, delivered May 2028.
- Keep existing chilled water, heating hot water, fire protection and controls running, with one outage of no more than 7 days.
- Install new fire protection, fire alarm, low-voltage and medium-voltage power, and civil utilities with pavement removal.
- Price the 19 lump-sum bid items and the six bid alternates on Exhibit K.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Deadline conflicts across documents. Amendment 4 sets the due date at 4:00 PM Central on December 17, 2026. The RFP and price form still show November 17, 2026, which has already passed, so confirm the date with the procurement specialist.
- Completion date conflicts. The statement of work requires completion by October 1, 2029, while Milestone 5 says September 28, 2029 and the RFP gives an anticipated end of January 1, 2030. Ask which date governs before you build your schedule and price the extended general conditions.
- Financial tests can disqualify you. Your most recent audited current ratio must be at least 1.20. A ratio from 1.10 to 1.19 triggers a CFO review, and below 1.10 or a bonding letter that misses the $100 million aggregate is an automatic fail, so check these numbers first.“of 1.20 or greater in the most recent audited fiscal year.” 1.0 RFP 376508-CD Instructions to Offerors.pdf, page 9
- Safety rating is pass or fail. An EMR above 1.25 in any single year of the last three is an automatic fail, and injury rates must be at or below 85% of the BLS averages. The RFP ties that test to NAICS 236220 while this notice uses 236210, so ask which applies.“Any single fiscal year within the three-year window exceeding 1.25” 1.0 RFP 376508-CD Instructions to Offerors.pdf, page 11
- Past work must meet size thresholds. You need at least three building projects, one of $50 million or more, with every other project at $35 million or more. If your largest project is under $50 million, you must also submit a Scalability and Resource Plan.“each additional project must have a minimum contract value of thirty-five million dollars ($35,000,000.00)” 1.0 RFP 376508-CD Instructions to Offerors.pdf, page 8
- Davis-Bacon wages and weekly payroll. Davis-Bacon wage rules apply, and the listed rates are minimums you must pay. Read Exhibit Q before pricing labor, since we could not review it, and plan for weekly certified payrolls in LCPTracker from every subcontractor.“The awarded Subcontract is subject to the wage and labor standards under the Davis-Bacon Act” 1.0 RFP 376508-CD Instructions to Offerors.pdf, page 13
Key terms
| Who can bid | Open to all firms; no set-asideSize standard is $45.0 million for NAICS 236210. Financial, safety and past-work tests apply.SAM.gov record |
|---|---|
| Contract period | Work may begin January 3, 2028; finish by September 28, 2029Dates may change for the Lab. Exhibit A gives October 1, 2029 as the completion date.Notice text |
| How they choose | Best value tradeoff; lowest price may not winTechnical proposal is 70 points and business and price is 30 points. Cost is scored against the lowest bid.1.0 RFP 376508-CD Instructions to Offerors.pdf, page 5 |
| How to submit | Email to cdaley@fnal.gov by the due dateSend Part I technical and Part II business and price as separate files. Do not bind them together.Exhibit K- Price Proposal Form.pdf, page 1 |
| Questions due | Tuesday, December 1, 2026; time not statedExtended by Amendment 3. The original date was 5:00 PM Central on November 3, 2026.Notice text |
| Contract type | Firm fixed price subcontract, lump sumExhibit K has 19 lump-sum bid items plus six bid alternates, each marked add or deduct.1.0 RFP 376508-CD Instructions to Offerors.pdf, page 8 |
| Site visit | Wednesday, December 2 and Thursday, December 3, 2026, 9:00 AM CentralUp to 10 visitors per visit, first come first served. Closed-toed safety shoes required. Mandatory attendance not stated.Amend 04 to RFP 376508-CD.pdf, page 1 |
How to respond
- Sign Amendment 04 and return it with your proposal, or email your acknowledgment to cdaley@fnal.gov. Failure to acknowledge may lead to disqualification.
- Send any written questions to Chris Daley at cdaley@fnal.gov by Tuesday, December 1, 2026. The time of day is not stated.
- Complete the Exhibit K price form with a total firm fixed price in words and numbers, all 19 breakdown lines, and an add or deduct for each bid alternate. Sign it.
- Email the proposal to cdaley@fnal.gov by 4:00 PM Central on December 17, 2026, as separate Part I and Part II files. File size limits: Not stated.
- Include a bid guarantee of at least 20 percent of the bid price, capped at $3 million, three years of audited statements, a Treasury-listed surety letter, the SARC and PUR-466 forms, and the safety questionnaire. How to request a site visit slot: Not stated.
Attached files
From SAM.gov. Download links open the original files.
- Exhibit Q- Davis Bacon Wage Rate.pdf Not read: over our length limit.
- Exhibit H - Construction Insurance Requirements.pdfInsurance minimums you must carry and show on certificates; read and confirm with your broker, nothing to sign here. Read.
- Exhibit K- Price Proposal Form.pdfPrice form you must complete, sign and send with your proposal. Read.
- Exhibit E- Electrical (LV) Calculations.pdf Not read: over our length limit.
- Exhibit D- Geotechnical Engineering Report.pdf Not read: over our length limit.
- Exhibit L- Subcontractor Annual RepsCerts-SARC. Rev 8.pdf Not read: over our length limit.
- Exhibit I - Statement of Acknowledgment (SF-1413).pdfLabor clause acknowledgment form for the subcontractor; read it, since it is part of the award paperwork. Read.
- Exhibit F- Army Corp NPR-Letter.pdf Not read: over our length limit.
- Amend 03 CUB Electrical Upgrade As-Builts.pdf Not read: over our length limit.
- Exhibit O- FL-42 (Rev 1.25) - Payment Bond.pdf Not read: over our length limit.
- Amend 02 to RFP 376508-CD.pdf Older version, not read.
- Amend 03 to RFP 376508-CD.pdf Older version, not read.
- Exhibit P- Performance Bond_FL-40.pdf Not read: over our length limit.
- Exhibit S- Sample Firm-Fixed-Price Subcontract.pdfSample subcontract showing payment, retention and reporting terms; read it, nothing to sign now. Read.
- Exhibit G- FFDG General Terms and Conditions for Construction (08.2025).pdf Not read: over our length limit.
- Exhibit B- Construction Drawing Set.pdf Could not be read.
- Exhibit C- Specification Set- New CHW Plant and CUB Upgrades.pdfTechnical specifications; only pages 1-14 and 2107-2115 were provided, so you must read the rest yourself. Read only. Read in part (pages 1–14 and 2107–2115 of 2115).
- Exhibit N- Bond Bid FL-41.pdf Not read: over our length limit.
- Amend 04 to RFP 376508-CD.pdfLatest amendment with the December 17 due date, question answers and new site visit dates; you must acknowledge it and return a signed copy. Read in part (pages 1–10 and 48–57 of 57).
- Exhibit J - Fermilab Subcontractor Safety Information Questionnaire.pdfInjury and illness questionnaire you must complete, sign and submit with your proposal. Read.
- 1.0 RFP 376508-CD Instructions to Offerors.pdfMain RFP instructions covering evaluation, pass or fail tests and submission format; you must read it and return the forms it lists. Read.
- Exhibit A - Scope of Work UIP SP-1 CUB.pdfStatement of work describing the addition and upgrades; read only, nothing to sign. Read.
- Amend 01 to RFP 376508-CD.pdf Older version, not read.
- Amend 03 Submittal for DHP-CU-1.pdf Scanned image, not read.
- Amend 03 CUB Original As-Built Drawings.pdf Scanned image, not read.
- Exhibit M- Proposal Cerftifications Form PUR-466_r5_10.14.25.pdf Not read: over our length limit.
3 more files from a ZIP archive
- Y-CU1A.JPEG Could not be read.
- Y-CU1B-Pic 1.JPEG Could not be read.
- Y-CU1B-Pic 2.JPEG Could not be read.
Download the archive from SAM.gov.
Not stated in what we read
- Estimated value of the subcontract; the notice does not state it.
- Exhibit Q wage rates and Exhibit B drawings, which could not be reviewed; read them on SAM.gov before pricing labor or work.
- Whether a site visit is mandatory and how to reserve a slot.
- The time of day for the December 1, 2026 question deadline.
- Liquidated damages or late-completion penalties; the General Terms (Exhibit G) were not provided.
- Which forms must go with the proposal and which only after award.
Notice text
On November 19, 2026, Amendment No. 4 was issued to provide responses to questioins received from prospective offerors, Replace Exhibts G, L, and M with Revised Exhibits, provide informational documents, and add additional site visit dates. On Ocotber 30, 2026, Amendment No. 3 was issued to provide responses to questioins received from prospective offerors, provide as-built drawing and photos for reference only, extend thequestions due date to December 1, 2026, and to extend the proposal due date to December 17, 2026.
On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. 1. On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits. This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements.
It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.
The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027.
This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete. Milestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.
As published on SAM.gov.
Contacts
- Chris Daley, cdaley@fnal.gov, 6308404256
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 20, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 17, 4:00 PM CT22 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 236210, industrial building construction, soonest deadline first.
- Department of the NavyHangar 140 Renovations at Naval Air Staton (NAS) Jacksonville (Jax), Jacksonville, Florida
- Bureau of Indian AffairsGreenhouse build at Wingate High School, Fort Wingate, NM
- Department of the Air ForceConstruction and repair work at Bolling AFB, DC
- Department of the ArmyF-15EX 8-Bay Maintenance Hangar Complex-Industry Day
- Department of the Air ForceConstruction and repair contract, Tinker AFB, OK
- Department of the NavyDD4 duct insulation replacement at NNSY
- Department of the Air ForceConstruction and airfield repair at Travis AFB, CA
Free · at most one email a morning
Get new notices from Department of Energy by email
Each morning we'll send the new solicitations and sources-sought notices from Department of Energy, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy